Petrochemicals

Repair Monel Chutes & Centrifuge during EDC TA'19

Repair Monel Chutes & Centrifuge during EDC TA'19

Client : SABIC (SADAF)

Prime Contractor : SABIC (SADAF)

Disciplines : Repair Monel Chutes & Centrifuge during EDC TA’19

Location : Jubail, KSA

Completion : July, 2019

Scope of Work : The scope of work includes, Sand blasting for chutes to remove any Belzona and other contaminations and Bottom casing flange to remove any Belzona and other contaminations. Perform Neutralization (to remove Caustic) for all weld joints & surface cracks for chutes & centrifuge bottom casing flange. Perform weld seam repairs and cracks repairs as per findings. Plates/flanges replacements may also be required as per findings or crack during repair work. Drilling for chute flanges with bottom casing flange. Weld build up and machining for centrifuge bottom casing flanges, as per findings (ensure flatness for flanges, to avoid any leakage). Perform DPT after final weld repairs and machining. Drilling and tapping for centrifuge bottom flange holes.

SABIC (SADAF)

Jubail, KSA

July, 2019

Oil & Gas

MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker

MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker

Client : Ras Tanura, KSA

Prime Contractor : ARAMCO

Disciplines : MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker

Location : Ras Tanura, KSA

Completion : June, 2020

Scope of Work : The Project Scope is to carry out Complete Electrical works for upgrading the electrical power system at West Pier. The details scope of work includes, Evaluate and calculate the load requirements including existing equipment and all new equipment of 2.4KV Field Switches with 13.8 Kv and Procure of 2 Existing Obsolete 2.4kv Breaker. Supply and installation of 12 No's of SF 6 switches (13.8 Kv Volts), 2 No's of 2.4 Kv rolling breakers for spares & Conduit and fittings installation. Excavate and lay power cable from the 5.0 k Volts power panel to all portable offices, all existing and new equipment.

Ras Tanura, KSA

Ras Tanura, KSA

June, 2020

Oil & Gas

RETROFIT THE DEHYDRATOR VESSEL AT SHGOSP-5 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM

RETROFIT THE DEHYDRATOR VESSEL AT SHGOSP-5 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM

Client : SAUDI ARAMCO (Shedgum GOSP-5)

Prime Contractor : SAUDI ARAMCO (Shedgum GOSP-5)

Disciplines : RETROFIT THE DEHYDRATOR VESSEL AT SHGOSP-5 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM

Location : Shedgum

Completion : May, 2018

Scope of Work : Its includes demolition of Internal Headers, Distributors, Grids, Transformers and Bushings (for both D-211 and D-212). Installation of Vessel Components (Oil Headers, Effluent Water Collector-D-211, Interface draw-off collectors, hangers and support framers, Electrodes, Dual Frequency (DF) Power Units, High Voltage Bushings and Electrode Assemblies, DFD LRC II Control Panel (Control room and interface with DCS & ESD), new nozzles, 480V Power Supply units, level Transmitters).

SAUDI ARAMCO (Shedgum GOSP-5)

Shedgum

May, 2018

Petrochemicals

LSTK for SF4 Cooling Tower Revamp and Providing CP System

LSTK for SF4 Cooling Tower Revamp and Providing CP System

Client : SABIC (SAFCO)

Prime Contractor : SABIC (SAFCO)

Disciplines : LSTK for SF4 Cooling Tower Revamp and Providing CP System

Location : Jubail. KSA

Completion : July ,2021

Scope of Work : "- The project scope for Cooling Tower Revamp includes detail design, engineering, procurement, supply, construction, installation, testing, pre-commissioning, and commission assistance for the civil works for the revamping of cooling tower along with cathodic protection (CP) works for the cooling tower.
- All civil / mechanical works, concrete repair and CP system installation works (except for concrete repair along with the CP system for 800mm internal portion of the Fans rings), the work will be carried out during the Cooling Tower operating conditions.
- A new CP system shall be installed along with new power cables from feeders to CP power supply units.
- Existing vibration switches, accelerometer probes etc shall be removed and reinstalled after the work is completed."

SABIC (SAFCO)

Jubail. KSA

July ,2021

Petrochemicals

Piping, DCRs and Valves Package for Olefins TAM’2020

Piping, DCRs and Valves Package for Olefins TAM’2020

Client : SABIC (Sharq)

Prime Contractor : SABIC (Sharq)

Disciplines : Piping, DCRs and Valves Package for Olefins TAM’2020

Location : Jubail, KSA

Completion : February, 2020

Scope of Work : The SOW includes removal of existing pipe lines, fabrication of pipe line as per IFC, Installation of pipe line, SAFE RAD of joints, sand blasting & painting, NDT of workshop joints, removal & cutting of the valves, installation of valves, scaffolding erection/removal along with materials, insulation removal and re-installation, cold cutting, machining, hydro-testing of new lines, and PWHT HP Steam Valves - 03 Nos

SABIC (Sharq)

Jubail, KSA

February, 2020

Petrochemicals

Annular/Bottom Plate Repair of Tanks (4 Nos.) during OLF-2 Turnaround NOV’2019

Annular/Bottom Plate Repair of Tanks (4 Nos.) during OLF-2 Turnaround NOV’2019

Client : SABIC (Petro Kemya)

Prime Contractor : SABIC (Petro Kemya)

Disciplines : Annular/Bottom Plate Repair of Tanks (4 Nos.) during OLF-2 Turnaround NOV’2019

Location : Jubail, KSA

Completion : December, 2019

Scope of Work : The SOW includes, repair of tank annular/bottom plates of four tanks based on the inspection findings & recommendations in line with the scope of works mentioned herewith, during Olefins-2 Plant Turnaround scheduled to start on 15th Nov, 2019. It also includes removal of one plate on shell course to allow entry of new bottom patch plates, repair of annular plates, bottom plates, and fit-up /welding of new patch plates, Weld repair, re-fit and welding of one plate shell course.

SABIC (Petro Kemya)

Jubail, KSA

December, 2019

Mining & Minerals

Client :

Prime Contractor :

Disciplines : Blending of MPC & MWSPC Phosphoric Acid

Location :

Completion :

Scope of Work :

Mining & Minerals

PAP Subgrade Electromechanical work

PAP Subgrade Electromechanical work

Client : MA'ADEN (Ma'aden Phosphate)

Prime Contractor : MA'ADEN (Ma'aden Phosphate)

Disciplines : PAP Subgrade Electromechanical work

Location : Ras Al Khair

Completion : August 2018

Scope of Work : The scope of work includes supply, installation, testing, pre-commissioning and commissioning of the sump pump and sump agitator. Installation of all Piping Tie-ins interfacing with existing systems. Installation of Valves and in line instrument as per Piping Isometric. Fabrication and erection of steel structure and construction of civil foundation with brick lining.

MA'ADEN (Ma'aden Phosphate)

Ras Al Khair

August 2018