Petrochemical |
Upgradation of Dissolvers / Settlers Piping System at Sadaf Salt Plant, SP-151100517
Sector |
Petrochemical |
Project Title |
Upgradation of Dissolvers / Settlers Piping System at Sadaf Salt Plant, SP-151100517 |
Project Owner |
SABIC |
Client |
Sadaf |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/06/18 |
Scope of work |
Scope of work includes engineering, procurement, supply, installation and commissioning of Rubber lined Carbon Steel piping system for Dissolver and Settler units at Sadaf Salt plant as the previous system of CS was facing frequesnt leakages.
|
|
Sadaf |
Jubail |
01/11/17 |
01/06/18 |
Metal |
Replacement of EOT Crane CR-71 at Rod & Mill-I Roll Shop of RMLP-1
Sector |
Metal |
Project Title |
Replacement of EOT Crane CR-71 at Rod & Mill-I Roll Shop of RMLP-1 |
Project Owner |
SABIC |
Client |
HADEED |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/02/19 |
Scope of work |
Scope of work includes Mechncial, civil, electrical and instrumentation works for Design, engineering, supply, installation and commissioning of 25 ton capacity electric overhead travelling (EOT) crane (CR-71) at Roll Shop of RMLP-1 for the better handling of steel bars at Roll shop. It also includes the removel of old 20 Ton crane which has gone obsolete.
|
|
HADEED |
Jubail |
01/11/17 |
01/02/19 |
Petrochemical |
Lifting Beam with Trolley in Manturbo Shed
Sector |
Petrochemical |
Project Title |
Lifting Beam with Trolley in Manturbo Shed |
Project Owner |
Advanced Petrochmemical Company |
Client |
Advanced Petrochmemical Company |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/02/18 |
Scope of work |
Scope of work includes field engineering like floor activites, field route changes to modify the platform, trolley for gear box so that it can be removed during the TAM for the removel and re-installation of compressor casing. It also includes NDT, welding and other related activities.
|
|
Advanced Petrochmemical Company |
Jubail |
01/11/17 |
01/02/18 |
Metal |
Installation of De-dusting System in Oxide Tunnel of Module A/B – SP-162100001
Sector |
Metal |
Project Title |
Installation of De-dusting System in Oxide Tunnel of Module A/B – SP-162100001 |
Project Owner |
SABIC |
Client |
HADEED |
Department |
----- |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/02/19 |
Scope of work |
Scope of work includes Mechncial, civil, electrical and instrumentation works for Design, engineering, supply, installation, testing and commissioning assistance of a new de-dusting system for the oxide tunnel feeders and the conveyor system of Direct Reduction Module AB Plant at Hadeed.
|
|
HADEED |
Jubail |
01/11/17 |
01/02/19 |
Petrochemical |
Plant Support Services for all Sabic Affiliates – Master Agreement (LFC)
Sector |
Petrochemical |
Project Title |
Plant Support Services for all Sabic Affiliates – Master Agreement (LFC) |
Project Owner |
SABIC |
Client |
SABIC Global |
Department |
----- |
Location |
KSA |
Start Date |
01/11/17 |
End Date |
01/11/22 |
Scope of work |
Scope of work includes provision of skilled manpower for all Sabic affiliates (Jubail/Yanbu) for the established long-form contract
|
|
SABIC Global |
KSA |
01/11/17 |
01/11/22 |
Oil & Gas |
Flange Facing (Machining) for EPC 10 & 11 at JRTP – T2220
Sector |
Oil & Gas |
Project Title |
Flange Facing (Machining) for EPC 10 & 11 at JRTP – T2220 |
Project Owner |
SAUDI ARAMCO / JAZAN |
Client |
Tecnicas Reunidas |
Department |
----- |
Location |
Jazan |
Start Date |
01/11/17 |
End Date |
01/03/18 |
Scope of work |
Scope of work includes hire of manpower and equipment to carry out in-situ flange facing / re-facing services to be performed at Jazan Refinery and Terminal Project at EPC 10 & 11
|
|
Tecnicas Reunidas |
Jazan |
01/11/17 |
01/03/18 |
Petrochemical |
Upgradation of PLC System in Existing Packaging Lines at Yanpet
Sector |
Petrochemical |
Project Title |
Upgradation of PLC System in Existing Packaging Lines at Yanpet |
Project Owner |
SABIC / Yanpet |
Client |
Golden Wing |
Department |
----- |
Location |
Yanbu |
Start Date |
01/11/17 |
End Date |
01/06/18 |
Scope of work |
Scope of work includes PLC (S5-S7) upgrade with visualization system installation of 6 lines of packaging machine field installation at Yanpet plant
|
|
Golden Wing |
Yanbu |
01/11/17 |
01/06/18 |
Petrochemical |
IBB Switchyard Insulator Cleaning
Sector |
Petrochemical |
Project Title |
IBB Switchyard Insulator Cleaning |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
----- |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/10/17 |
Scope of work |
Project scope consist of washing of 230 kV Substation outdoor RTV Coated Bushing/Insulators (totals=@70 Nos) with DM water. Cleaning of insulators with low pressure hydro jet pump and hand wiped with soft cloth choked with DM water without damaging the RTV coating.
|
|
IBN AL-BAYTAR |
Jubail |
01/10/17 |
01/10/17 |