Bolt Torqueing & Tensioning for KT-221 GT Area
05-23-2020 | Posted inProvision of Hydraulic bolt tightening (torque machine) to loosen and tighten the bolts of the compressor KT-221 in North Gas Treat Area.
Read MoreGeneral Construction Works for Replace Utility Packaged Boilers Project at Berri Gas Plant
05-23-2020 | Posted inIt includes general civil works, concrete works, structural erection, equipment erection, piping works, instrumentation works, electrical works, insulation works, painting works, fireproofing work for Replace Utility Packaged Boilers Project at Berri Gas Plant.
Read MoreDemolition of abandoned Caustic Tank and Piping in Ras Tanura Clean Fuels Project
05-23-2020 | Posted inDemolition of reinforced concrete foundations, demolition of bitumen sand in tank bases, supply and execution of backfilling in foundations, pits, extrados of walls, trenches and channels, Loading, transport and unloading of remainder material from excavation out of the limits of property in an external authorized dumping area.
Read MoreEarly works for Demolition of Abandoned Pipe Corridor
05-23-2020 | Posted inDemolition of reinforced concrete sleepers; excavation in general soil, up to 3 meters deep including dewatering; supply and execution of backfilling in foundations, pits, extrados of walls, trenches and channels, carried out in layers with borrowed material; lading, transport and unloading of remainder material from excavation out of the limits...
Read MoreUpgrade HGP Area Alerting System
05-23-2020 | Posted inThe scope includes preparation of doundation design power layout and other engineering requirements to install new electronic multi-tone emergency sirens. Contractor shall size and route the cable from junction box mounted in the omni directional antenna to the control room and preparation of necessary structural foundations.
Read MoreTorqueing for GT-2 T&I at Hawiyah Plant
05-23-2020 | Posted inProvision of Torqueing crews for Hydraulic services at Hawiyah Gas plant on a 12Hr shift. Hydraulic torqueing and opening shall be performed at H48 at GT#2 during T&I.
Read MoreFiber Optics Troubleshooting Services (01 Year Contract)
05-23-2020 | Posted inMaintenance, troubleshooting and site support services for Fiber Optic Cable Communication of Sabtank ESD System, DCS system, PLC systems, RTG system and Instrumentation. These services include: 1. Fiber Optic Cable Communication for GE FANUC ESD -PLC systems, Yokogawa DCS system, RTG system and Instrumentation installed for all SABIC and Non-SABIC...
Read MorePlate Vehicle Recognition System for Saudi Aramco Northern Arabia Area Unconventional Gas (UG) Surface Facilities System-B Project
05-23-2020 | Posted inThe scope inlcudes EPC of PRS Color CCD Camera, Lenses for PRS Color CCD Camera, Housing for PRS Color CCD Camera, PRS Infrared (IR) Iiluminators, PRS Poles and Mounts, Loop Detector, Visual Alarm Light, PRS Audiable Alarm / Speaker, PRS Switch, PRS Controller, KVM Receiver, Hydraulic crash barrier along with...