• fb
  • fb
  • fb
  • fb
  • fb
Slide background

OUR PROJECTS

Join the tide to build the future

Projects > Our Project

Oil & Gas

Early Works For Demolition Of Abandoned Pipe Corridor

Early Works For Demolition Of Abandoned Pipe Corridor

Client : Saudi Aramco, Ras Tanura

Prime Contractor : Tecnicas Reunidas

Disciplines : Early Works For Demolition Of Abandoned Pipe Corridor

Location : Ras Tanura, KSA

Completion : May, 2018

Scope of Work : Demolition of reinforced concrete sleepers; excavation in general soil, up to 3 meters deep including dewatering; supply and execution of backfilling in foundations, pits, extrados of walls, trenches and channels, carried out in layers with borrowed material; lading, transport and unloading of remainder material from excavation out of the limits of property in an external authorized dumping area.

Saudi Aramco, Ras Tanura

Ras Tanura, KSA

May, 2018

Oil & Gas

Bolt Torqueing & Tensioning For KT-221 GT Area

Bolt Torqueing & Tensioning For KT-221 GT Area

Client : Saudi Aramco, Utmania Gas Plant

Prime Contractor : Saudi Aramco, Utmania Gas Plant

Disciplines : Bolt Torqueing & Tensioning For KT-221 GT Area

Location : Uthmania, KSA

Completion : January, 2018

Scope of Work : Provision of Hydraulic bolt tightening (torque machine) to loosen and tighten the bolts of the compressor KT-221 in North Gas Treat Area.

Saudi Aramco, Utmania Gas Plant

Uthmania, KSA

January, 2018

Oil & Gas

Replace 69KV Cables From Substation # 90 To Substation # 54 At RT Refinery

Replace 69KV Cables From Substation # 90 To Substation # 54 At RT Refinery

Client : Saudi Aramco, Ras Tanura

Prime Contractor : Saudi Aramco, Ras Tanura

Disciplines : Replace 69KV Cables From Substation # 90 To Substation # 54 At RT Refinery

Location : Ras Tanura, KSA

Completion : April, 2018

Scope of Work : It involves replacement of existing two 69kV circuit feeder cables from substation#90 upto primary side of the existing transformers at substation#54 including below scope:
- Installation of GIS sealing and Outdoor sealing for 69kV XLPE Cables.
- Cable pulling works for two 69kV circuit feeders.
- Cable splicing works for two 69kV circuit feeders.
- Gassing and de-gassing works and testing & commissioning works.

Saudi Aramco, Ras Tanura

Ras Tanura, KSA

April, 2018

Petrochemicals

Restore The (RG) Vent Line Movement From Support In Ar-Razi Plant II ESD (Emergency)

Restore The (RG) Vent Line Movement From Support In Ar-Razi Plant II ESD (Emergency)

Client : SABIC / AR-RAZI

Prime Contractor : SABIC / AR-RAZI

Disciplines : Restore The (RG) Vent Line Movement From Support In Ar-Razi Plant II ESD (Emergency)

Location : Jubail, KSA

Completion : December, 2017

Scope of Work : The project scope is to carry out the emergency work for RG Vent Line Rectification works in Plant-II ESD. It includes rectification of 24” line by cutting at joints and rectification of pipe support and damaged structure along with provision of all necessary material to complete the job.

SABIC / AR-RAZI

Jubail, KSA

December, 2017

Petrochemicals

Repairing of 30" PNG Line At Ar-Razi Plant III (Emergency)

Repairing of 30" PNG Line At Ar-Razi Plant III (Emergency)

Client : SABIC / AR-RAZI

Prime Contractor : SABIC / AR-RAZI

Disciplines : Repairing of 30″ PNG Line At Ar-Razi Plant III (Emergency)

Location : Jubail, KSA

Completion : December, 2017

Scope of Work : The project scope was to carry out the emergency work repair of 30” PNG Line at Ar-Razi Plant III. The pipe material is SS 321 and thickness 21 mm. It includes grinding of 4 Nos. pipe joints up to root and re-welding, rectification for 1 no. pipe support along with complete radiography test (RT).

SABIC / AR-RAZI

Jubail, KSA

December, 2017

Petrochemicals

Fiber Optics Troubleshooting Services

Fiber Optics Troubleshooting Services

Client : SABIC / SABTANK

Prime Contractor : SABIC / SABTANK

Disciplines : Fiber Optics Troubleshooting Services

Location : Jubail, KSA

Completion : February, 2018

Scope of Work : Maintenance, troubleshooting and site support services for Fiber Optic Cable Communication of Sabtank ESD System, DCS system, PLC systems, RTG system and Instrumentation. These services include:
1. Fiber Optic Cable Communication for GE FANUC ESD -PLC systems, Yokogawa DCS system, RTG system and Instrumentation installed for all SABIC and Non-SABIC affiliates
2. Fiber Optic Cable Communication between CCR, LCR, Berths for all SABIC and Non-SABIC affiliates.
3. Fiber Optic Cable Communication for interface and communication between GE FANUC ESD system, Yokogawa DCS. system, RTG system and Instrumentation for all SABIC and Non-SABIC affiliates.

SABIC / SABTANK

Jubail, KSA

February, 2018

Oil & Gas

Upgrade Hawiyah Gas Plant Area Alerting System

Upgrade Hawiyah Gas Plant Area Alerting System

Client : Saudi Aramco, Hawiyah Gas Plant

Prime Contractor : Saudi Aramco, Hawiyah Gas Plant

Disciplines : Upgrade Hawiyah Gas Plant Area Alerting System

Location : Hawiyah, KSA

Completion : May, 2018

Scope of Work : The scope includes preparation of doundation design power layout and other engineering requirements to install new electronic multi-tone emergency sirens. Contractor shall size and route the cable from junction box mounted in the omni directional antenna to the control room and preparation of necessary structural foundations.

Saudi Aramco, Hawiyah Gas Plant

Hawiyah, KSA

May, 2018

Oil & Gas

Overspeed Trip Relays Relocation PH8 Expanders 81-ET-001 AB/002

Overspeed Trip Relays Relocation PH8 Expanders 81-ET-001 AB/002

Client : SABIC / GAS-Jubail

Prime Contractor : SABIC / GAS-Jubail

Disciplines : Overspeed Trip Relays Relocation PH8 Expanders 81-ET-001 AB/002

Location : Jubail, KSA

Completion : January, 2018

Scope of Work : The scope includes supply, installation, testing and commissioning of PILZ Relays, Instrument cables and conduit pipes for Expander Overspeed Trip Relay Relocation in Gas Jubail.

SABIC / GAS-Jubail

Jubail, KSA

January, 2018