Project: Electrical PM works for Power Transformer of desalter V171 during 2017 CFS @ RRD
Client: Riyadh Refinery
Completion Year: 2017
Prime Contractor:
Scope of Work: The brief scope of work is as below: To provide all supervision, manpower, equipment, tools and test instrument. To Perform initial inspection of the electrical connection system especially related to the condition of the transformers and bushing connections. To Replace insulation oil of the power transformers, To Dismantle electric insulators and replace with new ones.To Remove the electrical entrance bushing from the bushing housing and replace it. To Reinstall all power and control cable of the desalter transformer.Pre-commission the transformers as per SAUDI ARAMCO procedures.
Location: Riyadh
The brief scope of work is as below:
To provide all supervision, manpower, equipment, tools and test instrument. To Perform initial inspection of the electrical connection system especially related to the condition of the transformers and bushing connections. To Replace insulation oil of the power transformers, To Dismantle electric insulators and replace with new ones.To Remove the electrical entrance bushing from the bushing housing and replace it. To Reinstall all power and control cable of the desalter transformer.Pre-commission the transformers as per SAUDI ARAMCO procedures.