Petrochemical |
Yanpet 1 F&G System Upgrade Project
Sector |
Petrochemical |
Project Title |
Yanpet 1 F&G System Upgrade Project |
Project Owner |
SABIC / YANPET |
Client |
SEPAM |
Department |
----- |
Location |
Yanbu |
Start Date |
01/03/16 |
End Date |
01/08/16 |
Scope of work |
The scope of work includes Supply, Erection & Dismantle of the Scaffold Material as required by project schedule at YANPET F&G system Upgrade Project.
|
|
SEPAM |
Yanbu |
01/03/16 |
01/08/16 |
Petrochemical |
Install a stand by pump and level indication for storm water Lagoon
Sector |
Petrochemical |
Project Title |
Install a stand by pump and level indication for storm water Lagoon |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/12/16 |
Scope of work |
The project scope includes installation of standby pump and level indication in storm water lagoon. The brief scope of work is as below:
Design and detail engineering for installation of standby pump and level indicator, Procurement of pump, level transmitter, control panel, pipe, pipe fittings, and cables, Construction of civil foundation, rerouting of UPVC pipe and curb wall around pump area,Installation of new pump foundation.,Modification of SS piping.
Installation of new piping, valves and strainer.,Installation of new radar level transmitter.,Installation of new control panel.,Installation of cables.,Scaffolding erection.,Testing, commissioning and DCS configuration
|
|
SAFCO |
Jubail |
01/03/16 |
01/12/16 |
Petrochemical |
Porta Cabin Office Complex
Sector |
Petrochemical |
Project Title |
Porta Cabin Office Complex |
Project Owner |
SADARA |
Client |
SADARA |
Department |
----- |
Location |
Jubail |
Start Date |
01/05/16 |
End Date |
01/07/16 |
Scope of work |
The scope ofwork includes, construction of portable cabin, Single unit joint with two Porta Cabins,
|
|
SADARA |
Jubail |
01/05/16 |
01/07/16 |
Petrochemical |
Replacement of over head lines of dehydration Coulmns,
Sector |
Petrochemical |
Project Title |
Replacement of over head lines of dehydration Coulmns, |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/06/17 |
Scope of work |
The project scope is the replacement of the overhead lines of Dehydration columns 4C-1401/2/3/4/5 with SS Metallurgy. It involves the following activities:, Procurement of piping bulk material., Pre fabrication of piping and pipe supports., Painting, pickling and passivation for piping., Testing of pipe spools., Demolition of existing lines from dehydration columns 4C-1401/2/3/4/5., Installation and testing of new lines for dehydration columns 4C-1401/2/3/4/5., Tie-in connections.,The radiography will be conducted through SAFRAD and RSO will be present at the job site.,Scaffolding Erection.,nsulation installation.,Instruments works.,Ground preparation of crane.
|
|
SHARQ |
Jubail |
01/03/16 |
01/06/17 |
Petrochemical |
DOW Reverse OSMOSIS Water KSA Project – IT COMMUNICATION TOWER DISMANTLING
Sector |
Petrochemical |
Project Title |
DOW Reverse OSMOSIS Water KSA Project – IT COMMUNICATION TOWER DISMANTLING |
Project Owner |
SADARA |
Client |
Fluor |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/04/16 |
Scope of work |
The project includes Disassembly and removal of IT Communications Tower, Dismantling of the Switch Cabinet, Dismantling of the wireless access point.
|
|
Fluor |
Jubail |
01/03/16 |
01/04/16 |
Petrochemical |
Scaffolding at SHARQ
Sector |
Petrochemical |
Project Title |
Scaffolding at SHARQ |
Project Owner |
SABIC / SHARQ |
Client |
NUQBAH INTERGRATED CONTRACTING |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/04/16 |
Scope of work |
The scope includes supply of scaffolding Services at SHARQ/SABIC in Jubail
|
|
NUQBAH INTERGRATED CONTRACTING |
Jubail |
01/03/16 |
01/04/16 |
Petrochemical |
Fabrication and Welding Services (Annual rate contract) 9000000666 & 9000000405
Sector |
Petrochemical |
Project Title |
Fabrication and Welding Services (Annual rate contract) 9000000666 & 9000000405 |
Project Owner |
Tasnee |
Client |
Tasnee |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
June 2018 |
Scope of work |
To provide services for fabrication, Welding, Sanblasting and Painting to be executed on call basis by utilizing Contractor qualified resources when required by TASNEE
|
|
Tasnee |
Jubail |
01/03/16 |
June 2018 |
Petrochemical |
Electrical Heat Tracing at line P-133142-3 – HC87
Sector |
Petrochemical |
Project Title |
Electrical Heat Tracing at line P-133142-3 – HC87 |
Project Owner |
SADARA |
Client |
SADARA |
Department |
----- |
Location |
Jubail |
Start Date |
25/04/16 |
End Date |
01/06/16 |
Scope of work |
The Scope of work includes Electrical Heat Tracing at line P-133142-3 – HC87( labour, material, tool & transportation to complete the work)
|
|
SADARA |
Jubail |
25/04/16 |
01/06/16 |