Petrochemical |
Upgrade Transformers 6 & 7 with Power Cables
Sector |
Petrochemical |
Project Title |
Upgrade Transformers 6 & 7 with Power Cables |
Project Owner |
SABIC |
Client |
AL-BAYRONI |
Department |
----- |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/12/15 |
Scope of work |
Project involves Design and Detailed Engineering of upgradation of transformers, Removal & Installation of Transformer shed, Dismantling & Installation of New Transformer, Modification of New Civil Foundation and Roof structural works including dismantling of existing 1.5MVA Transformer, LV bus duct, Relay setting for upstream and downstream, Testing & Commissioning.
|
|
AL-BAYRONI |
Jubail |
01/05/15 |
01/12/15 |
Petrochemical |
MP & LP steam line form utility to UGAA plant
Sector |
Petrochemical |
Project Title |
MP & LP steam line form utility to UGAA plant |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
----- |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/05/16 |
Scope of work |
The project involves installation of MP and LP steam lines from SF2 for UGAA plant, including Design & Detailed Engineering, Procurement of material, Installation of 3″ MP steamline & Installation of 4″ LP steamline, Scaffolding works, INsulation works, painting, sand blasting, Testing & Commissioning
|
|
SAFCO |
Jubail |
01/06/15 |
01/05/16 |
Petrochemical |
Cooling Water Pump (X-201J-A/B) & U-200J/A) Piping 3D TRACER ONLINE ANALYZERS
Sector |
Petrochemical |
Project Title |
Cooling Water Pump (X-201J-A/B) & U-200J/A) Piping 3D TRACER ONLINE ANALYZERS |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
----- |
Location |
Jubail |
Start Date |
01/04/15 |
End Date |
01/08/15 |
Scope of work |
Project involves Design, Engineering & Installation of 3D Tracer along with steel structure shed, civil foundation, related PVC piping and E&I work.
|
|
IBN AL-BAYTAR |
Jubail |
01/04/15 |
01/08/15 |
Petrochemical |
Preventing air entry to Flare Header
Sector |
Petrochemical |
Project Title |
Preventing air entry to Flare Header |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/11/15 |
Scope of work |
Project involves Design, Procurement of Material, Installation of Valves, Testing & Commissioning including Supply and Installation of Valves, Digital JB’s (EExd), DI DCS Modules along with Scaffolding activities.
|
|
SHARQ |
Jubail |
01/05/15 |
01/11/15 |
Petrochemical |
EPC PR for Shut off Valve
Sector |
Petrochemical |
Project Title |
EPC PR for Shut off Valve |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/09/15 |
Scope of work |
Project involves Design and Detailed Engineering, Supply of Materials, Installation, Testing and Commissioning to provide Trip Valve with Trip Logic on LP Steam Line going to DIB Re-Boilers along with Cutting, Demolition Piping, Scafolding works, Conduit Installation, Cable Laying,Glanding and Termination.
|
|
IBN-SINA |
Jubail |
01/03/15 |
01/09/15 |
Petrochemical |
Replace Oxygen Mixing Station with N2 Line
Sector |
Petrochemical |
Project Title |
Replace Oxygen Mixing Station with N2 Line |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/05/17 |
Scope of work |
Project involves Supply, Fabrication, Installation, Demolition and Commissioning works for Installation of Oxygen Mixing Station (OMS) with related Nitrogen lines & Valvesin order to maintain the integrity of the OMS system along with associated Nitrogen system.
|
|
SAUDI KAYAN |
Jubail |
01/03/15 |
01/05/17 |
Petrochemical |
Upgrade of PO4 and Eliminox Pumps
Sector |
Petrochemical |
Project Title |
Upgrade of PO4 and Eliminox Pumps |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/03/16 |
Scope of work |
Project involves Detail Design & Engineering, Procurement, Fabrication and Supply of material, Modification of Civl Foundation, piping installation with its fittings and valves, Electrical cables and power supply, DCS for pump connection. Including scope to replace existing chemical injection metering (dosing) of four (4no.) Eliminox and eight (8No.) Phosphates pumps with new modified type of dosing pumps including supply of one (1No.) Eliminox and three (3No.) Phosphate pumps as spare.
|
|
SADAF |
Jubail |
01/03/15 |
01/03/16 |
Mining & Minerals |
General Construction Services
Sector |
Mining & Minerals |
Project Title |
General Construction Services |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
01/05/15 |
End Date |
01/05/17 |
Scope of work |
This is a long form contarct which involves Civil & structural works, Pipe works & Valves, Equipment Erection, Mechanical & Electrical Installations, Instrumentation, Painting and Insulation works.
|
|
Ma'aden Aluminium |
Ras Al-Khair |
01/05/15 |
01/05/17 |