Petrochemical |
EPC/LSTK for Quench Improvement Project OL-III (SP-152000016) (QIP)
Sector |
Petrochemical |
Project Title |
EPC/LSTK for Quench Improvement Project OL-III (SP-152000016) (QIP) |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
----- |
Location |
Jubail |
Start Date |
April 2018 |
End Date |
February 2020 |
Scope of work |
The project scope includes Engineering, Procurement, construction, Installation, Testing, Commissioning, Approval, Project Management and Site Demonstration for the Phase-II of Quench Improvement project in Olefins-III in Petrokemya. Modification of Process Water Blow Down (Benzene Contaminated Water). Modification of Quench water separator, DOX water treatment system, Quench water filters, Process water filters, Gasoline wash. Construction of a reinforced foundation and wall surrounding for Benzene Water Tank and Stripper package. Construction of a structure steel pipe-bridge and access stairs. Installation of Electrical Heat Tracing, Conduit, Lighting and Grounding. Supply and installation of instrument Equipments. DCS & ESD configuration. Loop test.
|
|
PetroKemya |
Jubail |
April 2018 |
February 2020 |
Oil & Gas |
SP-1632000054 PH-III VJ Piping Upgrade & LIN Injection System
Sector |
Oil & Gas |
Project Title |
SP-1632000054 PH-III VJ Piping Upgrade & LIN Injection System |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
April 2018 |
End Date |
June 2018 |
Scope of work |
The Project includes LSTK services for Engineering, procurement, construction, testing and commissioning of the following piping in Ph III plant:
• LIN VJ piping – Replacement of flanged type to welded type VJ piping
• LOX piping -Replacement of flanged type to welded type VJ piping
• LIN injection VJ piping
• NDT, Sandblasting and painting
|
|
Gas Jubail |
Jubail |
April 2018 |
June 2018 |
Petrochemical |
Common Temporary Facility for JUPC United EO/EG Ⅲ Project
Sector |
Petrochemical |
Project Title |
Common Temporary Facility for JUPC United EO/EG Ⅲ Project |
Project Owner |
SABIC / United |
Client |
SAMSUNG |
Department |
----- |
Location |
Jubail |
Start Date |
April 2018 |
End Date |
March 2018 |
Scope of work |
The project scope is a supply, Installation, Testing and commissioning of common Temporary Facility for JUPC United EO/EG III Project
|
|
SAMSUNG |
Jubail |
April 2018 |
March 2018 |
Petrochemical |
Electrical & Instrument Construction Work of YANSAB Debottlenecking project
Sector |
Petrochemical |
Project Title |
Electrical & Instrument Construction Work of YANSAB Debottlenecking project |
Project Owner |
SABIC / YANSAB |
Client |
eTEC Arabia |
Department |
----- |
Location |
Yanbu |
Start Date |
April 2018 |
End Date |
December 2018 |
Scope of work |
The scope of work includes Electrical & Instrumentation works as mention below.
Installation of Electrical Equipments as per provided MTO. Installation of MCC / MV SWGR / NGR / Capacitor Bank panel, Bust Duct, SCADA / CMADA Equipments, MV / LV & Control Cables, Cable Trays with fittings, Lighting Cables, Lighting Fixtures, Lighting Stanchion / Poles, Grounding & Lighting System, Paging System, Cathodic Protection, Rack Room Equipments, DCS & AMS Panels, Machines Monitoring Protection System, Instrumentation and Control Valves, GC and Conductivity Analyzers Sampling Probes & Accessories, Gas Detector, Conduits & Fittings, SS Tubing, Fabrication and Erection Works and Instrumentation Calibration works.
|
|
eTEC Arabia |
Yanbu |
April 2018 |
December 2018 |
Petrochemical |
Temporary Fence & Gate Work at Sabic United
Sector |
Petrochemical |
Project Title |
Temporary Fence & Gate Work at Sabic United |
Project Owner |
SABIC / United |
Client |
SAMSUNG |
Department |
----- |
Location |
Jubail |
Start Date |
March 2018 |
End Date |
June 2018 |
Scope of work |
The project scope is a Samsung Engineering for supply, installation of temporary fence and gate work.
|
|
SAMSUNG |
Jubail |
March 2018 |
June 2018 |
Petrochemical |
AF-1335012, PCQ1 CCR Interface 1 with PCQ2
Sector |
Petrochemical |
Project Title |
AF-1335012, PCQ1 CCR Interface 1 with PCQ2 |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
----- |
Location |
Jubail |
Start Date |
March 2018 |
End Date |
September 2019 |
Scope of work |
Scope of works includes to relocate and or interface the Petro Chemical Quay-1 (PCQ-1) control and safety systems (i.e DCS, ESD, ATG, CCTV, F&G, Emergency Siren, Wireless Communication system as Telephone Hot Lines and IP Telephony system) with Petro Chemical Quay-2 (PCQ-2).
|
|
Sabtank Jubail |
Jubail |
March 2018 |
September 2019 |
Petrochemical |
Field construction work to replace Waste Heat Boliers at Ar-Razi Plant-3&4
Sector |
Petrochemical |
Project Title |
Field construction work to replace Waste Heat Boliers at Ar-Razi Plant-3&4 |
Project Owner |
SABIC / Ar-Razi |
Client |
MHI |
Department |
----- |
Location |
Jubail |
Start Date |
February 2018 |
End Date |
August 2019 |
Scope of work |
Scope of work includes Mechanical, Piping, Electrical & Instrumentation and Civil works. Replacement of Waste Heat Boiler E-3205 AB and E-4205 AB at Plant-3 &4. Insulation work on the new waste heat boiler. Removal of existing piping supports and insulation. Reinstallation of removed piping, supports and insulation. Removal of structural members, platforms, ladders. Fabrication of temporary steel-structure required to support the existing structure during construction work. Surface preparation, site galvanization for the removed structural members. Removal of identified instruments, cables, cable & branch trays etc. Removal and reinstatement of identified electrical items like lighting poles, cables, cable & branch trays etc. Hydro-testing of reinstalled piping.
|
|
MHI |
Jubail |
February 2018 |
August 2019 |
Oil & Gas |
SHAYBAH NGL 230kV Cable “Testing and Repair”
Sector |
Oil & Gas |
Project Title |
SHAYBAH NGL 230kV Cable “Testing and Repair” |
Project Owner |
Saudi Aramco |
Client |
Shaybah NGL |
Department |
----- |
Location |
Shaybah NGL |
Start Date |
March 2018 |
End Date |
June 2018 |
Scope of work |
The scope of work includes.
1. Identification of fault in 1CX500 Phase C (Conductor & Sheath).
2. Supply of Cable Joint/Termination kits in case of option -2
3. Installation of joints and termination
4. Testing of the circuit
|
|
Shaybah NGL |
Shaybah NGL |
March 2018 |
June 2018 |