Petrochemical |
Slop Drums Discharge Piping Eetension Project (B52)
Sector |
Petrochemical |
Project Title |
Slop Drums Discharge Piping Eetension Project (B52) |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/13 |
End Date |
01/12/13 |
Scope of work |
Removal & Installation of Existing piping with new involes Mechanical Construction, Fabrication, Procurement & Scaffolding Activities
|
|
Sabtank Jubail |
Jubail |
01/10/13 |
01/12/13 |
Oil & Gas |
Cutting & Welding Of 6″ & 3″ Potable Water Line
Sector |
Oil & Gas |
Project Title |
Cutting & Welding Of 6″ & 3″ Potable Water Line |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/13 |
End Date |
01/10/13 |
Scope of work |
Removal, Installation & welding of 6″ & 3″ portable water lines
|
|
Gas Jubail |
Jubail |
01/10/13 |
01/10/13 |
Oil & Gas |
Removal/installation of Seawater pumps
Sector |
Oil & Gas |
Project Title |
Removal/installation of Seawater pumps |
Project Owner |
SABIC / Gas Jubail |
Client |
LINDE |
Department |
----- |
Location |
Jubail |
Start Date |
01/09/13 |
End Date |
01/02/14 |
Scope of work |
To remove the existing Sea Water Pumps & Install new Sea Water Pumps and their associate piping.
|
|
LINDE |
Jubail |
01/09/13 |
01/02/14 |
Petrochemical |
Replacement of Glycol De-hydrator condenser 3E-1407A/B
Sector |
Petrochemical |
Project Title |
Replacement of Glycol De-hydrator condenser 3E-1407A/B |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/09/13 |
End Date |
01/01/14 |
Scope of work |
Replacement of Glycol De-hydrator condenser 3E-1407A/B
|
|
SHARQ |
Jubail |
01/09/13 |
01/01/14 |
Petrochemical |
Installing additional valve in Ammonia start up line & Upgrading the existing valve with multi trim valve in IBB Urea Plant
Sector |
Petrochemical |
Project Title |
Installing additional valve in Ammonia start up line & Upgrading the existing valve with multi trim valve in IBB Urea Plant |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
----- |
Location |
Jubail |
Start Date |
01/08/13 |
End Date |
01/04/14 |
Scope of work |
Modification in the existing system along with the Installation of the Valve on Ammonia Start up Line.
|
|
IBN AL-BAYTAR |
Jubail |
01/08/13 |
01/04/14 |
Petrochemical |
Supply, fabrication & delivery of Structural Steel (Circular Platforms)
Sector |
Petrochemical |
Project Title |
Supply, fabrication & delivery of Structural Steel (Circular Platforms) |
Project Owner |
SADARA |
Client |
LINDE |
Department |
----- |
Location |
Jubail |
Start Date |
01/08/13 |
End Date |
01/11/13 |
Scope of work |
Procurement, Construction, Fabrication of Steel Structure Circular Plate forms
|
|
LINDE |
Jubail |
01/08/13 |
01/11/13 |
Petrochemical |
Tie In Jobs
Sector |
Petrochemical |
Project Title |
Tie In Jobs |
Project Owner |
TASNEE |
Client |
DAR |
Department |
----- |
Location |
Jubail |
Start Date |
01/07/13 |
End Date |
01/07/13 |
Scope of work |
Piping Tie in at different points on different line sizes. (Mechanical Work)
|
|
DAR |
Jubail |
01/07/13 |
01/07/13 |
Oil & Gas |
Luberef – Revamping Works for Heater B1001 (Erection)
Sector |
Oil & Gas |
Project Title |
Luberef – Revamping Works for Heater B1001 (Erection) |
Project Owner |
LUBREF |
Client |
KT ARABIA |
Department |
----- |
Location |
Yanbu |
Start Date |
01/06/13 |
End Date |
01/12/13 |
Scope of work |
Revamping work for Heater i.e Installation of pre-fabricated Steel Structure, Ducts, Installtion Of Pumps and associate Piping, civil foundation works & Intrumentaion work.
|
|
KT ARABIA |
Yanbu |
01/06/13 |