Project: Benzene Storage Enhancement
Client: SADAF
Completion Year: 2016
Prime Contractor:
Scope of Work: Engineering, Procurement & Supply Of Material, Fabrication & Installation (EPC) Of Piping & Equipment. • At two locations (SADAF & SABTANK) Replace the tank bottom in kind with a new one at • Install a leak detection system liner • Install new cathodic protection system. • Contaminated sand beneath tank • Replace the contaminated oily sand by sweet sand • Replace asbestos gaskets • Replace elastomeric seal materials • Civil and E&I works
Location: Jubail
Engineering, Procurement & Supply Of Material, Fabrication & Installation (EPC) Of Piping & Equipment.
• At two locations (SADAF & SABTANK) Replace the tank bottom in kind with a new one at
• Install a leak detection system liner
• Install new cathodic protection system.
• Contaminated sand beneath tank
• Replace the contaminated oily sand by sweet sand
• Replace asbestos gaskets
• Replace elastomeric seal materials
• Civil and E&I works