Petrochemical |
Subcontract for Mechanical, Electrical & Instrument Works for SEP(Saudi Elastomers Project ) sSBR Project.
Sector |
Petrochemical |
Project Title |
Subcontract for Mechanical, Electrical & Instrument Works for SEP(Saudi Elastomers Project ) sSBR Project. |
Project Owner |
SABIC / KEMYA |
Client |
DAELIM |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
October 2018 |
Scope of work |
Scope of Work Includes Procurement, Steel Structure Works, Piping, Scaffolding,Pre Commissioning, Equipment Installation like pumps, Static Mixer, Reactor, Static Condenser, Pipe Supports, Structural Steel Revamping Work, Hot-Dip Galvanized Structural Steel, Electrical & Instrumentation Works, , Valve installations.Painting, Insulation(Hot & Cold) & Construction of Temporary facilities.
|
|
DAELIM |
Jubail |
01/11/16 |
October 2018 |
Mining & Minerals |
Smelter Pot Relining Facility Project – Mechanical, Electrical, Instrumentation and Piping (MEIP) Works
Sector |
Mining & Minerals |
Project Title |
Smelter Pot Relining Facility Project – Mechanical, Electrical, Instrumentation and Piping (MEIP) Works |
Project Owner |
MA'ADEN |
Client |
HATCH |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
01/10/16 |
End Date |
01/07/17 |
Scope of work |
Supply & Installation of Compressed Air Piping, Potable & Process water piping, Assembly & Installation of shot blast hood,Installation of Pneumetic Recovery System, Bucket Elevator,Rotary Screen, Shots hopper. Installation of Dust Collector, Rotary valve & bag loading station. Stack Installation 30m High. Design, Fabrication & supply of ductwork & supports,Fabrication & Supply of slide bridge.Supply and installation of Power cable, Eartth Cable. Supply & Installation of complete UPS System, Supply and Installation of the Hot Dipped Galvanized Racking.
|
|
HATCH |
Ras Al-Khair |
01/10/16 |
01/07/17 |
Oil & Gas |
Inquiry for 112-K-0003, Restoration Work, YASREF EPC-4
Sector |
Oil & Gas |
Project Title |
Inquiry for 112-K-0003, Restoration Work, YASREF EPC-4 |
Project Owner |
YASREF |
Client |
Daelim |
Department |
----- |
Location |
Yanbu |
Start Date |
01/09/16 |
End Date |
01/03/17 |
Scope of work |
Scope of work includes Make Up H2 Compressor(112-K-0003) Train B Erection & Dismantling Work,. Dismantling & Installation of Roof Clading & Structure for Compressor Motor & Compressor Frame, Piping(Fire Water, Vent Piping, Cooling Water). Electrical & Instrument Work including,Pre-Commissioning & Commissioning Assistance, Foundation Works(Grouting & Rectification of cracks on foundation).
|
|
Daelim |
Yanbu |
01/09/16 |
01/03/17 |
Petrochemical |
Electric Heat Tracing Services
Sector |
Petrochemical |
Project Title |
Electric Heat Tracing Services |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
01/09/16 |
End Date |
01/12/16 |
Scope of work |
Maintenance of Electric heat tracing System,To provide Inventory spare parts for each system. To provid Engineering Design Package for any modifications supported with required statndars & Drawings.To perform Through maintenance checkup for each System
|
|
Sabtank Jubail |
Jubail |
01/09/16 |
01/12/16 |
Petrochemical |
Construction of Ammonia and Urea Operator Cabin
Sector |
Petrochemical |
Project Title |
Construction of Ammonia and Urea Operator Cabin |
Project Owner |
SABIC |
Client |
Safco |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/16 |
End Date |
01/01/17 |
Scope of work |
The scope includes Design, Procurement, Construction of Ammonia & Urea Operator Cabin. Specialized Manpower like Fabricator, Steel Fixer, Rigger & Carpenter were involved in the job.
|
|
Safco |
Jubail |
01/10/16 |
01/01/17 |
Petrochemical |
Filter Foundation work YANPET U10 CSU PROJECT
Sector |
Petrochemical |
Project Title |
Filter Foundation work YANPET U10 CSU PROJECT |
Project Owner |
SABIC / YANPET |
Client |
eTEC Arabia |
Department |
----- |
Location |
Yanbu |
Start Date |
01/09/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes Earth work( Site preparation Excavation (including Concrete Paving Demolition), Back Fill & Compaction,Disposal). Concrete Work(Structural Concrete,Lean Concrete,Form Work For Foundation, Re-Bar,Non-Shrinkage Grout (for Steel structure work),Joint & Sealant) & Coating Wok
|
|
eTEC Arabia |
Yanbu |
01/09/16 |
01/12/16 |
Oil & Gas |
MISC & MOC EXECUTION WORKS at YASREF Facility
Sector |
Oil & Gas |
Project Title |
MISC & MOC EXECUTION WORKS at YASREF Facility |
Project Owner |
YASREF |
Client |
YASREF |
Department |
----- |
Location |
Yanbu |
Start Date |
01/10/16 |
End Date |
01/04/17 |
Scope of work |
The project scope includes
Pipes and Valve Fittings, Blinding, De-blinding, Measuring, cutting, grinding,welding, threading,pipefitting and installing pipes up to 56″ inches diameter, Install and remove valves up to 56″ inches diameter, Cold cutting of piping, as required.,Pre and Post Weld Heat Treatment,Painting, Cleaning and Grit Blasting, Insulation Work,Scaffolding – Design, supply, erection, and dismantling of scaffolding. Fireproofing, Rotary Equipment Work, Electrical & Instrumentation Work.
|
|
YASREF |
Yanbu |
01/10/16 |
01/04/17 |
Oil & Gas |
BOLT TENSIONING & ON-SITE MACHINING (02 years contract)
Sector |
Oil & Gas |
Project Title |
BOLT TENSIONING & ON-SITE MACHINING (02 years contract) |
Project Owner |
Saudi Aramco |
Client |
Khursaniyah Gas Plant |
Department |
----- |
Location |
Khursaniyah |
Start Date |
01/08/16 |
End Date |
01/01/18 |
Scope of work |
Bolt Torquing & Tensioning Services for Khursniyah Gas Plant for a period of two years contract
|
|
Khursaniyah Gas Plant |
Khursaniyah |
01/08/16 |
01/01/18 |