The project scope of work includes Engineering, Procurement, Construction / Installation of Sampling System for Berth 61, 62 and 64 at Yanbu North Terminal.
The automatic sampling system for Berth 61 and 64 will be installed upstream the metering skid for above ground 56” crude loading pipeline at CTF.
Client: Saudi Aramco/ Yanbu North Terminal
Our offices and branches throughout the region
P.O. Box 11049 Tareeq 114 Jubail Industrial City 31961 Kingdom of Saudi Arabia Tel: +966-13-341-2343 Fax: +966-13-341-1288 e-mail: sendan@sendan.com.sa
Saudi Arabia
United Arab Emirates
Qatar
Korea
India