Olefins-III TA17 Decoke Line Replacement
05-23-2020 | Posted inScope of work includes The project scope is pre-fabrication and replacement of Decoke header in Olefins-III.
Read MoreElectrical works for MP-EVA0-B-01-04-61 -Ethylene Pump at EVA plant.
05-23-2020 | Posted inScope of work includes • Erection / dismantling of scaffolding along with existing pipe rack. • 3 Runs, 440 meters of 3CX150mm2 power cable will be laid on existing cable tray/ladders from MCC panel to the consumer junction box. • 1 Run, 440 meter of 5CX2.5mm2 control cable will be...
Read MorePERFORM PREVENTIVE MAINTENANCE FOR DIESEL GENERATORS
05-23-2020 | Posted inScope of Work includes: Performing preventive maintenance in different locations in eatern region (AIWSP, QSWP and others.) Perform preventive maintenance for Diesel Generator.
Read MoreInspection and Repairing of 4 MVA Transformer at Arar Power Plant Extensıon IV Project
05-23-2020 | Posted inScope of Work includes 4 MVA, 4.16/0.48KV Transformer inspection, electrical testing, gasket replacement, oil filtration and filling work & Oil Sampling and Oil Testing.
Read MoreEmergency Work for KV-592642 ; ASU KV Forward Plan
05-23-2020 | Posted inScope of work includes 1. Unbolting of old valve, 2. Removal of old valve by Crane (160 Ton), 3.Cleaning of flange faces, 4.New valve KV-592642 mobilization from Temal workshop to site, 5.Valve KV-592642 installation by crane, 6.Gasket installation and manual bolt tightening, 7.Torquing
Read MoreInstallation of Electrical Heat Tracing System
05-23-2020 | Posted inScope of work includes 1.Extension/Modification of two no. of cables after installation of PRVs in existing pipeline 2. Removal & Reinstatement of heat tracing cable & termination from 8 nos of new PRVs
Read More2EG/2UTL Piping and Valves Job Package TAM 2017
05-23-2020 | Posted inScope of work includes Piping, Pre-Fabraction, Scaffolding, Marking, cutting and Replacement of the Affected pipe portion according to isometric drawings, steam trap, affected vent, replacement of the sealant box for ethylene line drain, bevling of new piping by pass, Removing & replacement of Isolation valves, Welding & Installation of piping...
Read MoreScaffolding Services at Abqaiq Plants
05-23-2020 | Posted inScope of work includes Scaffold Services at Abqaiq Plants including Tower Interior, Tower Exterior & Mobile tower Exterior. Certified Manpower like Scaffolding Supervisors, Scaffolding Inspectors & Work permit Receiver etc are involved in the job.