Petrochemical |
Coupling Repair for Sea Water Pump P-5615 in Plant-V
Sector |
Petrochemical |
Project Title |
Coupling Repair for Sea Water Pump P-5615 in Plant-V |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
TSD |
Location |
Jubail |
Start Date |
Jan-2020 |
End Date |
Mar-2020 |
Scope of work |
The scope of work is repair of coupling for the Sea Water pump in Plant-V. It includes manufacturing of SHIM set, balancing and testing of the same after the repair is completed.
|
|
Ar-Razi |
Jubail |
Jan-2020 |
Mar-2020 |
Petrochemical |
MRO Warehouse Operation Services Contract LFC (5 Years)
Sector |
Petrochemical |
Project Title |
MRO Warehouse Operation Services Contract LFC (5 Years) |
Project Owner |
SADARA |
Client |
Sadara |
Department |
HRS |
Location |
Jubail |
Start Date |
Jan-2020 |
End Date |
Jan-2025 |
Scope of work |
The scope of work is provision of manpower, supervision, tools, and such materials that may be required to perform the warehouse operation activities and preservation services of all identified materials (Equipment). The activities shall be carried out in the MRO facilities Warehouses and Laydown Areas.
|
|
Sadara |
Jubail |
Jan-2020 |
Jan-2025 |
Oil & Gas |
Supply & Rental of Blast Proof Portables (BRM)
Sector |
Oil & Gas |
Project Title |
Supply & Rental of Blast Proof Portables (BRM) |
Project Owner |
Saudi Aramco |
Client |
Saipem |
Department |
RGSS |
Location |
Jazan |
Start Date |
Oct-2019 |
End Date |
Feb-2020 |
Scope of work |
The scope of work is procurement, manufacturing and supply of blast proof porta-cabins (explosion proof units) for the Jazan project. It also includes provision of chairs and tables for the units for personnel.
|
|
Saipem |
Jazan |
Oct-2019 |
Feb-2020 |
Oil & Gas |
Instumentation Works for Petrorabigh Refining & Petrochemical Company (PRC) T/A 2020 Project
Sector |
Oil & Gas |
Project Title |
Instumentation Works for Petrorabigh Refining & Petrochemical Company (PRC) T/A 2020 Project |
Project Owner |
Petro Rabigh |
Client |
GS E & C |
Department |
PSD |
Location |
Yanbu |
Start Date |
Oct-2019 |
End Date |
Apr-2020 |
Scope of work |
The project scope is Instrumentation works during the PRC T/A-2020. Activities such as: Grounding & Lighting Work, Cable Installation, Installation of Electrical Heater, Cathodic Protection Inspection, MOV Cable Disconnection & Connection, Replacement of the Instrument, Replacement of the Tubes, Installation of Tubes, Checking of Junction Boxes & Hand Switches, IWS & EWR and Loop Checking includes in the package.
|
|
GS E & C |
Yanbu |
Oct-2019 |
Apr-2020 |
Petrochemical |
SF2 Replacement of Ammonia Vaporizer, Ammonia Heater & Chill Water Heater, SP-184000041
Sector |
Petrochemical |
Project Title |
SF2 Replacement of Ammonia Vaporizer, Ammonia Heater & Chill Water Heater, SP-184000041 |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
TSD |
Location |
Jubail |
Start Date |
Oct-2019 |
End Date |
Mar-2020 |
Scope of work |
The project scope is Procurement of materials, fabrication, testing and supply of 03 Nos. of FABRICATION & SUPPLY OF CHILLER WATER HEATER(5-E-104), AMMONIA HEATER (5-E-103) AND AMMONIA VAPORIZER (5-E-102B) like-to-like (RIK) as per provided drawings and datasheet by SAFCO.
|
|
SAFCO |
Jubail |
Oct-2019 |
Mar-2020 |
Petrochemical |
RIK for Tube Bundle – Cracked Gas Compressor 1st stage 11E12B at Ethylene Plant
Sector |
Petrochemical |
Project Title |
RIK for Tube Bundle – Cracked Gas Compressor 1st stage 11E12B at Ethylene Plant |
Project Owner |
SABIC |
Client |
SADAF |
Department |
TSD |
Location |
Jubail |
Start Date |
Oct-2019 |
End Date |
Dec-2019 |
Scope of work |
The project scope is Procurement of materials, fabrication, testing, design and supply for Tube Bundle for Cracked Gas compressor first stage (11-E-23B) with all materials, consumables, tools like-to-like as per provided drawings and datasheet by SADAF.
|
|
SADAF |
Jubail |
Oct-2019 |
Dec-2019 |
Mining & Minerals |
Supply of Shell and Tube Heat Exchangers
Sector |
Mining & Minerals |
Project Title |
Supply of Shell and Tube Heat Exchangers |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
TSD |
Location |
Jubail |
Start Date |
24/10/19 |
End Date |
30/04/20 |
Scope of work |
The SOW includes Procurement of materials, fabrication & manufacturing of Heat Exchangers as per TEMA / ASME sec VIII Div. 1., Painting works, Inspection and testing, 100% UT of forgings for tube sheet before drilling/machining, 100% DPT of tube sheet after drilling/ machining, Tube-to-tube sheet joints as per drawings/data sheets provideed by MAC.
|
|
Ma'aden Aluminium |
Jubail |
24/10/19 |
30/04/20 |
Oil & Gas |
LSTK for Supply of Manpower and Auxiliary Equipments for Danieli deficiency jobs for SPLP-II during TA-19
Sector |
Oil & Gas |
Project Title |
LSTK for Supply of Manpower and Auxiliary Equipments for Danieli deficiency jobs for SPLP-II during TA-19 |
Project Owner |
SABIC |
Client |
Hadeed |
Department |
PSD |
Location |
Jubail |
Start Date |
15/09/19 |
End Date |
20/10/19 |
Scope of work |
The LSTK job includes: Supply of skilled/Semi skilled mechanical fitters, electricians, welder, fabricators, riggers
and helpers, and Supply of lifting equipment and welding machines. The activities are to be carried out in Continuous Casting Machine (CCM), LF CaSi wire feeding system, LF alloy belt NBC06, EAF DRI feeding belts (RBC01 and EBC01).
|
|
Hadeed |
Jubail |
15/09/19 |
20/10/19 |