Petrochemical |
RIK 34E35A Heat Exchangers EDC plant
Sector |
Petrochemical |
Project Title |
RIK 34E35A Heat Exchangers EDC plant |
Project Owner |
SABIC |
Client |
SADAF |
Department |
PSD |
Location |
Jubail |
Start Date |
July 2018 |
End Date |
November 2018 |
Scope of work |
The project scope includes Procurement of material, Fabrication, Testing and Supply and installation of Heat Exchanger. Fabrication of Heat Exchanger, NDT and Hydro-Testing of Heat Exchanger.
|
|
SADAF |
Jubail |
July 2018 |
November 2018 |
Oil & Gas |
Apply on-line high pressure sealant for valves at Shedgum, Uthmaniyah and Hawiyah facilities
Sector |
Oil & Gas |
Project Title |
Apply on-line high pressure sealant for valves at Shedgum, Uthmaniyah and Hawiyah facilities |
Project Owner |
Saudi Aramco |
Client |
SAUDI ARAMCO |
Department |
TSD |
Location |
Shedgum, Uthmaniyah and Hawiyah facilities |
Start Date |
July 2018 |
End Date |
December 2018 |
Scope of work |
The scope of work includes technical and professional services and transportation to apply online high pressure sealant for valves at Shedgum, Uthmaniyah and Hawiyah facilities
|
|
SAUDI ARAMCO |
Shedgum, Uthmaniyah and Hawiyah facilities |
July 2018 |
December 2018 |
Petrochemical |
LSTK for SF4 Cooling Tower Revamp and Providing CP System
Sector |
Petrochemical |
Project Title |
LSTK for SF4 Cooling Tower Revamp and Providing CP System |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
PSD |
Location |
Jubail |
Start Date |
June 2018 |
End Date |
July 2021 |
Scope of work |
– The project scope for Cooling Tower Revamp includes detail design, engineering, procurement, supply, construction, installation, testing, pre-commissioning, and commission assistance for the civil works for the revamping of cooling tower along with cathodic protection (CP) works for the cooling tower.
– All civil / mechanical works, concrete repair and CP system installation works (except for concrete repair along with the CP system for 800mm internal portion of the Fans rings), the work will be carried out during the Cooling Tower operating conditions.
– A new CP system shall be installed along with new power cables from feeders to CP power supply units.
– Existing vibration switches, accelerometer probes etc shall be removed and reinstalled after the work is completed.
|
|
SAFCO |
Jubail |
June 2018 |
July 2021 |
Petrochemical |
E&I Works in Farabi Petrochemicals at Yanbu Project
Sector |
Petrochemical |
Project Title |
E&I Works in Farabi Petrochemicals at Yanbu Project |
Project Owner |
Farabi Petrochemicals |
Client |
Larsen & Toubro |
Department |
E&I |
Location |
Yanbu |
Start Date |
May 2018 |
End Date |
December 2019 |
Scope of work |
Installation & Testing of all Electrical equipment’s, Transformers, MCC Panels, Cable Laying, and Power & Communication cables Termination etc. Cable continuity & meggering. Instrument Installation and Calibration.
|
|
Larsen & Toubro |
Yanbu |
May 2018 |
December 2019 |
Oil & Gas |
RETROFIT THE DEHYDRATOR VESSEL AT SHGOSP-5 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM
Sector |
Oil & Gas |
Project Title |
RETROFIT THE DEHYDRATOR VESSEL AT SHGOSP-5 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM |
Project Owner |
Saudi Aramco |
Client |
Shedgum GOSP-5 |
Department |
PSD |
Location |
Shedgum |
Start Date |
April 2018 |
End Date |
May 2018 |
Scope of work |
Its includes demolition of Internal Headers, Distributors, Grids, Transformers and Bushings (for both D-211 and D-212). Installation of Vessel Components (Oil Headers, Effluent Water Collector-D-211, Interface draw-off collectors, hangers and support framers, Electrodes, Dual Frequency (DF) Power Units, High Voltage Bushings and Electrode Assemblies, DFD LRC II Control Panel (Control room and interface with DCS & ESD), new nozzles, 480V Power Supply units, level Transmitters).
|
|
Shedgum GOSP-5 |
Shedgum |
April 2018 |
May 2018 |
Oil & Gas |
Scaffolding Services (Section 5 – Service/Sub-Contract Scope of Work) at Safaniyah offshore wellhead platforms
Sector |
Oil & Gas |
Project Title |
Scaffolding Services (Section 5 – Service/Sub-Contract Scope of Work) at Safaniyah offshore wellhead platforms |
Project Owner |
SAUDI ARAMCO / SAFANIYAH |
Client |
Dynamic Industries |
Department |
SCF |
Location |
Safaniyah |
Start Date |
April 2018 |
End Date |
September |
Scope of work |
The scope includes supply of scaffolding Services at Safaniyah offshore
|
|
Dynamic Industries |
Safaniyah |
April 2018 |
September |
Petrochemical |
EPC/LSTK for Quench Improvement Project OL-III (SP-152000016) (QIP)
Sector |
Petrochemical |
Project Title |
EPC/LSTK for Quench Improvement Project OL-III (SP-152000016) (QIP) |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
PSD |
Location |
Jubail |
Start Date |
April 2018 |
End Date |
February 2020 |
Scope of work |
The project scope includes Engineering, Procurement, construction, Installation, Testing, Commissioning, Approval, Project Management and Site Demonstration for the Phase-II of Quench Improvement project in Olefins-III in Petrokemya. Modification of Process Water Blow Down (Benzene Contaminated Water). Modification of Quench water separator, DOX water treatment system, Quench water filters, Process water filters, Gasoline wash. Construction of a reinforced foundation and wall surrounding for Benzene Water Tank and Stripper package. Construction of a structure steel pipe-bridge and access stairs. Installation of Electrical Heat Tracing, Conduit, Lighting and Grounding. Supply and installation of instrument Equipments. DCS & ESD configuration. Loop test.
|
|
PetroKemya |
Jubail |
April 2018 |
February 2020 |
Oil & Gas |
SP-1632000054 PH-III VJ Piping Upgrade & LIN Injection System
Sector |
Oil & Gas |
Project Title |
SP-1632000054 PH-III VJ Piping Upgrade & LIN Injection System |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
April 2018 |
End Date |
June 2018 |
Scope of work |
The Project includes LSTK services for Engineering, procurement, construction, testing and commissioning of the following piping in Ph III plant:
• LIN VJ piping – Replacement of flanged type to welded type VJ piping
• LOX piping -Replacement of flanged type to welded type VJ piping
• LIN injection VJ piping
• NDT, Sandblasting and painting
|
|
Gas Jubail |
Jubail |
April 2018 |
June 2018 |