Replace Water Chemical Injunction System at Abqaiq Plant
08-08-2021 | Posted inThe project scope of work includes Engineering, Procurement and Installation of thirteen (13) chemical injection skids with associated steel structure modification, piping and E&I works including commissioning work (EPCC). Five (5) chemicals skids inject chemicals in boilers area and eight (8) chemicals inject chemicals in cooling water area along with...
Read MoreInstallation of New Seed Filtrate Pump (461F-PUFI-1171)
05-23-2020 | Posted inThe scope of work is to install new pump (461F-PUFI-1171) of same sizing (12/10 with 400 Kw) in current Seed Filtrate pumps Circuit. It involves several activities such as construction of new foundation, trench, temporary bund wall, installation of new supports, modification of existing supports. It also includes Fabricatation and...
Read MoreSupply of Blast Proof Porta-cabins & Ablution Units for EGDMC Plant SD’2020, SAUDI KAYAN
05-23-2020 | Posted inThe scope of work is to provide Blast / Explosion proof porta-cabins (units) along with ablution units, diesel generators, normal porta-cabins along with the provision of diesel fuel and operators.
Read MoreValve Inspection and Valve Overhaul Works for PRC 2020 Turn Around Project
05-23-2020 | Posted inThe project scope consists of two activities. These are: Inspection and Stroke test: 1. Disconnect/Install instrument and electrical connections of valves that require overhauling. 2. Field stroke test of valves by using Fluke valve testers. 3. Diesel Generator for the electrical actuator stroke test. Overhauling activities: 1. Cleaning of Valve...
Read MoreRental/Supply/Services of Miscellaneous Tools for Bolt Torquing for Turn Around 2020
05-23-2020 | Posted inThe scope of work is to carry-out bolt torquing and tensioning activities for the PetroRabig company (PRC) T/A 2020. It also involes provision of Hydraulic Winch, Flange Spreader, nut splitter and serration activities on required basis.
Read MoreSupply of Heaters for SADARA
05-23-2020 | Posted inThe scope of work is to supply Circulation heater for nitrogen gas c/w. It has features of: - 2” fiber glass thermal insulation encased in painted steel jacket - ANSI 1”-150lb SORF flanged inlet & outlet nozzle.
Read MoreIndependent Line for PK BoG Project // PK Tail Gas Pgase II // MOC-5471, SP-191400011
05-23-2020 | Posted inThe scope of work is procurement, fabrication, installation of piping, electrical, instrumentaiton, civil, structural, and architectural works for the PK Tail Gas Project. It invlves demolition of existing lines, installation of modified lines, control valves, pipe supports, NDE, RT and PT. It also includes suppply of power for CP, associated...
Read MoreConsolidated Design Gap Rectification Modifications
05-23-2020 | Posted inThe scope of work is design, engineering (by OEM), procurement, suppply and installation of EHT materials. It also includes installation of Heating Tracing System on Polyols Pipeline, Power JBs, RTD sensor, DP power, splice kit for T0joints, binding tapes, conduits, trays, cable glands, new insulations, cladding, scaffodling, and as well...
Read More