Power |
Inspection and Repairing of 4 MVA Transformer at Arar Power Plant Extensıon IV Project
Sector |
Power |
Project Title |
Inspection and Repairing of 4 MVA Transformer at Arar Power Plant Extensıon IV Project |
Project Owner |
SEC |
Client |
BEST Transformer |
Department |
----- |
Location |
ARAR |
Start Date |
01/12/16 |
End Date |
01/01/17 |
Scope of work |
Scope of Work includes
4 MVA, 4.16/0.48KV Transformer inspection, electrical testing, gasket
replacement, oil filtration and filling work & Oil Sampling and Oil Testing.
|
|
BEST Transformer |
ARAR |
01/12/16 |
01/01/17 |
Petrochemical |
Emergency Work for KV-592642 ; ASU KV Forward Plan
Sector |
Petrochemical |
Project Title |
Emergency Work for KV-592642 ; ASU KV Forward Plan |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
----- |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes
1. Unbolting of old valve, 2. Removal of old valve by Crane (160 Ton), 3.Cleaning of flange faces, 4.New valve KV-592642 mobilization from Temal workshop to site, 5.Valve KV-592642 installation by crane, 6.Gasket installation and manual bolt tightening, 7.Torquing
|
|
Ar-Razi |
Jubail |
01/12/16 |
01/12/16 |
Petrochemical |
Installation of Electrical Heat Tracing System
Sector |
Petrochemical |
Project Title |
Installation of Electrical Heat Tracing System |
Project Owner |
SADARA |
Client |
SADARA |
Department |
----- |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/02/17 |
Scope of work |
Scope of work includes
1.Extension/Modification of two no. of cables after installation of PRVs in existing pipeline
2. Removal & Reinstatement of heat tracing cable & termination from 8 nos of new
PRVs
|
|
SADARA |
Jubail |
01/12/16 |
01/02/17 |
Petrochemical |
2EG/2UTL Piping and Valves Job Package TAM 2017
Sector |
Petrochemical |
Project Title |
2EG/2UTL Piping and Valves Job Package TAM 2017 |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
01/06/17 |
Scope of work |
Scope of work includes
Piping, Pre-Fabraction, Scaffolding, Marking, cutting and Replacement of the Affected pipe portion according to isometric drawings, steam trap, affected vent, replacement of the sealant box for ethylene line drain, bevling of new piping by pass, Removing & replacement of Isolation valves, Welding & Installation of piping & valves, NDT, Hydrotesting & Commissioning.
|
|
SHARQ |
Jubail |
01/11/16 |
01/06/17 |
Oil & Gas |
Scaffolding Services at Abqaiq Plants
Sector |
Oil & Gas |
Project Title |
Scaffolding Services at Abqaiq Plants |
Project Owner |
Saudi Aramco |
Client |
Abqaiq Plant |
Department |
----- |
Location |
Abqaiq |
Start Date |
01/11/16 |
End Date |
01/05/18 |
Scope of work |
Scope of work includes
Scaffold Services at Abqaiq Plants including Tower Interior, Tower Exterior & Mobile tower Exterior. Certified Manpower like Scaffolding Supervisors, Scaffolding Inspectors & Work permit Receiver etc are involved in the job.
|
|
Abqaiq Plant |
Abqaiq |
01/11/16 |
01/05/18 |
Petrochemical |
SADAF Plant 74SS1 switchgear enclosure and telemetry system upgrade
Sector |
Petrochemical |
Project Title |
SADAF Plant 74SS1 switchgear enclosure and telemetry system upgrade |
Project Owner |
SABIC / SADAF |
Client |
ABB |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes
MV & LV Power and Control Cable Termination, Supply of all necessary termination accessories like sleeves, lugs, tags & ferrules, Laying and terminating the Grounding wire & grounding conductor , Dismantling Existing PEC and Moving the associated Equipment (MV SWGR, LV SWGR, Telemetry Panel, Dry Type transformer etc.) to storage yard, RTU Installation
|
|
ABB |
Jubail |
01/11/16 |
01/12/16 |
Petrochemical |
Construction Contract – CO2 – United
Sector |
Petrochemical |
Project Title |
Construction Contract – CO2 – United |
Project Owner |
SABIC / UNITED |
Client |
LINDE |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
01/02/17 |
Scope of work |
Scope of work includes
Structural Steel Fabrication & Installation, Revamping, Drilling, Welding of various weld types of Carbon Steel and Low Temperature Carbon Steel LTCS, Stainless Steel , Cutting, Shop fabrication of process and utility pipe spools, Post Weld Heat Treatment (PWHT),Installation of process and utility Piping, Pipe Rack ,Underground Piping, Labelling of equipment, valves & piping, Non Destructive Examination, Fire Proofing, Cold Insulation, Rigging, Scaffolding, Painting
|
|
LINDE |
Jubail |
01/11/16 |
01/02/17 |
Petrochemical |
General Contract for Construction of RO Water KSA Project Phase II
Sector |
Petrochemical |
Project Title |
General Contract for Construction of RO Water KSA Project Phase II |
Project Owner |
SADARA/DOW |
Client |
FLUOR |
Department |
----- |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/12/17 |
Scope of work |
Scope of Work includes Installation of Pressure Vessels, Columns and Reactors, piping & Installation of Rotary Equipment like pumps & fans, Installation of Conveyors, Palletizer, Shrink etc.,HVAC, Fire Protection System, Electrical & Instrumentation work including Above Ground Cable Installation, Cable Tray & Condiute Installation ,Cable Pulling, Transformer Installation,Civil(Concrete) work, Plumbing, Painting & Insulation work.
|
|
FLUOR |
Jubail |
01/12/16 |
01/12/17 |