Oil & Gas |
L&T Air Products E & I Work
Sector |
Oil & Gas |
Project Title |
L&T Air Products E & I Work |
Project Owner |
|
Client |
L&T Hydrocarbon Saudi Company |
Department |
|
Location |
Jubail |
Start Date |
17-Jul-2022 |
End Date |
17-Aug-2023 |
Scope of work |
SENDAN’s scope covers Installation, testing and pre-commissioning of Electrical
& Instrumentation works which is to be executed as per Air products- Electrical & Instrumentation standards and specification. The project scope is installation of transformer and NGR, Cable Tray, Steel support, Junction box, conduit, Cable Pulling, Lighting Fixtures, Lighting Pole, Glanding and Termination, Scaffolding, CCTV, Heat tracing and instrument jobs. Summarized Qty is mentioned in the next slide.
|
|
L&T Hydrocarbon Saudi Company |
Jubail |
17-Jul-2022 |
17-Aug-2023 |
Water |
Major Repair Work Of IZ MTBE Tank (IZ 900SI) At Sabtank
Sector |
Water |
Project Title |
Major Repair Work Of IZ MTBE Tank (IZ 900SI) At Sabtank |
Project Owner |
|
Client |
Saudi Basic Industries Corporation |
Department |
|
Location |
Jubail |
Start Date |
24-May-2022 |
End Date |
24-May-2023 |
Scope of work |
Major Repair Works & Cathodic Protection for the Bottom Plate of Tanks
Civil Works:
1.Removal of existing sand
2.Backfilling & New Sweet Sand (Excavation)
3.HDPE Liner
4.Asphalt Repair
Mechanical Works:
1.Bottom Plate Inspection & Repair Work Replacement for Tank
2.Cathodic protection for the Bottom Plate for Tank
|
|
Saudi Basic Industries Corporation |
Jubail |
24-May-2022 |
24-May-2023 |
Oil & Gas |
Upgrade Fire Protection & Industrial Drainage System at Abha Bulk Plant
Sector |
Oil & Gas |
Project Title |
Upgrade Fire Protection & Industrial Drainage System at Abha Bulk Plant |
Project Owner |
Saudi Aramco |
Client |
Saudi Aramco/ Abha Bulk Plant |
Department |
|
Location |
Abha |
Start Date |
12-Feb-2022 |
End Date |
13-Feb-2025 |
Scope of work |
The purpose of this project is to upgrade the fire protection systems and industrial drainage systems at Abha Bulk Plant to meet safety requirements.
The major part of the scope of work includes Demolish and Installation of Fire Hydrants, Erection of Vertical Turbine OWS Pumps,
Fire Alarm Control System, Process Control System,
Fire Detection Systems, UPS Systems
Pressure & Control Valves, Protection Relay
Cathodic Protection Systems, Oily Water Separator (CPI), Firewater Pump (Diesel Engine Driven)
Firewater Pump (Electrical Engine Driven)
Emergency Siren System (LSPB).
|
|
Saudi Aramco/ Abha Bulk Plant |
Abha |
12-Feb-2022 |
13-Feb-2025 |
Oil & Gas |
Abha Fire Protection And Industrial Draining System
Sector |
Oil & Gas |
Project Title |
Abha Fire Protection And Industrial Draining System |
Project Owner |
|
Client |
Saudi Arabian Oil Company |
Department |
|
Location |
Abha |
Start Date |
12-Feb-2022 |
End Date |
13-Feb-2025 |
Scope of work |
The purpose of this project is to upgrade the fire protection systems and industrial drainage systems at Abha Bulk Plant to meet safety requirements (LSPB).
