Petrochemical |
To Supply Scaffolding Services
Sector |
Petrochemical |
Project Title |
To Supply Scaffolding Services |
Project Owner |
SADARA |
Client |
SADARA |
Department |
SCF |
Location |
Jubail |
Start Date |
01/10/15 |
End Date |
01/03/17 |
Scope of work |
The scope of work includes the supplying, rigging, erecting, and dismantling of tower built scaffolding, independent tied scaffolding, suspended scaffolding, cantilevered scaffolding, special scaffolding, mobile tower scaffolding, vessel/column/tank exterior scaffolding, and vessel/ column/tank interior scaffolding, and the provision of scaffolding maintenance services including site cleanup.
|
|
SADARA |
Jubail |
01/10/15 |
01/03/17 |
Petrochemical |
Installation of DEG Aldehyde Removal System (EG-1)
Sector |
Petrochemical |
Project Title |
Installation of DEG Aldehyde Removal System (EG-1) |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/15 |
End Date |
01/04/16 |
Scope of work |
Scope of Work includes Procurement, Designing, Engineering including following activities
Piping Modification for the installation of BED Drum & PSV. Scaffolding, Construction of RCC foundation, Electrical & Instrumentation Work includes Design, Engineering, Supply , Installation and function testing of Rotameter, Pressure Guages, Transmitters, Cable Pulling & Installation of Conduit from new instrument to the existing Ones. Relay setting, Testing & Commissioning.
|
|
UNITED |
Jubail |
01/10/15 |
01/04/16 |
Mining & Minerals |
18% FSA Line & Belt Filter Close Loop Washing Spill Back Line
Sector |
Mining & Minerals |
Project Title |
18% FSA Line & Belt Filter Close Loop Washing Spill Back Line |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/03/17 |
Scope of work |
‘18% FSA Line & Belt Filter Close Loop Washing Spill Back Line
|
|
Ma'aden Phosphate |
Jubail |
01/03/15 |
01/03/17 |
Petrochemical |
Installation of Drum Loading Station
Sector |
Petrochemical |
Project Title |
Installation of Drum Loading Station |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/15 |
End Date |
01/04/16 |
Scope of work |
This project involves all the discipline Mechanical, E & I, Civil, Scaffolding. Fabrication and Erection of Piping and Pipe Supports, Erection of Steel Structure, Fiber Optic Cable and Power Cable Laying, along with Civil, Scaffolding works,
|
|
UNITED |
Jubail |
01/10/15 |
01/04/16 |
Metal |
69649253 Mechanical Installation DEDUSTING / HADEED
Sector |
Metal |
Project Title |
69649253 Mechanical Installation DEDUSTING / HADEED |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/15 |
End Date |
01/01/16 |
Scope of work |
The poject involves Mechanical Installation Desdusting including Piping, Equipment Erection and Structural Erection works.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/07/15 |
01/01/16 |
Metal |
69649253 Mechanical Installation MaterialHandling Services
Sector |
Metal |
Project Title |
69649253 Mechanical Installation MaterialHandling Services |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/15 |
End Date |
01/01/16 |
Scope of work |
The project involves Material Handling Services including Equipment Erection and Structural Erec ction works.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/07/15 |
01/01/16 |
Metal |
Hadeed – SPLP1, Upgradation of CCM3, Dedusting System / Material Handling System
Sector |
Metal |
Project Title |
Hadeed – SPLP1, Upgradation of CCM3, Dedusting System / Material Handling System |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
E&I |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/01/16 |
Scope of work |
Project involves upgradation Continious Casting Machine, Dedusting Plant & Material Handling System. Disconnection and Reconnection of 3.5MVA oil Transformer, Installation and Connection of Cast Resin Transformer (1.6MVA & 1.25MVA), Upgradation of vibrating Feeder of Silos, Conveyor Belt Electrics & Automation. Removal & Installation of Panels (New Dedusting Electric Building, Material Handling Load Center Room, Kuttner Room, EAF1PLC Room). Dismantling entire existing CCM3 equipment, structure and piping. Disposal of all dismantled Structures, Equipment at Hadeed laydown area. Installation of new Structures and Equipment. Installation of Utility Equipment.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/06/15 |
01/01/16 |
Oil & Gas |
Controlled Bolting & onsite machining services for DGA shutdown
Sector |
Oil & Gas |
Project Title |
Controlled Bolting & onsite machining services for DGA shutdown |
Project Owner |
Saudi Aramco |
Client |
Aramco Khurais |
Department |
BT |
Location |
Khurais |
Start Date |
01/06/15 |
End Date |
01/04/16 |
Scope of work |
Controlled Bolting & onsite machining services for DGA shutdown
|
|
Aramco Khurais |
Khurais |
01/06/15 |
01/04/16 |