Oil & Gas |
Upgrade Fire Protection System for AXL and Gas Condensate Tanks at Abqaiq Plants
Sector |
Oil & Gas |
Project Title |
Upgrade Fire Protection System for AXL and Gas Condensate Tanks at Abqaiq Plants |
Project Owner |
Saudi Aramco |
Client |
Saudi Aramco/ Abqaiq Plants |
Department |
|
Location |
Abqaiq |
Start Date |
17-Jan-21 |
End Date |
16-Jan-23 |
Scope of work |
The project scope covers the design for new non-contact-type Radar level transmitter installation for existing floating roof storage tanks and Installation of linear heat detection system (LHD) and replacement of existing Rim Seal Fire Protection system including foam system network piping, foam chambers for existing five (5) Stabilized Crude Storage Tanks at Abqaiq plants.
|
|
Saudi Aramco/ Abqaiq Plants |
Abqaiq |
17-Jan-21 |
16-Jan-23 |
Mining & Minerals |
General Construction Works for Dew Point Control Unit (DPCU), Abqaiq Plants
Sector |
Mining & Minerals |
Project Title |
General Construction Works for Dew Point Control Unit (DPCU), Abqaiq Plants |
Project Owner |
Saudi Aramco |
Client |
JGC Gulf International Co. Ltd. |
Department |
|
Location |
Abqaiq |
Start Date |
18-May-2022 |
End Date |
31-Oct-2024 |
Scope of work |
The primary objective of this project is to provide a new gas dew point control unit (DPCU) at Abqaiq NGL Plants as a permanent solution to resolve liquid condensation and accumulation in the gas pipelines.
As Gen-Con Construction Contractor major scope is to carryout complete Civil Works, Steel Structure Erection (Conventional and Conex-tech), Equipment Installation and Piping, Electrical and instrumentation, Painting, Insulation and Fire Proofing Works.
|
|
JGC Gulf International Co. Ltd. |
Abqaiq |
18-May-2022 |
31-Oct-2024 |
Water |
Replace Water Chemical Injunction System at Abqaiq Plant
Sector |
Water |
Project Title |
Replace Water Chemical Injunction System at Abqaiq Plant |
Project Owner |
Saudi Aramco |
Client |
Saudi Aramco |
Department |
|
Location |
Abqaiq |
Start Date |
25-Dec-2019 |
End Date |
25-Dec-2022 |
Scope of work |
The project scope of work includes Engineering, Procurement and Installation of thirteen (13) chemical injection skids with associated steel structure modification, piping and E&I works including commissioning work (EPCC).
Five (5) chemicals skids inject chemicals in boilers area and eight (8) chemicals inject chemicals in cooling water area along with optimum number of analyzers (20).
|
|
Saudi Aramco |
Abqaiq |
25-Dec-2019 |
25-Dec-2022 |
Oil & Gas |
Dussur SEAH Stainless Steel- Aloy Seamles Pipes And Tube Plant
Sector |
Oil & Gas |
Project Title |
Dussur SEAH Stainless Steel- Aloy Seamles Pipes And Tube Plant |
Project Owner |
|
Client |
Dussur / SeAH (JV) |
Department |
|
Location |
Ahsa |
Start Date |
2-Jul-2022 |
End Date |
31-Dec-2024 |
Scope of work |
The project entails Engineering, Procurement & Construction of the Saudi Arabia’s First Stainless Steel Seamless Pipes & Tube Plant spreading over 170,845 SQM with fully integrated manufacturing facility, having capacity to 17,000 tons of High Value Added Stainless Steel Pipes and Tube annually.
|
|
Dussur / SeAH (JV) |
Ahsa |
2-Jul-2022 |
31-Dec-2024 |
Oil & Gas |
Gas Compression Facilities Expansion, Safaniyah
Sector |
Oil & Gas |
Project Title |
Gas Compression Facilities Expansion, Safaniyah |
Project Owner |
|
Client |
Saudi Aramco |
Department |
|
Location |
Safaniyah |
Start Date |
27-June-2019 |
End Date |
22-June-2023 |
Scope of work |
The project scope includes engineering, procurement, construction, and installation at Saudi Aramco’s Safaniyah gas plant. The scope of work includes installation of filtration package/skid with associated piping and structural supports, and fire protection system to protect the black powder filters inside the plant. Power supply to new skids, cables, conduits, trays, field instrument, and DCS upgrade & modification works. It also includes civil and structural work such as demolition of existing concrete pavement, excavation, grading, radar mapping, site development, steel fabrication of pipe racks, pipe supports, and associated platforms.
|
|
Saudi Aramco |
Safaniyah |
27-June-2019 |
22-June-2023 |
Water |
Product Water By-Pass Header for Marafiq & SWCC Export Lines
Sector |
Water |
Project Title |
Product Water By-Pass Header for Marafiq & SWCC Export Lines |
Project Owner |
MARAFIQ |
Client |
JWAP |
Department |
CSD |
Location |
Jubail |
Start Date |
July-2019 |
End Date |
Mar-2020 |
Scope of work |
The scope of work includes Design & Engineering, Procurement, Construction / Installation, Testing, Pre-Commissioning for all Pipes, Equipment, Cabling, Structures & Supports for completion of the project. The brief scope of work includes, Procurement of Piping & Valves, Fabrication works, Cement Lining Works, Painting & Coating, Erection & Installation of Piping & Supports, NDT, Installation of Valves, Tie-Ins, Hydrostatic Testing, Site Surveying, Demolition of Existing Pavement, Excavation, Lean Concrete, Disposing, Reinstatement of Pavement, Civil Foundation, Construction of Valve Chamber, Laying of cables & Termination, Tube & Fittings, Earthing of Equipments, Testing & Commissioning.
|
|
JWAP |
Jubail |
July-2019 |
Mar-2020 |
Mining & Minerals |
Installation of New Seed Filtrate Pump (461F-PUFI-1171)
Sector |
Mining & Minerals |
Project Title |
Installation of New Seed Filtrate Pump (461F-PUFI-1171) |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
Sept-2019 |
End Date |
May-2020 |
Scope of work |
The scope of work is to install new pump (461F-PUFI-1171) of same sizing (12/10 with 400 Kw) in current Seed Filtrate pumps Circuit. It involves several activities such as construction of new foundation, trench, temporary bund wall, installation of new supports, modification of existing supports. It also includes Fabricatation and installation of new Nozzels, suction and discharge piping, valves and Extension of gland water piping to new Pump location. It also includes supply and installation of power cables, grounding cables, VSD, ACB, Bus-ties, profibus cable, and testing and commissioning of the activities.
|
|
Ma'aden Aluminium |
Ras Al-Khair |
Sept-2019 |
May-2020 |
Petrochemical |
Supply of Blast Proof Porta-cabins & Ablution Units for EGDMC Plant SD’2020, SAUDI KAYAN
Sector |
Petrochemical |
Project Title |
Supply of Blast Proof Porta-cabins & Ablution Units for EGDMC Plant SD’2020, SAUDI KAYAN |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
RGSS |
Location |
Jubail |
Start Date |
Dec-2019 |
End Date |
Mar-2020 |
Scope of work |
The scope of work is to provide Blast / Explosion proof porta-cabins (units) along with ablution units, diesel generators, normal porta-cabins along with the provision of diesel fuel and operators.
|
|
SAUDI KAYAN |
Jubail |
Dec-2019 |
Mar-2020 |