Oil & Gas |
Inquiry for 112-K-0003, Restoration Work, YASREF EPC-4
Sector |
Oil & Gas |
Project Title |
Inquiry for 112-K-0003, Restoration Work, YASREF EPC-4 |
Project Owner |
YASREF |
Client |
Daelim |
Department |
CSD |
Location |
Yanbu |
Start Date |
01/09/16 |
End Date |
01/03/17 |
Scope of work |
Scope of work includes Make Up H2 Compressor(112-K-0003) Train B Erection & Dismantling Work,. Dismantling & Installation of Roof Clading & Structure for Compressor Motor & Compressor Frame, Piping(Fire Water, Vent Piping, Cooling Water). Electrical & Instrument Work including,Pre-Commissioning & Commissioning Assistance, Foundation Works(Grouting & Rectification of cracks on foundation).
|
|
Daelim |
Yanbu |
01/09/16 |
01/03/17 |
Petrochemical |
Electric Heat Tracing Services
Sector |
Petrochemical |
Project Title |
Electric Heat Tracing Services |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
E&I |
Location |
Jubail |
Start Date |
01/09/16 |
End Date |
01/12/16 |
Scope of work |
Maintenance of Electric heat tracing System,To provide Inventory spare parts for each system. To provid Engineering Design Package for any modifications supported with required statndars & Drawings.To perform Through maintenance checkup for each System
|
|
Sabtank Jubail |
Jubail |
01/09/16 |
01/12/16 |
Petrochemical |
Construction of Ammonia and Urea Operator Cabin
Sector |
Petrochemical |
Project Title |
Construction of Ammonia and Urea Operator Cabin |
Project Owner |
SABIC |
Client |
Safco |
Department |
Civil |
Location |
Jubail |
Start Date |
01/10/16 |
End Date |
01/01/17 |
Scope of work |
The scope includes Design, Procurement, Construction of Ammonia & Urea Operator Cabin. Specialized Manpower like Fabricator, Steel Fixer, Rigger & Carpenter were involved in the job.
|
|
Safco |
Jubail |
01/10/16 |
01/01/17 |
Petrochemical |
Filter Foundation work YANPET U10 CSU PROJECT
Sector |
Petrochemical |
Project Title |
Filter Foundation work YANPET U10 CSU PROJECT |
Project Owner |
SABIC / YANPET |
Client |
eTEC Arabia |
Department |
CSD |
Location |
Yanbu |
Start Date |
01/09/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes Earth work( Site preparation Excavation (including Concrete Paving Demolition), Back Fill & Compaction,Disposal). Concrete Work(Structural Concrete,Lean Concrete,Form Work For Foundation, Re-Bar,Non-Shrinkage Grout (for Steel structure work),Joint & Sealant) & Coating Wok
|
|
eTEC Arabia |
Yanbu |
01/09/16 |
01/12/16 |
Oil & Gas |
MISC & MOC EXECUTION WORKS at YASREF Facility
Sector |
Oil & Gas |
Project Title |
MISC & MOC EXECUTION WORKS at YASREF Facility |
Project Owner |
YASREF |
Client |
YASREF |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/10/16 |
End Date |
01/04/17 |
Scope of work |
The project scope includes
Pipes and Valve Fittings, Blinding, De-blinding, Measuring, cutting, grinding,welding, threading,pipefitting and installing pipes up to 56″ inches diameter, Install and remove valves up to 56″ inches diameter, Cold cutting of piping, as required.,Pre and Post Weld Heat Treatment,Painting, Cleaning and Grit Blasting, Insulation Work,Scaffolding – Design, supply, erection, and dismantling of scaffolding. Fireproofing, Rotary Equipment Work, Electrical & Instrumentation Work.
|
|
YASREF |
Yanbu |
01/10/16 |
01/04/17 |
Oil & Gas |
BOLT TENSIONING & ON-SITE MACHINING (02 years contract)
Sector |
Oil & Gas |
Project Title |
BOLT TENSIONING & ON-SITE MACHINING (02 years contract) |
Project Owner |
Saudi Aramco |
Client |
Khursaniyah Gas Plant |
Department |
BT |
Location |
Khursaniyah |
Start Date |
01/08/16 |
End Date |
01/01/18 |
Scope of work |
Bolt Torquing & Tensioning Services for Khursniyah Gas Plant for a period of two years contract
|
|
Khursaniyah Gas Plant |
Khursaniyah |
01/08/16 |
01/01/18 |
Petrochemical |
Civil Work for EO Sales Gas Filter Project
Sector |
Petrochemical |
Project Title |
Civil Work for EO Sales Gas Filter Project |
Project Owner |
Sadara |
Client |
SADARA |
Department |
Civil |
Location |
Jubail |
Start Date |
01/08/16 |
End Date |
01/09/16 |
Scope of work |
THIS PROJECT JOB SCOPE COVERS
Pipe lines fabrication and installation work of Sales Gas Filter at SADARA EO Plant. Removal of existing temporary structure, Concrete Work and Installation of Pedestals
|
|
SADARA |
Jubail |
01/08/16 |
01/09/16 |
Petrochemical |
Installation of C20 Filter to capture Polymer LAO (Linear alpha olifines)
Sector |
Petrochemical |
Project Title |
Installation of C20 Filter to capture Polymer LAO (Linear alpha olifines) |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/16 |
End Date |
01/12/16 |
Scope of work |
During LAO plant T/A, Following activities were performed,
Design, Engineering, Supply, Installation,Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product. along with associated site works including Piping, Fabrication, Welding, Civil/ structural Work for routing of pipes and cables covered under this project , Removal and reinstallation of Electrical heat tracing. Installation of instruments, Supply and laying signal cable, Loop check for all the instruments
|
|
UNITED |
Jubail |
01/08/16 |
01/12/16 |