Petrochemical |
Installation of New Heat Exchanger of Hydraulic oil in PDH
Sector |
Petrochemical |
Project Title |
Installation of New Heat Exchanger of Hydraulic oil in PDH |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/14 |
End Date |
01/07/14 |
Scope of work |
Installation of New Heat Exchanger includes, piping modification, equipment installation and civil works.
|
|
TASNEE |
Jubail |
01/04/14 |
01/07/14 |
Petrochemical |
Prefabrication and replacement of pipelines in VCM/PVC 2014 TA
Sector |
Petrochemical |
Project Title |
Prefabrication and replacement of pipelines in VCM/PVC 2014 TA |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/14 |
End Date |
01/10/14 |
Scope of work |
Pre-fabrication and replacement of pipe lines, Piping modification
|
|
PetroKemya |
Jubail |
01/06/14 |
01/10/14 |
Petrochemical |
Boiler Assessment implementation project
Sector |
Petrochemical |
Project Title |
Boiler Assessment implementation project |
Project Owner |
SABIC |
Client |
YANPET |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/06/14 |
End Date |
01/12/14 |
Scope of work |
The project involves fabrication and installation of Boiler for the Boiler Assessment implementation project
|
|
YANPET |
Yanbu |
01/06/14 |
01/12/14 |
Petrochemical |
Pr For Import Co2 Line From United
Sector |
Petrochemical |
Project Title |
Pr For Import Co2 Line From United |
Project Owner |
SABIC |
Client |
AL-BAYRONI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/14 |
End Date |
01/01/15 |
Scope of work |
Project involves Engineering, Procurement & Installation of Piping, Equipments involves all disciplines like: Mechanical. Electrical, Civil & instrumentation.
|
|
AL-BAYRONI |
Jubail |
01/05/14 |
01/01/15 |
Petrochemical |
Construction project-5th effect evaporator overhead line and uograde metallurgy of line
Sector |
Petrochemical |
Project Title |
Construction project-5th effect evaporator overhead line and uograde metallurgy of line |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/14 |
End Date |
01/01/15 |
Scope of work |
LSTK EPC Project involves on all the disciplines like Mechanical, Electrical & Instrumentation, Civil along with detailed Engineering.
|
|
UNITED |
Jubail |
01/05/14 |
01/01/15 |
Petrochemical |
3 ” Line for Vacuuming on Reactor
Sector |
Petrochemical |
Project Title |
3 ” Line for Vacuuming on Reactor |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/14 |
End Date |
01/11/14 |
Scope of work |
EPC Project on LSTK basis involves Mechanical, Fabrication & Construction activities, to remove all vacuum lines and install new permanent vacuum lines for all the reactors of Plant 1,2,3 & 4
|
|
SHARQ |
Jubail |
01/04/14 |
01/11/14 |
Oil & Gas |
Install Manual Block Valve at Ph-7 filter
Sector |
Oil & Gas |
Project Title |
Install Manual Block Valve at Ph-7 filter |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/14 |
End Date |
01/05/14 |
Scope of work |
Removal and Re-installation of manual block valve / isolation valve at Phase 7 Filter
|
|
Gas Jubail |
Jubail |
01/04/14 |
01/05/14 |
Oil & Gas |
Ph-8 GOX Pipeline Material Replacement
Sector |
Oil & Gas |
Project Title |
Ph-8 GOX Pipeline Material Replacement |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/14 |
End Date |
01/05/14 |
Scope of work |
Replacement of existing CS pipe and 02 Nos. with elbows of Monel material during the Ph-8 GOX Pipeline Material Replacement Project
|
|
Gas Jubail |
Jubail |
01/04/14 |
01/05/14 |