Mining & Minerals |
Scaffolding Services at Maaden GTC Area
Sector |
Mining & Minerals |
Project Title |
Scaffolding Services at Maaden GTC Area |
Project Owner |
Ma'aden Aluminum |
Client |
K. A. Khonaini Co |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
September 2018 |
End Date |
December 2018 |
Scope of work |
Scope of work includes scaffolding services including supplying, erecting, renting and dismantling at Ma’aden Aluminium plant
|
|
K. A. Khonaini Co |
Ras Al-Khair |
September 2018 |
December 2018 |
Petrochemical |
Control System Upgrade project at Yanpet Line 1 & 2
Sector |
Petrochemical |
Project Title |
Control System Upgrade project at Yanpet Line 1 & 2 |
Project Owner |
SABIC / YANPET |
Client |
Coperion |
Department |
----- |
Location |
Yanbu |
Start Date |
September 2018 |
End Date |
October 2018 |
Scope of work |
The scope of work includes supply of Manpower, Tool, Construction Material, Consumable, Execution & Documentation. Interfacing with existing systems (if any) is subjected to the examination of the site and any equipment required for integration. Electrical works including power distribution activities.
|
|
Coperion |
Yanbu |
September 2018 |
October 2018 |
Oil & Gas |
STRUCTURED CABLING SYSTEM FOR SPF
Sector |
Oil & Gas |
Project Title |
STRUCTURED CABLING SYSTEM FOR SPF |
Project Owner |
SAUDI ARAMCO / TURAIF Aramco |
Client |
SNC Lavalin (Kentz) |
Department |
----- |
Location |
Turaif |
Start Date |
August 2018 |
End Date |
April 2019 |
Scope of work |
The scope of work includes Procurement, installation, Testing and commissioning, Equipment configuration.
|
|
SNC Lavalin (Kentz) |
Turaif |
August 2018 |
April 2019 |
Oil & Gas |
Warehousing Management for DISA KSA
Sector |
Oil & Gas |
Project Title |
Warehousing Management for DISA KSA |
Project Owner |
Dynamic Industries |
Client |
Dynamic Industries |
Department |
----- |
Location |
Jubail |
Start Date |
September 2018 |
End Date |
July 2019 |
Scope of work |
SENDEN will manage the goods / cargo while inbound and outbound delivery to Dynamic Industries International and their subsidiary Dynamic Industries Saudi Arabia Ltd.
|
|
Dynamic Industries |
Jubail |
September 2018 |
July 2019 |
Petrochemical |
SF2-18 Fab. & Supply of HPBoil1-E301 Tube Bundle, Stage Suction Sep 1-S452 for 1-K405, Oily Cooler 1-K401E1 A&B
Sector |
Petrochemical |
Project Title |
SF2-18 Fab. & Supply of HPBoil1-E301 Tube Bundle, Stage Suction Sep 1-S452 for 1-K405, Oily Cooler 1-K401E1 A&B |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
----- |
Location |
Jubail |
Start Date |
August 2018 |
End Date |
May 2019 |
Scope of work |
The project scope is Procurement of materials, fabrication, testing and supply of 03 Nos. of Oil Cooler (1-K-401 E1A/E1B), Supply of Tube Bundle for HPC Reboiler (1-E-301), Supply of Second Stage Suction Separator (1-S-452) like-tolike as per provided drawings and data sheet by SAFCO.
|
|
SAFCO |
Jubail |
August 2018 |
May 2019 |
Oil & Gas |
Services required for Re-Facin Flanges
Sector |
Oil & Gas |
Project Title |
Services required for Re-Facin Flanges |
Project Owner |
SAUDI ARAMCO / JAZAN |
Client |
Hanwa Saudi Conracting |
Department |
----- |
Location |
Jazan |
Start Date |
September 2018 |
End Date |
December 2018 |
Scope of work |
Scope of work includes Flange facing services at JRTP pkg 14.
|
|
Hanwa Saudi Conracting |
Jazan |
September 2018 |
December 2018 |
Oil & Gas |
Flange Re-Facing With Serration – On Site Work Service
Sector |
Oil & Gas |
Project Title |
Flange Re-Facing With Serration – On Site Work Service |
Project Owner |
SAUDI ARAMCO / UGP |
Client |
Hyundai |
Department |
----- |
Location |
Uthmaniyah |
Start Date |
August 2018 |
End Date |
September 2018 |
Scope of work |
The scope of work includes Re-Facing Flang Serration 12″ & 24 ” at EDRF, HDEC Sites
|
|
Hyundai |
Uthmaniyah |
August 2018 |
September 2018 |
Petrochemical |
Upgrade of Existing Allen Bradley PLC for Boiler in SF-3
Sector |
Petrochemical |
Project Title |
Upgrade of Existing Allen Bradley PLC for Boiler in SF-3 |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
----- |
Location |
Jubail |
Start Date |
July 2018 |
End Date |
April 2019 |
Scope of work |
The Scope of work includes supply of 2nos. new PLC Systems for Allen Bradley PLC-5 Systems. Engineering Services for De-Coding the existing PLC-5 logic and translating and re-coding the same into the new PLC system. Supply of Engineering Laptop pre-loaded with IEC-Toolset Configuration software for Engineering & Programming changes and also installed SOE software license for SOE Configuration. MODBUS Serial communication interface between new PLC System and existing DCS System. Dismantle and removal of existing combined system and marshalling cabinets. Installation of new cabinets by utilizing existing base-frames. Removal of existing instrument cables from the existing panels. Re-wiring of existing instrument cables to new marshalling panels. Cable glanding and termination.
|
|
SAFCO |
Jubail |
July 2018 |
April 2019 |