Petrochemical |
To Install Pressure Transmitter with Rubber Melt Tube
Sector |
Petrochemical |
Project Title |
To Install Pressure Transmitter with Rubber Melt Tube |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/08/16 |
End Date |
01/09/16 |
Scope of work |
Scope of work includes installation of pressure transmitter with a rubber melt tube that will cover specific pipes of the Hydrogen area of PE1&2 plants, along with internal wiring to DCS components and to annunciator alarm in the operation console.
|
|
SHARQ |
Jubail |
01/08/16 |
01/09/16 |
Petrochemical |
Overhauling of Misc. Rotary Equipment -SPCO T/A 2016
Sector |
Petrochemical |
Project Title |
Overhauling of Misc. Rotary Equipment -SPCO T/A 2016 |
Project Owner |
Saudi Chevron |
Client |
Saudi Chevron |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/16 |
End Date |
01/11/16 |
Scope of work |
Scope of work includes Miscellaneous Rotary works such as repair & maintenance work on Rotary equipments like Agitator assemblies, Reactor coolant Pumps & Dryers for SPCO South Plants during forthcoming Turnaround 2016.
|
|
Saudi Chevron |
Jubail |
01/10/16 |
01/11/16 |
Petrochemical |
Supply and Install Fiber Cable at L2501
Sector |
Petrochemical |
Project Title |
Supply and Install Fiber Cable at L2501 |
Project Owner |
SADARA |
Client |
SADARA |
Department |
----- |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/09/17 |
Scope of work |
Scope of work includes supply and installation of fiber optic cable Multimode Duplex, fiber cord, flexible conduit for cables dressing, breaking the fire sealing between cables cellar and EPMS panel/switchgear at cable/conduit entry point. Commissioning and testing of the installed equipment/instrument/cable.
|
|
SADARA |
Jubail |
01/06/16 |
01/09/17 |
Petrochemical |
Steel Structure Replacement
Sector |
Petrochemical |
Project Title |
Steel Structure Replacement |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
01/04/16 |
End Date |
01/07/17 |
Scope of work |
The scope of work includes Engineering, procurement, and construction necessary to complete structural steel repairs and replacement of heavily corroded structural steel elements.
|
|
SADAF |
Jubail |
01/04/16 |
01/07/17 |
Transportation & Infrastructure |
Subcontractor work for supply, delivey of different materials (School PA System, Master clock etc)
Sector |
Transportation & Infrastructure |
Project Title |
Subcontractor work for supply, delivey of different materials (School PA System, Master clock etc) |
Project Owner |
SATCO |
Client |
SATCO |
Department |
----- |
Location |
Jubail |
Start Date |
01/04/16 |
End Date |
01/08/16 |
Scope of work |
The scope of work includes supply and installation of Public Address system, Masterclock system, AV System, Data System, Telephone and Wireless system, IPTV System, BMS system, FIRE Alarm System.
|
|
SATCO |
Jubail |
01/04/16 |
01/08/16 |
Petrochemical |
Overhauling of Kobleco Compressors – Site Work – SPCO TA 2016
Sector |
Petrochemical |
Project Title |
Overhauling of Kobleco Compressors – Site Work – SPCO TA 2016 |
Project Owner |
Saudi Chevron |
Client |
Saudi Chevron |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/16 |
End Date |
01/11/16 |
Scope of work |
The scope of work includes Activities to remove the Compressor Rotors from Skid, Maintenance, Overhauling of compressors and installation of compressors on skid, presuure testing and comissioning.
|
|
Saudi Chevron |
Jubail |
01/10/16 |
01/11/16 |
Mining & Minerals |
Scaffolding Services LFC – MAC
Sector |
Mining & Minerals |
Project Title |
Scaffolding Services LFC – MAC |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
November 2015 |
End Date |
April 2019 |
Scope of work |
Provision of Scaffolding Services to MAC under Long Form Contract
|
|
Ma'aden Aluminium |
Ras Al-Khair |
November 2015 |
April 2019 |
Petrochemical |
Provide Scaffolding at PetroKemya
Sector |
Petrochemical |
Project Title |
Provide Scaffolding at PetroKemya |
Project Owner |
SABIC / PETROKEMYA |
Client |
IICS |
Department |
----- |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/04/16 |
Scope of work |
The scope of work includes supply of scaffolding at PetroKemya Plant.
|
|
IICS |
Jubail |
01/03/16 |
01/04/16 |