Supply of Instrument Technicians during MTBE T/A 2015
05-23-2020 | Posted inThe project scope includes supply of manpower (instruments technicians) to fulfil the T/A requirement during MTBE T/A 2015.
Read MoreFabrication of (5) Nos. of BRM Operator Shelter Offices in MTBE Plant
05-23-2020 | Posted inThe project scope includes procurement, design, engineering, manufacturing, testing, fabrication and supply of 05 No. of Blast Proof Portables (explosion proof cabins) for the MTBE plant.
Read MoreIn-Field Cable Pulling for Limit Switch and Work Inside PIB
05-23-2020 | Posted inScope of work include. Installation of Cables for Panel to Panel Interconnection inside PIB Wiring of Cables as per Provided ILDs. Installation of Cable Panel to Panel inside PIB Ferruling & Cable Tagging Re-wire the current connection by changing current terminal to new terminal Cable Testing & Loop Checking
Read MoreKhurais Oil Train 1,2,3 & 4 Plant SD Hydrotorque Flange Bolts
05-23-2020 | Posted inBolt Torquing & Tensioning Services at Aramco Khurais Facilities for shut down requirement
Read MoreLHS Drumming Line in Packaging Centre to provide Electrical Heat Tracing Services
05-23-2020 | Posted inScope of Works includes. Installation of Heating Cable (Self-Regulating Type) on newly installed Pipeline, Power Junction Box & Accessories, RTD Sensor, End & Splice Termination Kit, Inline Splice Kit, Fiber Tape. Installation different sizes of Conduit. Installation of Power & RTD cable from EHT Panel at MCC to field. Cable...
Read MoreModifications to Combined Pyoil to Fluxoil Line to MFC-Heat Tracing Services
05-23-2020 | Posted inScope of Works includes. Installation of Heating Cable, Power Junction Box & Accessories, RTD Sensor, End & Splice Termination Kit, Fiber Tape, cable tray, power & RTD cable, Cable glanding and termination.
Read MoreCGC 30″ Line Partially Replacement Service
05-23-2020 | Posted inScope of work includes. Fabrication & Erection of piping & Pipe supports. NDT, Painting and sandblasting, testing and pre-commissioning and commissioning support.
Read MoreElectric Heat Tracing System Installation (ATR R5201) PV TAM17
05-23-2020 | Posted inScope of works includes. Removal of insulation cladding and existing heat tracing cable from 14" as per drawing . Installation of Heat tracing cable, cable glanding and termination, cable continuity checking and installation of insulation and cladding
Read More