The purpose of this project is to upgrade the fire protection systems and industrial drainage systems at Abha Bulk Plant to meet safety requirements (LSPB).
The major part of the scope of work includes Demolish and Installation of Fire Hydrants, Erection of Vertical Turbine OWS Pumps, Fire Alarm Control System, Process Control System, Fire Detection Systems, UPS Systems, Pressure & Control Valves, Protection Relay, Cathodic Protection Systems, Oily Water Separator (CPI), Firewater Pump (Diesel Engine Driven), Firewater Pump (Electrical Engine Driven) and Emergency Siren System.
Client: Saudi Aramco/ Abha Bulk Plant
Our offices and branches throughout the region
P.O. Box 11049 Tareeq 114 Jubail Industrial City 31961 Kingdom of Saudi Arabia Tel: +966-13-341-2343 Fax: +966-13-341-1288 e-mail: sendan@sendan.com.sa
Saudi Arabia
United Arab Emirates
Qatar
Korea
India