Project: PAP Subgrade Electromechanical Work

Client: Ma'aden Phosphate

Completion Year: 2018

Prime Contractor:

Scope of Work: The scope of work includes supply, installation, testing, pre-commissioning and commissioning of the sump pump and sump agitator. Installation of all Piping Tie-ins interfacing with existing systems. Installation of Valves and in line instrument as per Piping Isometric. Fabrication and erection of steel structure and construction of civil foundation with brick lining.

Location: Ras Al-Khair

The scope of work includes supply, installation, testing, pre-commissioning and commissioning of the sump pump and sump agitator. Installation of all Piping Tie-ins interfacing with existing systems. Installation of Valves and in line instrument as per Piping Isometric. Fabrication and erection of steel structure and construction of civil foundation with brick lining.

Our Presence

Our offices and branches throughout the region

Headquarters

P.O. Box 11049 Tareeq 114 Jubail Industrial City 31961 Kingdom of Saudi Arabia Tel: +966-13-341-2343 Fax: +966-13-341-1288 e-mail: sendan@sendan.com.sa

Affiliates and group companies

Saudi Arabia

  • SENDAN International Company Limited, Yanbu
  • SENSORTECH Saudi Manufacturing Company,
    Al-Khobar
  • MAWAD SENDAN Trading,
    Al-Khobar
  • Basees SENDAN Security Technology, Dammam

United Arab Emirates

  • SENDAN International FZCO, Dubai.

Qatar 

  • First SENDAN Contracting & Trading Co. WLL, Doha

Korea

  • SENDAN Korea Limited, Seoul.

India

  • SENDAN International Telecom Private Limited, Mumbai
  • Crebri Technologies Private Limited, Noida