The major part of the scope of work includes Demolish and Installation of Fire Hydrants, Erection of Vertical Turbine OWS Pumps, Fire Alarm Control System, Process Control System, Fire Detection Systems, UPS Systems, Pressure & Control Valves, Protection Relay, Cathodic Protection Systems, Oily Water Separator (CPI), Firewater Pump (Diesel Engine Driven), Firewater Pump (Electrical Engine Driven) and Emergency Siren System.
|
|
Saudi Arabian Oil Company |
Abha |
12-Feb-2022 |
13-Feb-2025 |
Oil & Gas |
Replace Crude Oil Samplers Units for Yanbu North Terminal
Sector |
Oil & Gas |
Project Title |
Replace Crude Oil Samplers Units for Yanbu North Terminal |
Project Owner |
Saudi Aramco |
Client |
Saudi Aramco/ Yanbu North Terminal |
Department |
|
Location |
Yanbu |
Start Date |
26 Sep 2021 |
End Date |
8 Feb 2023 |
Scope of work |
The project scope of work includes Engineering, Procurement, Construction/Installation of Sampling System for Berth 61, 62 and 64 at Yanbu North Terminal
The automatic sampling system for Berth 61 and 64 will be installed upstream the metering skid for above ground 56” crude loading pipeline at CTF.
|
|
Saudi Aramco/ Yanbu North Terminal |
Yanbu |
26 Sep 2021 |
8 Feb 2023 |
Oil & Gas |
Ras Tanura Pipeline
Sector |
Oil & Gas |
Project Title |
Ras Tanura Pipeline |
Project Owner |
|
Client |
Saudi Aramco Total Refining & Petrochem |
Department |
|
Location |
Ras Tanura |
Start Date |
5-Apr-2021 |
End Date |
31-Dec-2022 |
Scope of work |
The Project is to install a 20″ Pipeline to transfer Ultra Low sulfur Diesel product. The pipeline shall be build with associated supporting facilities to transport the product from Company to Saudi Aramco distribution network to meet the long term demand of Diesel in Eastern & Central region of Saudi Arabia.
|
|
Saudi Aramco Total Refining & Petrochem |
Ras Tanura |
5-Apr-2021 |
31-Dec-2022 |
Oil & Gas |
Upgrade Fire Protection System for AXL and Gas Condensate Tanks at Abqaiq Plants
Sector |
Oil & Gas |
Project Title |
Upgrade Fire Protection System for AXL and Gas Condensate Tanks at Abqaiq Plants |
Project Owner |
Saudi Aramco |
Client |
Saudi Aramco/ Abqaiq Plants |
Department |
|
Location |
Abqaiq |
Start Date |
17-Jan-21 |
End Date |
16-Jan-23 |
Scope of work |
The project scope covers the design for new non-contact-type Radar level transmitter installation for existing floating roof storage tanks and Installation of linear heat detection system (LHD) and replacement of existing Rim Seal Fire Protection system including foam system network piping, foam chambers for existing five (5) Stabilized Crude Storage Tanks at Abqaiq plants.
|
|
Saudi Aramco/ Abqaiq Plants |
Abqaiq |
17-Jan-21 |
16-Jan-23 |
Mining & Minerals |
General Construction Works for Dew Point Control Unit (DPCU), Abqaiq Plants
Sector |
Mining & Minerals |
Project Title |
General Construction Works for Dew Point Control Unit (DPCU), Abqaiq Plants |
Project Owner |
Saudi Aramco |
Client |
JGC Gulf International Co. Ltd. |
Department |
|
Location |
Abqaiq |
Start Date |
18-May-2022 |
End Date |
31-Oct-2024 |
Scope of work |
The primary objective of this project is to provide a new gas dew point control unit (DPCU) at Abqaiq NGL Plants as a permanent solution to resolve liquid condensation and accumulation in the gas pipelines.
As Gen-Con Construction Contractor major scope is to carryout complete Civil Works, Steel Structure Erection (Conventional and Conex-tech), Equipment Installation and Piping, Electrical and instrumentation, Painting, Insulation and Fire Proofing Works.
|
|
JGC Gulf International Co. Ltd. |
Abqaiq |
18-May-2022 |
31-Oct-2024 |