Oil & Gas |
Emergency Shutdown In Gas Phase-8
Sector |
Oil & Gas |
Project Title |
Emergency Shutdown In Gas Phase-8 |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/19 |
End Date |
01/08/19 |
Scope of work |
The SOW includes several activities for DCAC Chilled water distributior damage such as:
– All nozzles removal, hydro-jet cleaning, insopection & installation.
– Main distributor header disconnection, repaired, hydro-jet cleaning and installation.
– Operating pressure leak test done after above mentioned activities.
– One leaked nozzle repaired and install back.
|
|
Gas Jubail |
Jubail |
01/08/19 |
01/08/19 |
Petrochemical |
LSTK Project for Cold Box Replacement in Olefin-II
Sector |
Petrochemical |
Project Title |
LSTK Project for Cold Box Replacement in Olefin-II |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
PSD |
Location |
Jubail |
Start Date |
10/10/19 |
End Date |
31/01/20 |
Scope of work |
The detailed SOW includes:
– Construction of new foundations (02 off) for cold box, Coalescers, Instrument Racks & Lamp post.
– Installation of Coalescers, PSV platforms with related Piping, Civil & Steel works.
– Ground preparation for heavy lifting, modification in fence type gate for new cold box entry, removal of perlite/filling, structure, earthing, piping, and other necessary equipments from existing cold box.
– Installation of new cold box, steel structures, supports, piping with NDT, painting, insulation, perlite filling, monorail, conduit and accessories, power and control cables, trays, lighting JBs, Tubing, various instruments, Thermowell, multicore & single pair cables, and DCS/ESD & firefighting system etc.
|
|
PetroKemya |
Jubail |
10/10/19 |
31/01/20 |
Petrochemical |
LSTK Project for Upgrade LP steam Control Valve (PV-1703) at OLF-II TA-2019
Sector |
Petrochemical |
Project Title |
LSTK Project for Upgrade LP steam Control Valve (PV-1703) at OLF-II TA-2019 |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
PSD |
Location |
Jubail |
Start Date |
13/10/19 |
End Date |
31/12/19 |
Scope of work |
The detailed SOW includes:
– Demolition of Existing 36” Pipe line 22mtrs
– Removal of 24” Isolation valve and 22” Control Valve.
– Modification of existing line and Installation of 30” Control valve.
– Supply, fabrication and installation of new line along with the insulation works
– Supply, fabrication and erection of steel structure related to modification job.
– Painting and Installation of new Control Valve and Pressure Transmitter.
|
|
PetroKemya |
Jubail |
13/10/19 |
31/12/19 |
Petrochemical |
Additional Piping, Valves and DCR Repair Services for 3EG & 3UTL during TAM 2019
Sector |
Petrochemical |
Project Title |
Additional Piping, Valves and DCR Repair Services for 3EG & 3UTL during TAM 2019 |
Project Owner |
SABIC |
Client |
Sharq |
Department |
PSD |
Location |
Jubail |
Start Date |
01/09/19 |
End Date |
01/12/19 |
Scope of work |
The project scope includes to piping & valves replacement, removal of existing pipe line & valves, fabrication of new pipe line as per IFC, Installation of pipe line, installation of valves, NDT & painting in SHARQ Plant
Jubail
|
|
Sharq |
Jubail |
01/09/19 |
01/12/19 |
Petrochemical |
Pre-Fabrication, Repair & Replacement of Pipelines during VCM T/A’2019
Sector |
Petrochemical |
Project Title |
Pre-Fabrication, Repair & Replacement of Pipelines during VCM T/A’2019 |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
PSD |
Location |
Jubail |
Start Date |
01/09/19 |
End Date |
01/04/20 |
Scope of work |
The Scope include the site verification and preparation of isometric for the line to be replaced, Pre-fabrication of lines at SENDAN workshop facility, repair/ replacement of old lines and installation of new lines during VCM Plant Turnaround scheduled in October 2019. Total Dia-inches is approx. 4,000; SAFERAD and Radiography crew is considered, Hydro/pneumatic testing of lines, external sand blasting and Painting of prefabricated pipe spools and cold cutting activities.
|
|
PetroKemya |
Jubail |
01/09/19 |
01/04/20 |
Petrochemical |
To Replace the existing heater with design improvements Project phase II , Construction Services
Sector |
Petrochemical |
Project Title |
To Replace the existing heater with design improvements Project phase II , Construction Services |
Project Owner |
SABIC / IBN ZAHR |
Client |
Tecnicas Reunidas |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/19 |
End Date |
|
Scope of work |
The Project Scope includes the replacement services for Heat Exchanger. The Brief scope of work is Demolition of Insulation, Demolition of Insturment, Demolition of Spools, Installation of new Heater, Installation of Bricks & Mortar, Installation of Piping & associated components, Installation of Tray, cables, JB & Panels, Cable Termination, of Insulation, Painting & Touchup, NDT, Testing & commissioning
|
|
Tecnicas Reunidas |
Jubail |
01/08/19 |
|
Mining & Minerals |
Boiler FW PHE Perf Measurement Instrument
Sector |
Mining & Minerals |
Project Title |
Boiler FW PHE Perf Measurement Instrument |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
01/09/19 |
End Date |
01/12/19 |
Scope of work |
The Project Scope includes Civil / Structural, Mechancial & Piping, Electrical & Instrumentation works
|
|
Ma'aden Aluminium |
Ras Al-Khair |
01/09/19 |
01/12/19 |
Petrochemical |
RIK for Tube Bundle – Ethane Recycle Emergency Heater 11E114 at Ethylene Plant
Sector |
Petrochemical |
Project Title |
RIK for Tube Bundle – Ethane Recycle Emergency Heater 11E114 at Ethylene Plant |
Project Owner |
SABIC |
Client |
Sadaf |
Department |
TSD |
Location |
Jubail |
Start Date |
01/07/19 |
End Date |
01/10/19 |
Scope of work |
The project scope is Procurement of materials, fabrication, testing and supply for
Tube Bundle – Ethane Recycle Emergency heater (11-E-114) with all materials,
consumables, tools like-to-like as per provided drawings and datasheet by
SADAF
|
|
Sadaf |
Jubail |
01/07/19 |
01/10/19 |