Petrochemical |
Construction Work for Replace Heater 200-H-02 Project in Ibn Zahr
Sector |
Petrochemical |
Project Title |
Construction Work for Replace Heater 200-H-02 Project in Ibn Zahr |
Project Owner |
SABIC / IBN ZAHR |
Client |
Tecnicas Reunidas |
Department |
----- |
Location |
Jubail |
Start Date |
|
End Date |
|
Scope of work |
The Project Scope includes the replacement services for MTBE Heater during the MTBE T/A-2018. It also demolition, removal of associated piping, elecctrical panels and other associated equipment. Further, it includes erection of new heater aling with the associated equipment, mechanical piping, electrcial, instrumentation and other suporting works.
|
|
Tecnicas Reunidas |
Jubail |
|
|
Oil & Gas |
Early works for Demolition of Abandoned Pipe Corridor
Sector |
Oil & Gas |
Project Title |
Early works for Demolition of Abandoned Pipe Corridor |
Project Owner |
SAUDI ARAMCO / RTR |
Client |
Tecnicas Reunidas |
Department |
----- |
Location |
Ras Tanura |
Start Date |
01/01/18 |
End Date |
01/05/18 |
Scope of work |
Demolition of reinforced concrete sleepers; excavation in general soil, up to 3 meters deep including dewatering; supply and execution of backfilling in foundations, pits, extrados of walls, trenches and channels, carried out in layers with borrowed material; lading, transport and unloading of remainder material from excavation out of the limits of property in an external authorized dumping area.
|
|
Tecnicas Reunidas |
Ras Tanura |
01/01/18 |
01/05/18 |
Petrochemical |
Site Development, Piperack Foundation and Rack Steel Erection Works for KJO Global Gas & NGL Recovery & Handling Project
Sector |
Petrochemical |
Project Title |
Site Development, Piperack Foundation and Rack Steel Erection Works for KJO Global Gas & NGL Recovery & Handling Project |
Project Owner |
Al-Khafji Joint Operations |
Client |
JGC |
Department |
----- |
Location |
Al-Khafji |
Start Date |
17/09/17 |
End Date |
18/02/18 |
Scope of work |
The scope includes performance of following activities to successfully execute the contract such as;
• General civil/site development works include: demolition, clearing & grubbing, site grading, slope protection, landscaping etc.
• Concrete works: foundation, soil compaction, piling, gate and fencing foundations, and other miscellaneous foundation.
• Structural steel erection: pipe racks erection, erection of pipe racks including assembly and installation of platforms and accessways, etc. as well as the erection of bridge and/or pier structures.
|
|
JGC |
Al-Khafji |
17/09/17 |
18/02/18 |
Oil & Gas |
Upgrade HGP Area Alerting System
Sector |
Oil & Gas |
Project Title |
Upgrade HGP Area Alerting System |
Project Owner |
Saudi Aramco |
Client |
Hawiyah Gas Plant |
Department |
----- |
Location |
Hawaiyah |
Start Date |
07/12/17 |
End Date |
01/05/18 |
Scope of work |
The scope includes preparation of doundation design power layout and other engineering requirements to install new electronic multi-tone emergency sirens. Contractor shall size and route the cable from junction box mounted in the omni directional antenna to the control room and preparation of necessary structural foundations.
|
|
Hawiyah Gas Plant |
Hawaiyah |
07/12/17 |
01/05/18 |
Oil & Gas |
Torqueing for GT-2 T&I at Hawiyah Plant
Sector |
Oil & Gas |
Project Title |
Torqueing for GT-2 T&I at Hawiyah Plant |
Project Owner |
Saudi Aramco |
Client |
Hawiyah Gas Plant |
Department |
----- |
Location |
Hawaiyah |
Start Date |
01/02/18 |
End Date |
01/05/18 |
Scope of work |
Provision of Torqueing crews for Hydraulic services at Hawiyah Gas plant on a 12Hr shift. Hydraulic torqueing and opening shall be performed at H48 at GT#2 during T&I.
|
|
Hawiyah Gas Plant |
Hawaiyah |
01/02/18 |
01/05/18 |
Petrochemical |
Fiber Optics Troubleshooting Services (01 Year Contract)
Sector |
Petrochemical |
Project Title |
Fiber Optics Troubleshooting Services (01 Year Contract) |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
10/12/17 |
End Date |
01/02/18 |
Scope of work |
Maintenance, troubleshooting and site support services for Fiber Optic Cable Communication of Sabtank ESD System, DCS system, PLC systems, RTG system and Instrumentation. These services include:
1. Fiber Optic Cable Communication for GE FANUC ESD -PLC systems, Yokogawa DCS system, RTG system and Instrumentation installed for all SABIC and Non-SABIC affiliates
2. Fiber Optic Cable Communication between CCR, LCR, Berths for all SABIC and Non-SABIC affiliates.
3. Fiber Optic Cable Communication for interface and communication between GE FANUC ESD system, Yokogawa DCS. system, RTG system and Instrumentation for all SABIC and Non-SABIC affiliates.
|
|
Sabtank Jubail |
Jubail |
10/12/17 |
01/02/18 |
Oil & Gas |
Plate Vehicle Recognition System for Saudi Aramco Northern Arabia Area Unconventional Gas (UG) Surface Facilities System-B Project
Sector |
Oil & Gas |
Project Title |
Plate Vehicle Recognition System for Saudi Aramco Northern Arabia Area Unconventional Gas (UG) Surface Facilities System-B Project |
Project Owner |
SAUDI ARAMCO / TURAIF Aramco |
Client |
SNC Lavalin (Kentz) |
Department |
----- |
Location |
Turaif |
Start Date |
03/12/17 |
End Date |
01/05/18 |
Scope of work |
The scope inlcudes EPC of PRS Color CCD Camera, Lenses for PRS Color CCD Camera, Housing for PRS Color CCD Camera, PRS Infrared (IR) Iiluminators, PRS Poles and Mounts, Loop Detector, Visual Alarm Light, PRS Audiable Alarm / Speaker, PRS Switch, PRS Controller, KVM Receiver, Hydraulic crash barrier along with controller and Modification/Expansion of existing PRS system.
|
|
SNC Lavalin (Kentz) |
Turaif |
03/12/17 |
01/05/18 |
Petrochemical |
Repairing of 30″ PNG Line at Plant III (Emergency)
Sector |
Petrochemical |
Project Title |
Repairing of 30″ PNG Line at Plant III (Emergency) |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
----- |
Location |
Jubail |
Start Date |
13/12/17 |
End Date |
13/12/17 |
Scope of work |
The project scope was to carry out the emergency work repair of 30” PNG Line at Ar-Razi Plant III. The pipe material is SS 321 and thickness 21 mm. It includes grinding of 4 Nos. pipe joints up to root and re-welding, rectification for 1 no. pipe support along with complete radiography test (RT).
|
|
Ar-Razi |
Jubail |
13/12/17 |
13/12/17 |