Oil & Gas |
Annual Maintenance Contract for Mechanical, Welding & Fabrication Services
Sector |
Oil & Gas |
Project Title |
Annual Maintenance Contract for Mechanical, Welding & Fabrication Services |
Project Owner |
SABIC |
Client |
Gas Yanbu |
Department |
----- |
Location |
Jubail |
Start Date |
April 2019 |
End Date |
April 2020 |
Scope of work |
The scope of work cover all welding, machining and fabrication activities which needed in GAS Yanbu plant. It is a unit rate contract and materials include such as Aluminum, stainless steel and carbon steel for construction.
|
|
Gas Yanbu |
Jubail |
April 2019 |
April 2020 |
Petrochemical |
Blast Proof Office Cabin Rental EDC TA19
Sector |
Petrochemical |
Project Title |
Blast Proof Office Cabin Rental EDC TA19 |
Project Owner |
SABIC |
Client |
SADAF |
Department |
----- |
Location |
Jubail |
Start Date |
February 2019 |
End Date |
April 2019 |
Scope of work |
Supply of blast proof cabins on rental basis for EDC shutdown in Jun- 2019. The number of BRMs required are 11 Nos. Service engineer will be available on call basis for any maintenance and trouble shooting.
|
|
SADAF |
Jubail |
February 2019 |
April 2019 |
Petrochemical |
BRM Office Rental for 9 Personnel with Generator
Sector |
Petrochemical |
Project Title |
BRM Office Rental for 9 Personnel with Generator |
Project Owner |
Saudi Chevron |
Client |
Saudi Chevron |
Department |
----- |
Location |
Jubail |
Start Date |
February 2019 |
End Date |
July 2019 |
Scope of work |
Supply of Blast Resistance Modules – 10Psi 200ms (40 X 12 FT) along with 50 KVA Generators.
|
|
Saudi Chevron |
Jubail |
February 2019 |
July 2019 |
Oil & Gas |
MFC- Installation 21 CCTV Cameras as SONPD
Sector |
Oil & Gas |
Project Title |
MFC- Installation 21 CCTV Cameras as SONPD |
Project Owner |
Saudi Aramco |
Client |
SONPD |
Department |
----- |
Location |
SONPD |
Start Date |
February 2019 |
End Date |
December 2019 |
Scope of work |
The scope of work includes supply, installation, testing and commissioning of 21 CCTV Cameras at SONPD
|
|
SONPD |
SONPD |
February 2019 |
December 2019 |
Petrochemical |
Removal- Re-Installation of Valves, PSVs, CVs, Sea Water Valves, Sea Water Headers and MISC job
Sector |
Petrochemical |
Project Title |
Removal- Re-Installation of Valves, PSVs, CVs, Sea Water Valves, Sea Water Headers and MISC job |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
----- |
Location |
Jubail |
Start Date |
February 2019 |
End Date |
April 2019 |
Scope of work |
The SOW includes Blinding & De-blinding of the Equipment’s, Opening & Box up of the Equipment’s, and Torque Tightening of all related flanges which will be opened during TA. The equipment include:
• SW Headers (Supply & Return)
• SW valves (59 no.)
• Block valves / Critical Valves (169 no.)
• PSV’s (82 no.) & Control Valves (111 no.)
• Misc. Equipments: Ejector (2 no.), De-Super heater (2 no.), Static Mixer (3 no.), Stack (1 no.), FD Fan (1 no.)
• Corroded Piping & Elbow Replacement (2 no.)
|
|
IBN-SINA |
Jubail |
February 2019 |
April 2019 |
Petrochemical |
Long Term Agreement for All types of Machinery & Fabrication Services to Sahara affiliates (3 Years)
Sector |
Petrochemical |
Project Title |
Long Term Agreement for All types of Machinery & Fabrication Services to Sahara affiliates (3 Years) |
Project Owner |
SAHARA |
Client |
SAHARA |
Department |
----- |
Location |
Jubail |
Start Date |
January 2019 |
End Date |
January 2022 |
Scope of work |
The project scope is to carry out LTA for all types of Machinery and Fabrication services to Sahara Affiliates for a period of three years. It includes Machining Repair, Fabrication Repair and all inspection findings during break down.
|
|
SAHARA |
Jubail |
January 2019 |
January 2022 |
Petrochemical |
Scaffolding works at FARABI, Yanbu
Sector |
Petrochemical |
Project Title |
Scaffolding works at FARABI, Yanbu |
Project Owner |
Farabi Petrochemicals |
Client |
NCC |
Department |
----- |
Location |
Yanbu |
Start Date |
January 2019 |
End Date |
March 2019 |
Scope of work |
The scope of work includes supervision, manpower, equipment, transportation, Erection and dismantling of scaffolding.
|
|
NCC |
Yanbu |
January 2019 |
March 2019 |
Petrochemical |
Fabrication of two screw shafts
Sector |
Petrochemical |
Project Title |
Fabrication of two screw shafts |
Project Owner |
Tasnee |
Client |
Tasnee |
Department |
----- |
Location |
Jubail |
Start Date |
January 2019 |
End Date |
February 2019 |
Scope of work |
The scope of work includes fabrication of two secrew shafts.
|
|
Tasnee |
Jubail |
January 2019 |
February 2019 |