Oil & Gas |
STRUCTURED CABLING SYSTEM FOR SPF
Sector |
Oil & Gas |
Project Title |
STRUCTURED CABLING SYSTEM FOR SPF |
Project Owner |
SAUDI ARAMCO / TURAIF Aramco |
Client |
SNC Lavalin (Kentz) |
Department |
BAS |
Location |
Turaif |
Start Date |
August 2018 |
End Date |
April 2019 |
Scope of work |
The scope of work includes Procurement, installation, Testing and commissioning, Equipment configuration.
|
|
SNC Lavalin (Kentz) |
Turaif |
August 2018 |
April 2019 |
Oil & Gas |
Warehousing Management for DISA KSA
Sector |
Oil & Gas |
Project Title |
Warehousing Management for DISA KSA |
Project Owner |
Dynamic Industries |
Client |
Dynamic Industries |
Department |
SP |
Location |
Jubail |
Start Date |
September 2018 |
End Date |
July 2019 |
Scope of work |
SENDEN will manage the goods / cargo while inbound and outbound delivery to Dynamic Industries International and their subsidiary Dynamic Industries Saudi Arabia Ltd.
|
|
Dynamic Industries |
Jubail |
September 2018 |
July 2019 |
Petrochemical |
SF2-18 Fab. & Supply of HPBoil1-E301 Tube Bundle, Stage Suction Sep 1-S452 for 1-K405, Oily Cooler 1-K401E1 A&B
Sector |
Petrochemical |
Project Title |
SF2-18 Fab. & Supply of HPBoil1-E301 Tube Bundle, Stage Suction Sep 1-S452 for 1-K405, Oily Cooler 1-K401E1 A&B |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
TSD |
Location |
Jubail |
Start Date |
August 2018 |
End Date |
May 2019 |
Scope of work |
The project scope is Procurement of materials, fabrication, testing and supply of 03 Nos. of Oil Cooler (1-K-401 E1A/E1B), Supply of Tube Bundle for HPC Reboiler (1-E-301), Supply of Second Stage Suction Separator (1-S-452) like-tolike as per provided drawings and data sheet by SAFCO.
|
|
SAFCO |
Jubail |
August 2018 |
May 2019 |
Oil & Gas |
Services required for Re-Facin Flanges
Sector |
Oil & Gas |
Project Title |
Services required for Re-Facin Flanges |
Project Owner |
SAUDI ARAMCO / JAZAN |
Client |
Hanwa Saudi Conracting |
Department |
BT |
Location |
Jazan |
Start Date |
September 2018 |
End Date |
December 2018 |
Scope of work |
Scope of work includes Flange facing services at JRTP pkg 14.
|
|
Hanwa Saudi Conracting |
Jazan |
September 2018 |
December 2018 |
Oil & Gas |
Flange Re-Facing With Serration – On Site Work Service
Sector |
Oil & Gas |
Project Title |
Flange Re-Facing With Serration – On Site Work Service |
Project Owner |
SAUDI ARAMCO / UGP |
Client |
Hyundai |
Department |
BT |
Location |
Uthmaniyah |
Start Date |
August 2018 |
End Date |
September 2018 |
Scope of work |
The scope of work includes Re-Facing Flang Serration 12″ & 24 ” at EDRF, HDEC Sites
|
|
Hyundai |
Uthmaniyah |
August 2018 |
September 2018 |
Petrochemical |
Upgrade of Existing Allen Bradley PLC for Boiler in SF-3
Sector |
Petrochemical |
Project Title |
Upgrade of Existing Allen Bradley PLC for Boiler in SF-3 |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
BAS |
Location |
Jubail |
Start Date |
July 2018 |
End Date |
April 2019 |
Scope of work |
The Scope of work includes supply of 2nos. new PLC Systems for Allen Bradley PLC-5 Systems. Engineering Services for De-Coding the existing PLC-5 logic and translating and re-coding the same into the new PLC system. Supply of Engineering Laptop pre-loaded with IEC-Toolset Configuration software for Engineering & Programming changes and also installed SOE software license for SOE Configuration. MODBUS Serial communication interface between new PLC System and existing DCS System. Dismantle and removal of existing combined system and marshalling cabinets. Installation of new cabinets by utilizing existing base-frames. Removal of existing instrument cables from the existing panels. Re-wiring of existing instrument cables to new marshalling panels. Cable glanding and termination.
|
|
SAFCO |
Jubail |
July 2018 |
April 2019 |
Mining & Minerals |
PAP Subgrade Electromechanical Work
Sector |
Mining & Minerals |
Project Title |
PAP Subgrade Electromechanical Work |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
July 2018 |
End Date |
August 2018 |
Scope of work |
The scope of work includes supply, installation, testing, pre-commissioning and commissioning of the sump pump and sump agitator. Installation of all Piping Tie-ins interfacing with existing systems. Installation of Valves and in line instrument as per Piping Isometric. Fabrication and erection of steel structure and construction of civil foundation with brick lining.
|
|
Ma'aden Phosphate |
Ras Al-Khair |
July 2018 |
August 2018 |
Oil & Gas |
Diesel Engines General Mechanical PM Checks
Sector |
Oil & Gas |
Project Title |
Diesel Engines General Mechanical PM Checks |
Project Owner |
Saudi Aramco |
Client |
Hawiyah Gas Plant |
Department |
ETD |
Location |
Hawaiyah |
Start Date |
July 2018 |
End Date |
January 2019 |
Scope of work |
The scope of work includes replace oil Engines, cooling system water, oil & Diesel Filters, Intake Air Filters, Drive Belts and run test.
|
|
Hawiyah Gas Plant |
Hawaiyah |
July 2018 |
January 2019 |