Trial Excavation Works for Replace Boilers at Berri Gas Plant
05-23-2020 | Posted inScope of works includes Demolition & Disposal od existing concrete slab / asphalt pavement. Trial excavation works. Backfilling using excavated soil & cleaning. Reinstallation of pavement.
Read MorePiping works for Gas Jubail project
05-23-2020 | Posted inScope of work includes. Scaffolding installation and removal, FRP Piping installation and jointing and hydrotest.
Read MoreCivil Works for Washing Facility for Clean Room
05-23-2020 | Posted inCivil Works for Washing Facility for Clean Room at the Sipchem plant.
Read MoreTransformer Dismantling, Lifting and mobility services at Khulais S/S
05-23-2020 | Posted inScope of work includes Inspection of 250 MVA Transformer at Workshop, including dismantling, Loading, Transportation from Khulais S/S to workshop
Read MoreSupply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor Building at Ammonia Plant
05-23-2020 | Posted inScope of work includes Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor, and installation of isolation switch for new crane, power, grounding cables, cable tray supports, termination Jb, wireless pannel with radio remote control. Civil works includes road cutting and paving road with concrete excluding culvert...
Read MoreCivil Foundation for DMS Heater
05-23-2020 | Posted inScope of work includes Cutting the existing slab,excavation,backfilling and compaction. Construction of 2 foundations(1x1x0.3)m and (1.15x1x0.3)m. Fixing insert plate and anchor bolts as per provided drawing.
Read MoreReplacement of CS Sulphuric Acid Lines of SF3-SF4 (AF-1540071)
05-23-2020 | Posted inScope of work includes Procurement of piping items as per the provided isometrics, Fabrication of piping including shop NDT, Erection of piping including site NDT, Demolition of existing piping, Procurement and installation of pipe supports, Scaffolding erection and dismantling, Painting and sand blasting, Testing and commissioning
Read MoreDisplaced Pipeline Repair and Rectify
05-23-2020 | Posted inThe project scope is the repair for the displaced pipelines in SABTANK and the supports rectification for the piping.
Read More