Project: LSTK for SF4 Cooling Tower Revamp and Providing CP System
Client: SAFCO
Completion Year: 2021
Prime Contractor:
Scope of Work: - The project scope for Cooling Tower Revamp includes detail design, engineering, procurement, supply, construction, installation, testing, pre-commissioning, and commission assistance for the civil works for the revamping of cooling tower along with cathodic protection (CP) works for the cooling tower. - All civil / mechanical works, concrete repair and CP system installation works (except for concrete repair along with the CP system for 800mm internal portion of the Fans rings), the work will be carried out during the Cooling Tower operating conditions. - A new CP system shall be installed along with new power cables from feeders to CP power supply units. - Existing vibration switches, accelerometer probes etc shall be removed and reinstalled after the work is completed.
Location: Jubail
– The project scope for Cooling Tower Revamp includes detail design, engineering, procurement, supply, construction, installation, testing, pre-commissioning, and commission assistance for the civil works for the revamping of cooling tower along with cathodic protection (CP) works for the cooling tower.
– All civil / mechanical works, concrete repair and CP system installation works (except for concrete repair along with the CP system for 800mm internal portion of the Fans rings), the work will be carried out during the Cooling Tower operating conditions.
– A new CP system shall be installed along with new power cables from feeders to CP power supply units.
– Existing vibration switches, accelerometer probes etc shall be removed and reinstalled after the work is completed.