Upgradation of Dissolvers / Settlers Piping System at Sadaf Salt Plant, SP-151100517
05-23-2020 | Posted inScope of work includes engineering, procurement, supply, installation and commissioning of Rubber lined Carbon Steel piping system for Dissolver and Settler units at Sadaf Salt plant as the previous system of CS was facing frequesnt leakages.
Read MoreLifting Beam with Trolley in Manturbo Shed
05-23-2020 | Posted inScope of work includes field engineering like floor activites, field route changes to modify the platform, trolley for gear box so that it can be removed during the TAM for the removel and re-installation of compressor casing. It also includes NDT, welding and other related activities.
Read MoreFlange Facing (Machining) for EPC 10 & 11 at JRTP – T2220
05-23-2020 | Posted inScope of work includes hire of manpower and equipment to carry out in-situ flange facing / re-facing services to be performed at Jazan Refinery and Terminal Project at EPC 10 & 11
Read MoreUpgradation of PLC System in Existing Packaging Lines at Yanpet
05-23-2020 | Posted inScope of work includes PLC (S5-S7) upgrade with visualization system installation of 6 lines of packaging machine field installation at Yanpet plant
Read MoreIBB Switchyard Insulator Cleaning
05-23-2020 | Posted inProject scope consist of washing of 230 kV Substation outdoor RTV Coated Bushing/Insulators (totals=@70 Nos) with DM water. Cleaning of insulators with low pressure hydro jet pump and hand wiped with soft cloth choked with DM water without damaging the RTV coating.
Read MoreSFC: 474-TR-400 SFC FOR Bolt Torquing
05-23-2020 | Posted inScope of work includes bolt torquing services for T&I for the area 474-TR-400
Read More