Project: PAP Subgrade Electromechanical Work
Client: Ma'aden Phosphate
Completion Year: 2018
Prime Contractor:
Scope of Work: The scope of work includes supply, installation, testing, pre-commissioning and commissioning of the sump pump and sump agitator. Installation of all Piping Tie-ins interfacing with existing systems. Installation of Valves and in line instrument as per Piping Isometric. Fabrication and erection of steel structure and construction of civil foundation with brick lining.
Location: Ras Al-Khair
The scope of work includes supply, installation, testing, pre-commissioning and commissioning of the sump pump and sump agitator. Installation of all Piping Tie-ins interfacing with existing systems. Installation of Valves and in line instrument as per Piping Isometric. Fabrication and erection of steel structure and construction of civil foundation with brick lining.