Project: Removal- Re-Installation of Valves, PSVs, CVs, Sea Water Valves, Sea Water Headers and MISC job
Client: IBN-SINA
Completion Year: 2019
Prime Contractor:
Scope of Work: The SOW includes Blinding & De-blinding of the Equipment’s, Opening & Box up of the Equipment’s, and Torque Tightening of all related flanges which will be opened during TA. The equipment include: • SW Headers (Supply & Return) • SW valves (59 no.) • Block valves / Critical Valves (169 no.) • PSV’s (82 no.) & Control Valves (111 no.) • Misc. Equipments: Ejector (2 no.), De-Super heater (2 no.), Static Mixer (3 no.), Stack (1 no.), FD Fan (1 no.) • Corroded Piping & Elbow Replacement (2 no.)
Location: Jubail
The SOW includes Blinding & De-blinding of the Equipment’s, Opening & Box up of the Equipment’s, and Torque Tightening of all related flanges which will be opened during TA. The equipment include:
• SW Headers (Supply & Return)
• SW valves (59 no.)
• Block valves / Critical Valves (169 no.)
• PSV’s (82 no.) & Control Valves (111 no.)
• Misc. Equipments: Ejector (2 no.), De-Super heater (2 no.), Static Mixer (3 no.), Stack (1 no.), FD Fan (1 no.)
• Corroded Piping & Elbow Replacement (2 no.)