Petrochemical |
Catofin Reactor Header repair MTBE I
Sector |
Petrochemical |
Project Title |
Catofin Reactor Header repair MTBE I |
Project Owner |
SABIC |
Client |
IBN-ZAHR |
Department |
----- |
Location |
Jubail |
Start Date |
01/01/15 |
End Date |
01/03/15 |
Scope of work |
Project involves inspection and repir of Catofin Reactor in MTBE-I, includes replacement of different size of Fabric Bellows during the MTBE-1 Turn around.
|
|
IBN-ZAHR |
Jubail |
01/01/15 |
01/03/15 |
Petrochemical |
SF-4 Faulty Cable replacement & Alternate arrangements
Sector |
Petrochemical |
Project Title |
SF-4 Faulty Cable replacement & Alternate arrangements |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
----- |
Location |
Jubail |
Start Date |
01/01/15 |
End Date |
01/06/15 |
Scope of work |
Project involves temporary supply for motor from field supply outlets, in case of failure of motor existing cable. Including Fabrication, Assembling of components, Supply of 480V Power Supply distribution Board/ Starter Panel.
|
|
SAFCO |
Jubail |
01/01/15 |
01/06/15 |
Metal |
Construct 4 No.s of Driver’s waiting shed
Sector |
Metal |
Project Title |
Construct 4 No.s of Driver’s waiting shed |
Project Owner |
SABIC |
Client |
HADEED |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/14 |
End Date |
01/05/15 |
Scope of work |
Construction of Four No.s of Driver Shed. LSTK project includes Excavation, Formwork, Rebar works, Concreting, Paving & inter lock floor tiles False Ceiling, Painting & Safety ballrod Post.
|
|
HADEED |
Jubail |
01/11/14 |
01/05/15 |
Petrochemical |
Crane Change in Extruder Building
Sector |
Petrochemical |
Project Title |
Crane Change in Extruder Building |
Project Owner |
Advanced Petrochmemical Company |
Client |
Advanced Petrochmemical Company |
Department |
----- |
Location |
Jubail |
Start Date |
01/08/14 |
End Date |
01/03/15 |
Scope of work |
The project includes Design analysis of structure, Modification of
Structure, supply and install 2 way traverse crane of capacity 10
ton. Removal and Replacement of chain hoist with 2 way traverse crane system of capacity 10 tons, Implement the structural Modification, Electrical Connection and Modification.
|
|
Advanced Petrochmemical Company |
Jubail |
01/08/14 |
01/03/15 |
Metal |
Install Down Coiler-1 Curve Apron
Sector |
Metal |
Project Title |
Install Down Coiler-1 Curve Apron |
Project Owner |
SABIC |
Client |
HADEED |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/14 |
End Date |
01/01/15 |
Scope of work |
Project involves removal of the existing swivel arm assembly and fixing of the new swivel arm assembly and wear plate of triangular frame assembly, involving mechanical and electrical jobs.
|
|
HADEED |
Jubail |
01/11/14 |
01/01/15 |
Petrochemical |
Temporary Constyruction faclilities & Early Site work, SAMAC MMA-PMMA Project
Sector |
Petrochemical |
Project Title |
Temporary Constyruction faclilities & Early Site work, SAMAC MMA-PMMA Project |
Project Owner |
SABIC / SAMAC |
Client |
CTCI |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/14 |
End Date |
01/07/15 |
Scope of work |
Project involves design of all Temporary Offices, Guard House etc. including Structural Works, Scaffolding, Clamping & Transportation.
|
|
CTCI |
Jubail |
01/11/14 |
01/07/15 |
Metal |
Replace all the cables for RRT1
Sector |
Metal |
Project Title |
Replace all the cables for RRT1 |
Project Owner |
SABIC |
Client |
HADEED |
Department |
----- |
Location |
Jubail |
Start Date |
01/07/14 |
End Date |
01/05/16 |
Scope of work |
The project “Relace all the cable for RRT1” involves cable replacement for motors # 1-60, plug and socket for motors @ 1-253, cable termination and loop checking.
|
|
HADEED |
Jubail |
01/07/14 |
01/05/16 |
Petrochemical |
Implemantation of BBP recommendations for SHP Boilers
Sector |
Petrochemical |
Project Title |
Implemantation of BBP recommendations for SHP Boilers |
Project Owner |
SABIC |
Client |
KEMYA |
Department |
----- |
Location |
Jubail |
Start Date |
01/07/14 |
End Date |
01/02/15 |
Scope of work |
Project involves Mechanical, Electrical & Instrumenattion Work. Procurement, Supply of materials, Installation, Testing and Commissioning of the implementation of BBP recommendations for SHP Boilers, modification of MOV’s & CV’s, Piping fabrication & modification works.
|
|
KEMYA |
Jubail |
01/07/14 |
01/02/15 |