Petrochemical |
Major Piping Fabrication & Replacement EDC T/A-2019
Sector |
Petrochemical |
Project Title |
Major Piping Fabrication & Replacement EDC T/A-2019 |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
June 2019 |
End Date |
July 2019 |
Scope of work |
The SOW includes Replacement of Piping during EDC T/A scheduled on June-2019. Piping replacement is on 32C8-Cl2 relief header, 32C508 relief header, 32C502 to 32K501 and 32K501 to 32V597 through 32E506/505, Emergency neutralization header, WET KAPA from 32V33/32V121 to 36IN2. Moreover, it includes cold cutting, removal of old pipe, connected valves and reinstallation after the new pipe laying.
|
|
SADAF |
Jubail |
June 2019 |
July 2019 |
Mining & Minerals |
Procurement & Construction of 40% product acid transfer line size enhancement from 4″ to 6″ in PAP Train B & A
Sector |
Mining & Minerals |
Project Title |
Procurement & Construction of 40% product acid transfer line size enhancement from 4″ to 6″ in PAP Train B & A |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
----- |
Location |
Ma'aden |
Start Date |
June 2019 |
End Date |
April 2020 |
Scope of work |
The project scope includes to piping & valves replacement and demolishing of existing pipe line & valves, fabrication of new pipe line as per IFC, Installation of new pipe line, installation of valves, NDT & painting, Installation of Flow Transmitter & Cabling work at MA’ADEN Plant, NDT, Painting, sand basting, scaffolding and hydro testing, commissioning, disconnecting / removal existing cable, supply & laying of new cables, termination of cables.
|
|
Ma'aden Phosphate |
Ma'aden |
June 2019 |
April 2020 |
Petrochemical |
EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122
Sector |
Petrochemical |
Project Title |
EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122 |
Project Owner |
SABIC |
Client |
Ibn Al-Baytar |
Department |
----- |
Location |
Jubail |
Start Date |
June 2019 |
End Date |
July 2020 |
Scope of work |
The scope of work includes Engineering, Procurement & construction. The details scope of work includes supply, installation, Testing and Commissioning of Transformer differential Relay for T/F differential Protection, Feeder Protection O/C Relay for Feeder Protection, Motor Feeder Protection Relays for Feeder Protection, Earth leakage Relays, LV MCCBs, new Switchgear and associated Bus duct in substation.
|
|
Ibn Al-Baytar |
Jubail |
June 2019 |
July 2020 |
Petrochemical |
Torqueing and Tensioning Subcontract for Sadara Project
Sector |
Petrochemical |
Project Title |
Torqueing and Tensioning Subcontract for Sadara Project |
Project Owner |
SADARA |
Client |
KBR Al Yusr Ltd |
Department |
----- |
Location |
Jubail |
Start Date |
May 2019 |
End Date |
May 2022 |
Scope of work |
The scope of work of includes supply of certified technician and suitable equipment to carryout bolt torqueing & Tensioning jobs at SADARA plant.
|
|
KBR Al Yusr Ltd |
Jubail |
May 2019 |
May 2022 |
Petrochemical |
Piping Recommendation 3” BFW Line // Ar-Razi Emergency Requirement
Sector |
Petrochemical |
Project Title |
Piping Recommendation 3” BFW Line // Ar-Razi Emergency Requirement |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
----- |
Location |
Jubail |
Start Date |
May 2019 |
End Date |
September 2019 |
Scope of work |
The project scope is to carry out the replacement work for the 3” BFW line in AR-RAZI. The replacement works involve 24-meter pipe, 11 elbows and 2 pipe supports.
|
|
Ar-Razi |
Jubail |
May 2019 |
September 2019 |
Petrochemical |
Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years)
Sector |
Petrochemical |
Project Title |
Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years) |
Project Owner |
SADARA |
Client |
SADARA |
Department |
----- |
Location |
SGPD |
Start Date |
May 2019 |
End Date |
May 2023 |
Scope of work |
The scope of work is to provide necessary personnel, scaffolding materials, supervision and transportation for the provision of scaffolding services in all SADARA plants. The details work includes rigging, erection and dismantling of tower built scaffolding, independent tied scaffolding, suspended scaffolding, mobile tower scaffolding, Vessel/Column/tank exterior scaffolding and vessel/column/tank interior scaffolding and the provision of scaffolding maintenance services including site cleanup.
|
|
SADARA |
SGPD |
May 2019 |
May 2023 |
Oil & Gas |
To Provide Scaffolding Services for SGPD’s Facilities
Sector |
Oil & Gas |
Project Title |
To Provide Scaffolding Services for SGPD’s Facilities |
Project Owner |
Saudi Aramco |
Client |
SGPD |
Department |
----- |
Location |
SGPD |
Start Date |
May 2019 |
End Date |
May 2021 |
Scope of work |
The scope of work is to provide scaffolding services at SGPD’s plants and other locations such as off-plot pipelines, valves & welheads.
|
|
SGPD |
SGPD |
May 2019 |
May 2021 |
Petrochemical |
EPC LSTK for Replacement of DEG/TEG/MEG and Service Water Pipelines at Tank Farm and Loading Bay in Sabtank Jubail
|
Sabtank Jubail |
Jubail |
April 2019 |
April 2020 |