Mining & Minerals |
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor Building at Ammonia Plant
Sector |
Mining & Minerals |
Project Title |
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor Building at Ammonia Plant |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
01/02/17 |
End Date |
01/07/17 |
Scope of work |
Scope of work includes
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor, and installation of isolation switch for new crane, power, grounding cables, cable tray supports, termination Jb, wireless pannel with radio remote control. Civil works includes road cutting and paving road with concrete excluding culvert cutting. Excavation for cable laying except trench routing.
|
|
Ma'aden Phosphate |
Ras Al-Khair |
01/02/17 |
01/07/17 |
Petrochemical |
Civil Foundation for DMS Heater
Sector |
Petrochemical |
Project Title |
Civil Foundation for DMS Heater |
Project Owner |
Sipchem |
Client |
Sipchem |
Department |
----- |
Location |
Jubail |
Start Date |
01/01/17 |
End Date |
01/04/17 |
Scope of work |
Scope of work includes
Cutting the existing slab,excavation,backfilling and compaction. Construction of 2 foundations(1x1x0.3)m and (1.15x1x0.3)m. Fixing insert plate and anchor bolts as per provided drawing.
|
|
Sipchem |
Jubail |
01/01/17 |
01/04/17 |
Petrochemical |
Replacement of CS Sulphuric Acid Lines of SF3-SF4 (AF-1540071)
Sector |
Petrochemical |
Project Title |
Replacement of CS Sulphuric Acid Lines of SF3-SF4 (AF-1540071) |
Project Owner |
Sabic |
Client |
Safco |
Department |
----- |
Location |
Jubail |
Start Date |
01/01/17 |
End Date |
01/06/17 |
Scope of work |
Scope of work includes
Procurement of piping items as per the provided isometrics, Fabrication of piping including shop NDT, Erection of piping including site NDT, Demolition of existing piping, Procurement and installation of pipe supports, Scaffolding erection and dismantling, Painting and sand blasting, Testing and commissioning
|
|
Safco |
Jubail |
01/01/17 |
01/06/17 |
Oil & Gas |
Scaffolding required for Flare Pipeline Installation
Sector |
Oil & Gas |
Project Title |
Scaffolding required for Flare Pipeline Installation |
Project Owner |
Saudi Aramco |
Client |
Tecnicas Reunidas |
Department |
----- |
Location |
Jazan |
Start Date |
01/01/17 |
End Date |
September 2019 |
Scope of work |
Scope of work includes Scaffolding Services Scaffolding Services including supplying, erecting, renting and dismantling.
|
|
Tecnicas Reunidas |
Jazan |
01/01/17 |
September 2019 |
Petrochemical |
Displaced Pipeline Repair and Rectify
Sector |
Petrochemical |
Project Title |
Displaced Pipeline Repair and Rectify |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
01/01/17 |
End Date |
01/07/17 |
Scope of work |
The project scope is the repair for the displaced pipelines in SABTANK and the supports rectification for the piping.
|
|
Sabtank Jubail |
Jubail |
01/01/17 |
01/07/17 |
Petrochemical |
Olefins-III TA17 Decoke Line Replacement
Sector |
Petrochemical |
Project Title |
Olefins-III TA17 Decoke Line Replacement |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
----- |
Location |
Jubail |
Start Date |
01/01/17 |
End Date |
01/06/17 |
Scope of work |
Scope of work includes
The project scope is pre-fabrication and replacement of Decoke header in Olefins-III.
|
|
PetroKemya |
Jubail |
01/01/17 |
01/06/17 |
Petrochemical |
Electrical works for MP-EVA0-B-01-04-61 -Ethylene Pump at EVA plant.
Sector |
Petrochemical |
Project Title |
Electrical works for MP-EVA0-B-01-04-61 -Ethylene Pump at EVA plant. |
Project Owner |
SIPCHEM |
Client |
SIPCHEM |
Department |
----- |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes
• Erection / dismantling of scaffolding along with existing pipe rack.
• 3 Runs, 440 meters of 3CX150mm2 power cable will be laid on existing cable tray/ladders from MCC panel to the consumer junction box.
• 1 Run, 440 meter of 5CX2.5mm2 control cable will be laid on existing cable trays/ladders from MCC panel to LCS.
• 1 Run, of 3CX150mm2 Power cable will be laid on existing cable trays./ladders from consumer junction box to the vendor junction box.
|
|
SIPCHEM |
Jubail |
01/12/16 |
01/12/16 |
Oil & Gas |
PERFORM PREVENTIVE MAINTENANCE FOR DIESEL GENERATORS
Sector |
Oil & Gas |
Project Title |
PERFORM PREVENTIVE MAINTENANCE FOR DIESEL GENERATORS |
Project Owner |
Saudi Aramco |
Client |
SWIMP Mubarraz |
Department |
----- |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/12/19 |
Scope of work |
Scope of Work includes:
Performing preventive maintenance in different locations in eatern region (AIWSP, QSWP and others.)
Perform preventive maintenance for Diesel Generator.
|
|
SWIMP Mubarraz |
Jubail |
01/12/16 |
01/12/19 |