Project: Abha Fire Protection And Industrial Draining System
Client: Saudi Arabian Oil Company
Completion Year:
Prime Contractor:
Scope of Work:
Location: Abha
The purpose of this project is to upgrade the fire protection systems and industrial drainage systems at Abha Bulk Plant to meet safety requirements (LSPB).
The major part of the scope of work includes Demolish and Installation of Fire Hydrants, Erection of Vertical Turbine OWS Pumps, Fire Alarm Control System, Process Control System, Fire Detection Systems, UPS Systems, Pressure & Control Valves, Protection Relay, Cathodic Protection Systems, Oily Water Separator (CPI), Firewater Pump (Diesel Engine Driven), Firewater Pump (Electrical Engine Driven) and Emergency Siren System.