Metal |
69649253 Mechanical Installation DEDUSTING / HADEED
Sector |
Metal |
Project Title |
69649253 Mechanical Installation DEDUSTING / HADEED |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
----- |
Location |
Jubail |
Start Date |
01/07/15 |
End Date |
01/01/16 |
Scope of work |
The poject involves Mechanical Installation Desdusting including Piping, Equipment Erection and Structural Erection works.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/07/15 |
01/01/16 |
Metal |
69649253 Mechanical Installation MaterialHandling Services
Sector |
Metal |
Project Title |
69649253 Mechanical Installation MaterialHandling Services |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
----- |
Location |
Jubail |
Start Date |
01/07/15 |
End Date |
01/01/16 |
Scope of work |
The project involves Material Handling Services including Equipment Erection and Structural Erec ction works.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/07/15 |
01/01/16 |
Metal |
Hadeed – SPLP1, Upgradation of CCM3, Dedusting System / Material Handling System
Sector |
Metal |
Project Title |
Hadeed – SPLP1, Upgradation of CCM3, Dedusting System / Material Handling System |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
----- |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/01/16 |
Scope of work |
Project involves upgradation Continious Casting Machine, Dedusting Plant & Material Handling System. Disconnection and Reconnection of 3.5MVA oil Transformer, Installation and Connection of Cast Resin Transformer (1.6MVA & 1.25MVA), Upgradation of vibrating Feeder of Silos, Conveyor Belt Electrics & Automation. Removal & Installation of Panels (New Dedusting Electric Building, Material Handling Load Center Room, Kuttner Room, EAF1PLC Room). Dismantling entire existing CCM3 equipment, structure and piping. Disposal of all dismantled Structures, Equipment at Hadeed laydown area. Installation of new Structures and Equipment. Installation of Utility Equipment.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/06/15 |
01/01/16 |
Oil & Gas |
Controlled Bolting & onsite machining services for DGA shutdown
Sector |
Oil & Gas |
Project Title |
Controlled Bolting & onsite machining services for DGA shutdown |
Project Owner |
Saudi Aramco |
Client |
Aramco Khurais |
Department |
----- |
Location |
Khurais |
Start Date |
01/06/15 |
End Date |
01/04/16 |
Scope of work |
Controlled Bolting & onsite machining services for DGA shutdown
|
|
Aramco Khurais |
Khurais |
01/06/15 |
01/04/16 |
Petrochemical |
1EG Piping and Valves Repair Works (Area12&14)
Sector |
Petrochemical |
Project Title |
1EG Piping and Valves Repair Works (Area12&14) |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/12/15 |
Scope of work |
Project involves repair of piping and valves in 1EG plant during 2015 TAM. The scope involves pre-fabrication activities, Tagging of jobs, Radiography & toucup painting,
|
|
SHARQ |
Jubail |
01/06/15 |
01/12/15 |
Petrochemical |
Thermal Exp. Vessel construction
Sector |
Petrochemical |
Project Title |
Thermal Exp. Vessel construction |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
----- |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/08/16 |
Scope of work |
Project scope includes Engineering, procurement, supply, installation, testing and pre commissioning of new EO Thermal expansion vessel at SAUDI KAYAN Plant. The brief scope includes Design and detail engineering works for new EO Thermal expansion vessel installation, Supply of 01 EO Thermal expansion vessel, related piping and instruments, Civil foundation works for New EO Thermal expansion vessel, Supply, fabrication, erection and modification of piping, Painting and insulation works, Cable laying for instruments, Provision of instruments stanchions, transmitter sun shade and tube fittings, Configure new AO Card in the system, DCS Configuration & Scaffolding
|
|
SAUDI KAYAN |
Jubail |
01/06/15 |
01/08/16 |
Petrochemical |
Flame Scanner in Olefins Plant
Sector |
Petrochemical |
Project Title |
Flame Scanner in Olefins Plant |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/01/16 |
Scope of work |
Project involves Design and Detailed Engineering, of Upgradation of Replacing UV-IR type Flame Scanner. Procure Flame Scanner, Instrument Cables, involving Dismantling & Installation of Flame Scanner, Cabling with JB’s, DCS and BMS configuration, Testing & Commissioning.
|
|
SHARQ |
Jubail |
01/05/15 |
01/01/16 |
Metal |
Dismantling, Mechanical Installation, Installation Utility Equipment and Piping CCM & WTP HADEED SPLP1 – Upgradation of CCM3
Sector |
Metal |
Project Title |
Dismantling, Mechanical Installation, Installation Utility Equipment and Piping CCM & WTP HADEED SPLP1 – Upgradation of CCM3 |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
----- |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/01/16 |
Scope of work |
Project involves:-
• Provision of Temporary facilities.
• Dismantling & Installation of Steel Structure.
• Removal & Erection of Mechanical Equipment.
• Removal / Installation of Piping & Utility Equipment along with modification in existing system.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/06/15 |
01/01/16 |