• fb
  • fb
  • fb
  • fb
  • fb
Slide background

OUR PROJECTS

Join the tide to build the future

Projects > Our Project

Petrochemicals

EPC LSTK for Replacement of DEG/TEG/MEG and Service Water Pipelines at Tank Farm and Loading Bay in Sabtank Jubail

EPC LSTK for Replacement of DEG/TEG/MEG and Service Water Pipelines at Tank Farm and Loading Bay in Sabtank Jubail

Client : SABIC (Sabtank Jubail)

Prime Contractor : SABIC (Sabtank Jubail)

Disciplines : EPC LSTK for Replacement of DEG/TEG/MEG and Service Water Pipelines at Tank Farm and Loading Bay in Sabtank Jubail

Location : Jubail, KSA

Completion : April 2020

Scope of Work : The SOW includes designing, engineering, procurement, installation and testing and comissioning of various works such as: The Major SOW for TEG piping lines includes demolition & replacement only. Scope for DEG piping lines includes demolition & replacement also. MEG piping lines also includes demolition & replacement scope. It also includes MEG Service Water Lines demolition, replacement and painting activities. Other activates includes manual excavation, associated civil works, dewatering, concrete duck bank, concrete thrust block etc. Electrical works includes supply of power system to the new cathodic protection (CP) system for the major lines and service water lines. Instrumentation works includes dismantling and re-use of existing instruments, calibration as well as DCS and ESD support.

SABIC (Sabtank Jubail)

Jubail, KSA

April 2020

Oil & Gas

To Provide Scaffolding Services for SGPD's Facilities

To Provide Scaffolding Services for SGPD's Facilities

Client : SAUDI ARAMCO (SGPD)

Prime Contractor : SAUDI ARAMCO (SGPD)

Disciplines : To Provide Scaffolding Services for SGPD’s Facilities

Location : SGPD, KSA

Completion : May, 2021

Scope of Work : The scope of work is to provide scaffolding services at SGPD's plants and other locations such as off-plot pipelines, valves & welheads.

SAUDI ARAMCO (SGPD)

SGPD, KSA

May, 2021

Oil & Gas

Scaffolding Requirements in 8 tanks Jazan

Scaffolding Requirements in 8 tanks Jazan

Client : SAUDI ARAMCO (Petrofac)

Prime Contractor : SAUDI ARAMCO (Petrofac)

Disciplines : Scaffolding Requirements in 8 tanks Jazan

Location : Jizan

Completion : February, 2019

Scope of Work : Scope of work includes hanging scaffolding services for 8 Tanks in EPC-4 North Tank Farm Area at Jizan Refinery Project

SAUDI ARAMCO (Petrofac)

Jizan

February, 2019

Petrochemicals

Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years)

Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years)

Client : SADARA (SADARA)

Prime Contractor : SADARA (SADARA)

Disciplines : Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years)

Location : SGPD, KSA

Completion : May, 2023

Scope of Work : The scope of work is to provide necessary personnel, scaffolding materials, supervision and transportation for the provision of scaffolding services in all SADARA plants. The details work includes rigging, erection and dismantling of tower built scaffolding, independent tied scaffolding, suspended scaffolding, mobile tower scaffolding, Vessel/Column/tank exterior scaffolding and vessel/column/tank interior scaffolding and the provision of scaffolding maintenance services including site cleanup.

SADARA (SADARA)

SGPD, KSA

May, 2023

Petrochemicals

Piping Recommendation 3'' BFW Line // Ar-Razi Emergency Requirement

Piping Recommendation 3'' BFW Line // Ar-Razi Emergency Requirement

Client : SABIC (Ar-Razi)

Prime Contractor : SABIC (Ar-Razi)

Disciplines : Piping Recommendation 3” BFW Line // Ar-Razi Emergency Requirement

Location : Jubail, KSA

Completion : September 2019

Scope of Work : The project scope is to carry out the replacement work for the 3” BFW line in AR-RAZI. The replacement works involve 24-meter pipe, 11 elbows and 2 pipe supports.

SABIC (Ar-Razi)

Jubail, KSA

September 2019

Petrochemicals

EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122

EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122

Client : SABIC (Ibn Al-Baytar)

Prime Contractor : SABIC (Ibn Al-Baytar)

Disciplines : EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122

Location : Jubail, KSA

Completion : July, 2020

Scope of Work : The scope of work includes Engineering, Procurement & construction. The details scope of work includes supply, installation, Testing and Commissioning of Transformer differential Relay for T/F differential Protection, Feeder Protection O/C Relay for Feeder Protection, Motor Feeder Protection Relays for Feeder Protection, Earth leakage Relays, LV MCCBs, new Switchgear and associated Bus duct in substation.

SABIC (Ibn Al-Baytar)

Jubail, KSA

July, 2020

Mining & Minerals

Procurement & Construction of 40% product acid transfer line size enhancement from 4" to 6" in PAP Train B & A

Procurement & Construction of 40% product acid transfer line size enhancement from 4" to 6" in PAP Train B & A

Client : Ma'aden Phosphate (Ma'aden Phosphate)

Prime Contractor : Ma'aden Phosphate (Ma'aden Phosphate)

Disciplines : Procurement & Construction of 40% product acid transfer line size enhancement from 4″ to 6″ in PAP Train B & A

Location : Ras Al Khair, KSA

Completion : April, 2020

Scope of Work : The project scope includes to piping & valves replacement and demolishing of existing pipe line & valves, fabrication of new pipe line as per IFC, Installation of new pipe line, installation of valves, NDT & painting, Installation of Flow Transmitter & Cabling work at MA’ADEN Plant, NDT, Painting, sand basting, scaffolding and hydro testing, commissioning, disconnecting / removal existing cable, supply & laying of new cables, termination of cables.

Ma'aden Phosphate (Ma'aden Phosphate)

Ras Al Khair, KSA

April, 2020

Petrochemicals

Major Piping Fabrication & Replacement EDC T/A-2019

Major Piping Fabrication & Replacement EDC T/A-2019

Client : SABIC (SADAF)

Prime Contractor : SABIC (SADAF)

Disciplines : Major Piping Fabrication & Replacement EDC T/A-2019

Location : Jubail, KSA

Completion : July, 2019

Scope of Work : The SOW includes Replacement of Piping during EDC T/A scheduled on June-2019. Piping replacement is on 32C8-Cl2 relief header, 32C508 relief header, 32C502 to 32K501 and 32K501 to 32V597 through 32E506/505, Emergency neutralization header, WET KAPA from 32V33/32V121 to 36IN2. Moreover, it includes cold cutting, removal of old pipe, connected valves and reinstallation after the new pipe laying.

SABIC (SADAF)

Jubail, KSA

July, 2019