Oil & Gas |
Valve Inspection and Valve Overhaul Works for PRC 2020 Turn Around Project
Sector |
Oil & Gas |
Project Title |
Valve Inspection and Valve Overhaul Works for PRC 2020 Turn Around Project |
Project Owner |
Petro Rabigh |
Client |
GS E & C |
Department |
TSD |
Location |
Yanbu |
Start Date |
Nov-2019 |
End Date |
Apr-2020 |
Scope of work |
The project scope consists of two activities. These are:
Inspection and Stroke test:
1. Disconnect/Install instrument and electrical connections of valves that require overhauling.
2. Field stroke test of valves by using Fluke valve testers.
3. Diesel Generator for the electrical actuator stroke test.
Overhauling activities:
1. Cleaning of Valve before dismantling for removing of chemical contamination.
2. Dismantling of valve and Cleaning of trim parts.
3. Lapping of Body seats, disc/ball seat and Assembly of Valve.
4. Hydro testing of valve as per API 598 and ANSI FCI 70-2.
5. Preparation of hydro test report of valve.
|
|
GS E & C |
Yanbu |
Nov-2019 |
Apr-2020 |
Oil & Gas |
Rental/Supply/Services of Miscellaneous Tools for Bolt Torquing for Turn Around 2020
Sector |
Oil & Gas |
Project Title |
Rental/Supply/Services of Miscellaneous Tools for Bolt Torquing for Turn Around 2020 |
Project Owner |
Petro Rabigh |
Client |
GS E & C |
Department |
BT |
Location |
Yanbu |
Start Date |
Dec-2019 |
End Date |
Apr-2020 |
Scope of work |
The scope of work is to carry-out bolt torquing and tensioning activities for the PetroRabig company (PRC) T/A 2020. It also involes provision of Hydraulic Winch, Flange Spreader, nut splitter and serration activities on required basis.
|
|
GS E & C |
Yanbu |
Dec-2019 |
Apr-2020 |
Petrochemical |
Supply of Heaters for SADARA
Sector |
Petrochemical |
Project Title |
Supply of Heaters for SADARA |
Project Owner |
SADARA |
Client |
Sadara |
Department |
E&I |
Location |
Jubail |
Start Date |
Nov-2019 |
End Date |
Mar-2020 |
Scope of work |
The scope of work is to supply Circulation heater for nitrogen gas c/w. It has features of:
– 2” fiber glass thermal insulation encased in painted steel jacket
– ANSI 1”-150lb SORF flanged inlet & outlet nozzle.
|
|
Sadara |
Jubail |
Nov-2019 |
Mar-2020 |
Petrochemical |
Independent Line for PK BoG Project // PK Tail Gas Pgase II // MOC-5471, SP-191400011
Sector |
Petrochemical |
Project Title |
Independent Line for PK BoG Project // PK Tail Gas Pgase II // MOC-5471, SP-191400011 |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
PSD |
Location |
Jubail |
Start Date |
Nov-2019 |
End Date |
Apr-2020 |
Scope of work |
The scope of work is procurement, fabrication, installation of piping, electrical, instrumentaiton, civil, structural, and architectural works for the PK Tail Gas Project. It invlves demolition of existing lines, installation of modified lines, control valves, pipe supports, NDE, RT and PT. It also includes suppply of power for CP, associated instruments, pressure transmitters, excavation & backfilling for U/G pipes, steel structures as well as asphalt concrete paving road works.
|
|
Ar-Razi |
Jubail |
Nov-2019 |
Apr-2020 |
Petrochemical |
Consolidated Design Gap Rectification Modifications
Sector |
Petrochemical |
Project Title |
Consolidated Design Gap Rectification Modifications |
Project Owner |
SADARA |
Client |
Sadara |
Department |
E&I |
Location |
Jubail |
Start Date |
Nov-2019 |
End Date |
May-2020 |
Scope of work |
The scope of work is design, engineering (by OEM), procurement, suppply and installation of EHT materials. It also includes installation of Heating Tracing System on Polyols Pipeline, Power JBs, RTD sensor, DP power, splice kit for T0joints, binding tapes, conduits, trays, cable glands, new insulations, cladding, scaffodling, and as well as testing and commissioning services for the installed items.
|
|
Sadara |
Jubail |
Nov-2019 |
May-2020 |
Oil & Gas |
Replace Water Chemeical Injuction System at Abqaiq Plant
Sector |
Oil & Gas |
Project Title |
Replace Water Chemeical Injuction System at Abqaiq Plant |
Project Owner |
Saudi Aramco |
Client |
Abqaiq Plant |
Department |
PSD |
Location |
Abqaiq |
Start Date |
Dec-2019 |
End Date |
Mar-2021 |
Scope of work |
The scope of work is design, engineering, supply and installation of thirteen (13) chemical injection skids. Each chemical injection skid will include controlled volume pumps, tanks, agitators, gauges, strainer, filter, pressure relief valves, sight glasses, flow metering / monitoring devices, valves and associated piping accessories along with thirteen (13) static mixers (one for each chemical skid).
The Fire Protection & Detection system includes FF equipment, fire monitor, fire hose & reel, fire extinguishers, Connectivity for Monitoring between the Fire Devices inside Analyzer Shelter & High sensitivity smoke detectors (HSSD) for associated New DCS System Cabinets to the DCS and existing FACP systems.
Electrical and instrumentation includes power supply to all skids, lighting works, extension of existing control gears, circuit breakers, motor controllers, dry type transformers, and grounding of the equipments along with DCS, HMI, DAHS, and other control and automation activities. It also includes provision of foundation for steel structure shed, relocation of smoking shelter, conductivity analyzers, environmentally controlled analyzer shelter .
|
|
Abqaiq Plant |
Abqaiq |
Dec-2019 |
Mar-2021 |
Oil & Gas |
Replacement of MAC Motor and Exciters at Phase 5 during Emergency S/D
Sector |
Oil & Gas |
Project Title |
Replacement of MAC Motor and Exciters at Phase 5 during Emergency S/D |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
Dec-2019 |
End Date |
Dec-2019 |
Scope of work |
The scope of work is replacement of MAC motor during emergency S/D. It involves preparation of new motor for lifting using 700 Ton crane to the prescribed locaiton. Removal of the old motor from an elevated lovel using the overhead crane and installation of new motor to the compressor.
|
|
Gas Jubail |
Jubail |
Dec-2019 |
Dec-2019 |
Oil & Gas |
MFC: FLANGES TORQUEING AND TENSIONING SRU T&Is
Sector |
Oil & Gas |
Project Title |
MFC: FLANGES TORQUEING AND TENSIONING SRU T&Is |
Project Owner |
Saudi Aramco |
Client |
Uthmaniyah Gas Plant |
Department |
BT |
Location |
Uthmaniyah |
Start Date |
Dec-2019 |
End Date |
Dec-2022 |
Scope of work |
The scope of work is provision of manpower, tools and necessary equipment for the loosening, tightening of blinds, manways, flanges and covers. The activity has to be carried out in the three years duraiton to be utilized for various T&Is of UGP.
|
|
Uthmaniyah Gas Plant |
Uthmaniyah |
Dec-2019 |
Dec-2022 |