Metal |
Install Down Coiler-1 Curve Apron
Sector |
Metal |
Project Title |
Install Down Coiler-1 Curve Apron |
Project Owner |
SABIC |
Client |
HADEED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/11/14 |
End Date |
01/01/15 |
Scope of work |
Project involves removal of the existing swivel arm assembly and fixing of the new swivel arm assembly and wear plate of triangular frame assembly, involving mechanical and electrical jobs.
|
|
HADEED |
Jubail |
01/11/14 |
01/01/15 |
Petrochemical |
Temporary Constyruction faclilities & Early Site work, SAMAC MMA-PMMA Project
Sector |
Petrochemical |
Project Title |
Temporary Constyruction faclilities & Early Site work, SAMAC MMA-PMMA Project |
Project Owner |
SABIC / SAMAC |
Client |
CTCI |
Department |
CSD |
Location |
Jubail |
Start Date |
01/11/14 |
End Date |
01/07/15 |
Scope of work |
Project involves design of all Temporary Offices, Guard House etc. including Structural Works, Scaffolding, Clamping & Transportation.
|
|
CTCI |
Jubail |
01/11/14 |
01/07/15 |
Metal |
Replace all the cables for RRT1
Sector |
Metal |
Project Title |
Replace all the cables for RRT1 |
Project Owner |
SABIC |
Client |
HADEED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/14 |
End Date |
01/05/16 |
Scope of work |
The project “Relace all the cable for RRT1” involves cable replacement for motors # 1-60, plug and socket for motors @ 1-253, cable termination and loop checking.
|
|
HADEED |
Jubail |
01/07/14 |
01/05/16 |
Petrochemical |
Implemantation of BBP recommendations for SHP Boilers
Sector |
Petrochemical |
Project Title |
Implemantation of BBP recommendations for SHP Boilers |
Project Owner |
SABIC |
Client |
KEMYA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/14 |
End Date |
01/02/15 |
Scope of work |
Project involves Mechanical, Electrical & Instrumenattion Work. Procurement, Supply of materials, Installation, Testing and Commissioning of the implementation of BBP recommendations for SHP Boilers, modification of MOV’s & CV’s, Piping fabrication & modification works.
|
|
KEMYA |
Jubail |
01/07/14 |
01/02/15 |
Petrochemical |
Removal & Re-Installation of Refrigeration Condenser 127-CB at Ammonia Plant
Sector |
Petrochemical |
Project Title |
Removal & Re-Installation of Refrigeration Condenser 127-CB at Ammonia Plant |
Project Owner |
SABIC |
Client |
AL-BAYRONI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/14 |
End Date |
01/09/14 |
Scope of work |
Projects involves Removal of old refrigent condeser & Re-installation of new Refrigent condenser on the existing foundation, involves Mechanical piping, E & I, Structure steel, Platforms, Ladders etc., Crane services,. Inspection, Testing Commissioning.
|
|
AL-BAYRONI |
Jubail |
01/08/14 |
01/09/14 |
Petrochemical |
TIE-INS for TEG Aldehyde removal system for EG1 and EG 2 Plants
Sector |
Petrochemical |
Project Title |
TIE-INS for TEG Aldehyde removal system for EG1 and EG 2 Plants |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/14 |
End Date |
01/12/14 |
Scope of work |
Project involves Engineering, Procurement, Fabrication Demolition & Installation, Fabrication & support pre-fabrication of pipipng material, demolition of existing piping, Installation of new tie-ins, NDT Testing & Commissioning
|
|
UNITED |
Jubail |
01/07/14 |
01/12/14 |
Petrochemical |
Procure Construct Ground Flare Moification
Sector |
Petrochemical |
Project Title |
Procure Construct Ground Flare Moification |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/14 |
End Date |
01/05/15 |
Scope of work |
Project involves Fabrication, Piping, Structure, Electrical & Instrumentation works, Piping activities includes upgradation of Lp steam from 4″ to 6″, E & I activities includes installation of instruemnts & their cable laying, NDT, insulation & painting activities are also involved.
|
|
SAUDI KAYAN |
Jubail |
01/07/14 |
01/05/15 |
Petrochemical |
Heavy Glycol Loading Facility at 4EG
Sector |
Petrochemical |
Project Title |
Heavy Glycol Loading Facility at 4EG |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/14 |
End Date |
01/02/15 |
Scope of work |
EPC project on LSTK basis includes Piping, Structure, Pipe Supports, Civil, Electrical & Instrumentation. Piping activities involves modification including tie-in, Civil work include relocation of trench & foundations for pipe suppport & sheds, Elctrical & Instrumentation activities include installation, cables & glanding, termination etc.
|
|
SHARQ |
Jubail |
01/06/14 |
01/02/15 |