Mining & Minerals |
Scaffolding Erection and Dismantling during PAP T/A 2015
Sector |
Mining & Minerals |
Project Title |
Scaffolding Erection and Dismantling during PAP T/A 2015 |
Project Owner |
MA'ADEN |
Client |
MA'ADEN PHOSPHATE |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
01/12/14 |
End Date |
01/02/15 |
Scope of work |
Project involves Scaffolding works during Turn Around 2015 PAP plant.
|
|
MA'ADEN PHOSPHATE |
Ras Al-Khair |
01/12/14 |
01/02/15 |
Oil & Gas |
E & I Work For Aramco COGEN Project
Sector |
Oil & Gas |
Project Title |
E & I Work For Aramco COGEN Project |
Project Owner |
Saudi Aramco |
Client |
SAMSUNG |
Department |
----- |
Location |
Abqaiq |
Start Date |
01/01/15 |
End Date |
01/08/16 |
Scope of work |
Project involves Electrical, Instrumentation, Installation of Cable Tray, Cable Pulling, Lighting, Instrument Installation, Testing, Loop Checking, Transformer Installation, Transformer Testing, Transformer Commissioning, Switch Gear Panel Installation, Field Panel, Termination, Glanding & Grounding.
|
|
SAMSUNG |
Abqaiq |
01/01/15 |
01/08/16 |
Petrochemical |
Additional NRV’s 14 No.s (ADAMS make) at downstream of furnace of OLEFIN-II plant
Sector |
Petrochemical |
Project Title |
Additional NRV’s 14 No.s (ADAMS make) at downstream of furnace of OLEFIN-II plant |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/10/15 |
Scope of work |
Project involves Engineering, Procurement, Construction, Installation, Inspection, Testing, Pre-Commissioning and Commissioning of additional NRVS 14 Nos (ADAMS make) at downstream of furnaces of OLEFIN-II plant.
|
|
PetroKemya |
Jubail |
01/03/15 |
01/10/15 |
Petrochemical |
Facility Type Pressure Control Valve PR-Secondary Containment 44TK7-UDD
Sector |
Petrochemical |
Project Title |
Facility Type Pressure Control Valve PR-Secondary Containment 44TK7-UDD |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
01/04/15 |
End Date |
01/09/15 |
Scope of work |
Project involves Engineering, Procurement, Construction & Installation of New Secondary Containment for tanks 44TK7, 44TK8 & TTK9 at UDD.
|
|
SADAF |
Jubail |
01/04/15 |
01/09/15 |
Petrochemical |
Train 3 Reactor UT Bolt measurement
Sector |
Petrochemical |
Project Title |
Train 3 Reactor UT Bolt measurement |
Project Owner |
SADARA |
Client |
SADARA |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/09/15 |
Scope of work |
Project involves provision of Specialized Services to cover Ultrasonic Bolt Elongation measurement on the applications as listed below table at Sadara Project Site.
|
|
SADARA |
Jubail |
01/03/15 |
01/09/15 |
Petrochemical |
Bolt Torquing Services at SADARA Isocynates Plant Project
Sector |
Petrochemical |
Project Title |
Bolt Torquing Services at SADARA Isocynates Plant Project |
Project Owner |
SADARA |
Client |
DAELIM |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/14 |
End Date |
01/07/15 |
Scope of work |
Project includes Bolt Torquing services of joints related to Agitator Unit assembly and the stud bolts are coated and one end driven into the body of the Vessel and the other end have standard Heavy Hex nut.
|
|
DAELIM |
Jubail |
01/10/14 |
01/07/15 |
Petrochemical |
Olefins Bolt Torquing Services Compressor and Turbines
Sector |
Petrochemical |
Project Title |
Olefins Bolt Torquing Services Compressor and Turbines |
Project Owner |
SABIC |
Client |
YANSAB |
Department |
----- |
Location |
Yanbu |
Start Date |
07/01/15 |
End Date |
01/05/15 |
Scope of work |
Project involves, Bolt Torquing and Flange facing of Compressor and Turbines.
|
|
YANSAB |
Yanbu |
07/01/15 |
01/05/15 |
Petrochemical |
Installation of Heat Exchanger
Sector |
Petrochemical |
Project Title |
Installation of Heat Exchanger |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/08/15 |
End Date |
01/10/15 |
Scope of work |
Project involves Design, Procurement, Supply of Materials, Installation, Testing and Commissioning of the Replacement of 03 CO2 Absorber Feed Pre heaters (1E-1201 A/B/C) at 1EG Plant
|
|
SHARQ |
Jubail |
01/08/15 |
01/10/15 |