Project: Voltage Conversion at HDGOSP-2
Client: HDGOSP-2
Completion Year: 2022
Prime Contractor:
Scope of Work: The project scope includes to replace the existing voltage of 208/120V power distribution system to new 400/230V system for Non-industrial buildings and switchgear building at Haradh GOSP-2 facilities.
Location: Haradh
The project scope includes to replace the existing voltage of 208/120V power distribution system to new 400/230V system for Non-industrial buildings and switchgear building at Haradh GOSP-2 facilities.