Project: Fabricaction, Construction, Erection and Installation of Waxer Unit in Rolling Mill
Client: MA'ADEN ALUMINIUM
Completion Year: 2016
Prime Contractor:
Scope of Work: The Scope of work includes Dismantling of existin equipment, Erection of structural steel wor, Installation of hydraulic equipment, Mobile crane operation, Scaffolding, Piping installation & installation of Waxer, Electrical installations( Cable Channels & Cable protection pipe) are also included in scope of work
Location: Ras Al-Khair
The Scope of work includes Dismantling of existin equipment, Erection of structural steel wor, Installation of hydraulic equipment, Mobile crane operation, Scaffolding, Piping installation & installation of Waxer, Electrical installations( Cable Channels & Cable protection pipe) are also included in scope of work