Oil & Gas |
MFC for T&I 2019 Flange Bolt Torquing
Sector |
Oil & Gas |
Project Title |
MFC for T&I 2019 Flange Bolt Torquing |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
----- |
Location |
Jubail |
Start Date |
January 2019 |
End Date |
December 2019 |
Scope of work |
The scope of work includes Flanges Bolt Torquing Services for T&I activites at Berri Gas Plant
|
|
Berri Gas Plant |
Jubail |
January 2019 |
December 2019 |
Mining & Minerals |
Supply of Fabrication & Supply of Condenser Coils
Sector |
Mining & Minerals |
Project Title |
Supply of Fabrication & Supply of Condenser Coils |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
----- |
Location |
Ras Al-Khair |
Start Date |
December 2018 |
End Date |
February 2019 |
Scope of work |
Supply of Fabrication & Supply of Condenser Coils
|
|
Ma'aden Phosphate |
Ras Al-Khair |
December 2018 |
February 2019 |
Petrochemical |
LSTK services for Mixed Gas Project
Sector |
Petrochemical |
Project Title |
LSTK services for Mixed Gas Project |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
December 2018 |
End Date |
August 2019 |
Scope of work |
The project scope of work includes Engineering, supply, Construction and Commissioning for Mixed Gas Project.
Design and Detailed Engineering. Procurement of material (piping, valves, civil and E&I). Piping fabrication and erection (including demolition and tie-in scope). Scaffolding erection and dismantling. Fabrication and erection of pipe supports (including civil foundations). Modification works for Vessel (43V3). Dismantling and reinstallation of Pressure transmitter. Supply and installation of new DP type flow transmitter with flow element. Supply and installation of secondary cable from new FT to existing JB (43XTB10 having spare terminals). Supply and installation of GI conduit and SS air tubing for newly install FT. Loop checking. DCS configuration.
|
|
SADAF |
Jubail |
December 2018 |
August 2019 |
Oil & Gas |
Scaffolding Services for Yanbu Terminal (Long-Form Contract)
Sector |
Oil & Gas |
Project Title |
Scaffolding Services for Yanbu Terminal (Long-Form Contract) |
Project Owner |
Saudi Aramco |
Client |
YANBU TERMINAL |
Department |
----- |
Location |
Yanbu |
Start Date |
November 2018 |
End Date |
Novmeber 2023 |
Scope of work |
The scope of work includes supervision, manpower, equipment, transportation, offices, catering and accommodation, materials. The services required to transport, erect, disassemble scaffolding and the onshore and offshore facilities at Western Region Terminal Department facilities at Yanbu North Terminal, Yanbu South Terminal, Rabigh Area and Jeddah Terminal.
|
|
YANBU TERMINAL |
Yanbu |
November 2018 |
Novmeber 2023 |
Petrochemical |
Manpower Requirement during TA 2019
Sector |
Petrochemical |
Project Title |
Manpower Requirement during TA 2019 |
Project Owner |
SABIC |
Client |
IBN RUSHD |
Department |
----- |
Location |
Yanbu |
Start Date |
November 2018 |
End Date |
June 2019 |
Scope of work |
The scope of work includes supply of manpower for TA 2019 for IBN RUSHD.
|
|
IBN RUSHD |
Yanbu |
November 2018 |
June 2019 |
Oil & Gas |
Grease for ZV-120/ZV-125 @ FGC (Maintenance of Valves)
Sector |
Oil & Gas |
Project Title |
Grease for ZV-120/ZV-125 @ FGC (Maintenance of Valves) |
Project Owner |
Saudi Aramco |
Client |
Shedgum Gas Plant |
Department |
----- |
Location |
Shedgum |
Start Date |
November 2018 |
End Date |
December 2018 |
Scope of work |
The scope of work includes to apply HP grease to stop the passing issue for the ZV-120 at FGC. Online sealant injection to arrest seat leakages of Pipeline valves.
|
|
Shedgum Gas Plant |
Shedgum |
November 2018 |
December 2018 |
Oil & Gas |
Fire Alarm System Upgrades at Khurais ESP Substations
Sector |
Oil & Gas |
Project Title |
Fire Alarm System Upgrades at Khurais ESP Substations |
Project Owner |
Saudi Aramco |
Client |
Khurais Aramco |
Department |
----- |
Location |
Khurais |
Start Date |
November 2018 |
End Date |
August 2019 |
Scope of work |
The scope of work includes, assessment of existing fire alarm system, design, installation, testing and commissioning of fire alarm system upgrade at ESP substations buildings. Detail design of proposed upgrades, which includes design reports, construction specifications and updating existing drawings. Installation of fire alarm system upgrades as per construction specification, testing, commissioning and provide training to asset owner’s representatives. Upgrade of software/firmware in the existing SIEMENS fire alarm control panel.
|
|
Khurais Aramco |
Khurais |
November 2018 |
August 2019 |
Oil & Gas |
AMC for Emergency Support Elect’18
Sector |
Oil & Gas |
Project Title |
AMC for Emergency Support Elect’18 |
Project Owner |
SABIC |
Client |
Gas Yanbu |
Department |
----- |
Location |
Yanbu |
Start Date |
November 2018 |
End Date |
November 2019 |
Scope of work |
The scope of work includes Technical support, service Engineer or Testing Engineer during the trouble in the GAS Yanbu plant for one year.
|
|
Gas Yanbu |
Yanbu |
November 2018 |
November 2019 |