Project: Installation of C20 Filter to capture Polymer LAO (Linear alpha olifines)
Client: UNITED
Completion Year: 2016
Prime Contractor:
Scope of Work: During LAO plant T/A, Following activities were performed, Design, Engineering, Supply, Installation,Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product. along with associated site works including Piping, Fabrication, Welding, Civil/ structural Work for routing of pipes and cables covered under this project , Removal and reinstallation of Electrical heat tracing. Installation of instruments, Supply and laying signal cable, Loop check for all the instruments
Location: Jubail
During LAO plant T/A, Following activities were performed,
Design, Engineering, Supply, Installation,Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product. along with associated site works including Piping, Fabrication, Welding, Civil/ structural Work for routing of pipes and cables covered under this project , Removal and reinstallation of Electrical heat tracing. Installation of instruments, Supply and laying signal cable, Loop check for all the instruments