Petrochemical |
RIK for Tube Bundle – Ethane Recycle Emergency Heater 11E114 at Ethylene Plant
Sector |
Petrochemical |
Project Title |
RIK for Tube Bundle – Ethane Recycle Emergency Heater 11E114 at Ethylene Plant |
Project Owner |
SABIC |
Client |
Sadaf |
Department |
----- |
Location |
Jubail |
Start Date |
01/07/19 |
End Date |
01/10/19 |
Scope of work |
The project scope is Procurement of materials, fabrication, testing and supply for
Tube Bundle – Ethane Recycle Emergency heater (11-E-114) with all materials,
consumables, tools like-to-like as per provided drawings and datasheet by
SADAF
|
|
Sadaf |
Jubail |
01/07/19 |
01/10/19 |
Mining & Minerals |
General Construction Services Contract (LFC)
Sector |
Mining & Minerals |
Project Title |
General Construction Services Contract (LFC) |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
01/07/19 |
End Date |
01/07/22 |
Scope of work |
The project scope is to execute the General services contract for MAADEN Aluminium
for 3 years. The major works included in this contract are as under, procurement, Fabrication, installation, precommissioning, commissioning etc. for various discipline, Civil & Structure Works, Piping Works & Equipment Works, Electrical works & Instrumentation & control Systems, DCS, Painting & Insulation, Scaffolding Works
|
|
Ma'aden Aluminium |
Ras Al-Khair |
01/07/19 |
01/07/22 |
Mining & Minerals |
Blending of MPC & MWSPC Phosphoric Acid
Sector |
Mining & Minerals |
Project Title |
Blending of MPC & MWSPC Phosphoric Acid |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
01/07/19 |
End Date |
01/11/20 |
Scope of work |
The Scope of Work covered under this project is to carry out the, Procurement,
Installation/Construction, Tie-Ins, Testing, Pre-commissioning & Commissioning, Civil Structure works, Mechanical & Piping Works, E&I Works for Blending of MPC & MWSPC Phosphoric acid at Ma’aden Phosphate
Company Plant.
|
|
Ma'aden Phosphate |
Ras Al-Khair |
01/07/19 |
01/11/20 |
Mining & Minerals |
SENDAN Successfully Move & Install Double Girder EOT Crane (46 ton) In Maaden Phosphate Company
Sector |
Mining & Minerals |
Project Title |
SENDAN Successfully Move & Install Double Girder EOT Crane (46 ton) In Maaden Phosphate Company |
Project Owner |
|
Client |
|
Department |
----- |
Location |
|
Start Date |
|
End Date |
|
Scope of work |
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor, and installation of isolation switch for new crane, power, grounding cables, cable tray supports, termination Jb, wireless pannel with radio remote control. Civil works includes road cutting and paving road with concrete excluding culvert cutting. Excavation for cable laying except trench routing.
|
|
|
|
|
|
Oil & Gas |
Gas Compression Facilities Expansion, Safaniyah
Sector |
Oil & Gas |
Project Title |
Gas Compression Facilities Expansion, Safaniyah |
Project Owner |
Saudi Aramco |
Client |
Safaniyah |
Department |
----- |
Location |
Safaniyah |
Start Date |
June 2019 |
End Date |
December 2020 |
Scope of work |
– Engineering, procurement and Construction activities for Jump-over line, filtration system, associated plant & utility piping, power supply system, and process control system.
– Civil and Structural works include demolition of existing concrete pavement, excavation, grading, radar mapping, site development, steel fabrication of pipe racks, pipe supports, and platforms.
– Installation of Filtration Package/Skid with associated piping and supports.
– Electrical and instrumentation works such as power supply to new skid, cables, conduits, trays, field instruments (flow, level, pressure, vibration, temperature meters) and DCS modification works.
– Installation of fire protection system to protect the black powder filters inside the plant.
|
|
Safaniyah |
Safaniyah |
June 2019 |
December 2020 |
Petrochemical |
Piping, DCRs and Valves Package for Olefins TAM’2020
Sector |
Petrochemical |
Project Title |
Piping, DCRs and Valves Package for Olefins TAM’2020 |
Project Owner |
SABIC |
Client |
Sharq |
Department |
----- |
Location |
Jubail |
Start Date |
October 2019 |
End Date |
February 2020 |
Scope of work |
The SOW includes removal of existing pipe lines, fabrication of pipe line as per IFC, Installation of pipe line, SAFE RAD of joints, sand blasting & painting, NDT of workshop joints, removal & cutting of the valves, installation of valves, scaffolding erection/removal along with materials, insulation removal and re-installation, cold cutting, machining, hydro-testing of new lines, and PWHT HP Steam Valves – 03 Nos
|
|
Sharq |
Jubail |
October 2019 |
February 2020 |
Oil & Gas |
MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker
Sector |
Oil & Gas |
Project Title |
MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker |
Project Owner |
Saudi Aramco |
Client |
Ras Tanura |
Department |
----- |
Location |
Ras Tanura |
Start Date |
June 2019 |
End Date |
June 2020 |
Scope of work |
The Project Scope is to carry out Complete Electrical works for upgrading the electrical power system at West Pier. The details scope of work includes, Evaluate and calculate the load requirements including existing equipment and all new equipment of 2.4KV Field Switches with 13.8 Kv and Procure of 2 Existing Obsolete 2.4kv Breaker. Supply and installation of 12 No’s of SF 6 switches (13.8 Kv Volts), 2 No’s of 2.4 Kv rolling breakers for spares & Conduit and fittings installation. Excavate and lay power cable from the 5.0 k Volts power panel to all portable offices, all existing and new equipment.
|
|
Ras Tanura |
Ras Tanura |
June 2019 |
June 2020 |
Petrochemical |
Repair Monel Chutes & Centrifuge during EDC TA’19
Sector |
Petrochemical |
Project Title |
Repair Monel Chutes & Centrifuge during EDC TA’19 |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
June 2019 |
End Date |
July 2019 |
Scope of work |
The scope of work includes, Sand blasting for chutes to remove any Belzona and other contaminations and Bottom casing flange to remove any Belzona and other contaminations. Perform Neutralization (to remove Caustic) for all weld joints & surface cracks for chutes & centrifuge bottom casing flange. Perform weld seam repairs and cracks repairs as per findings. Plates/flanges replacements may also be required as per findings or crack during repair work. Drilling for chute flanges with bottom casing flange. Weld build up and machining for centrifuge bottom casing flanges, as per findings (ensure flatness for flanges, to avoid any leakage). Perform DPT after final weld repairs and machining. Drilling and tapping for centrifuge bottom flange holes.
|
|
SADAF |
Jubail |
June 2019 |
July 2019 |