Petrochemical |
Installation of New Cables and Trays
Sector |
Petrochemical |
Project Title |
Installation of New Cables and Trays |
Project Owner |
Sadara |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
26/07/16 |
End Date |
01/09/17 |
Scope of work |
Detail Job Scope
i.,,Procure and Lay new cable tray per Sadara Specification and remove the existing cable and tray of Control valves ABV-830410
ii.,,ABV-830410 & FV-830402 valves cable testing, termination, loop checks etc.
iii.,,Procure required bulk components if any for to carryout above.
iv.. Performing all pre-commissioning activities of Cable testing, loop check etc.
|
|
SADARA |
Jubail |
26/07/16 |
01/09/17 |
Petrochemical |
Control valve reinstallation and removel T/A 2016
Sector |
Petrochemical |
Project Title |
Control valve reinstallation and removel T/A 2016 |
Project Owner |
Saudi Chevron |
Client |
Saudi Fal |
Department |
PSD |
Location |
Jubail |
Start Date |
25/07/16 |
End Date |
01/01/17 |
Scope of work |
Control valve reinstallation and removel T/A 2016
Scope of work includes, Lifting, Welding, Installation & Transportation.
|
|
Saudi Fal |
Jubail |
25/07/16 |
01/01/17 |
Petrochemical |
Instrumentation-Modification activities for EJN-00100_Pygas-Benzene_Jumpers_FSTF-RC_corridor-Port
Sector |
Petrochemical |
Project Title |
Instrumentation-Modification activities for EJN-00100_Pygas-Benzene_Jumpers_FSTF-RC_corridor-Port |
Project Owner |
Sadara |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
24/07/16 |
End Date |
01/04/17 |
Scope of work |
To Install a jumper Line between Pyga line and Benzene Line at FSTFBattery Limit to carry high quality(Nitrogen grade) benzene from port to purchased benzene tank in FSTF.
|
|
SADARA |
Jubail |
24/07/16 |
01/04/17 |
Oil & Gas |
Testing of Earthing Pit and Lighting
Sector |
Oil & Gas |
Project Title |
Testing of Earthing Pit and Lighting |
Project Owner |
SABIC |
Client |
Gas Yanbu |
Department |
PSD |
Location |
Yanbu |
Start Date |
18/07/16 |
End Date |
01/01/17 |
Scope of work |
The Scope of Work for this job involves the Preventive Maintenance of the Phase-I/II/III Grounding and lightning system.To do the Inspection of the complete grounding and lightning system & list any abnormalities observed. Cleaning & Tagging of earthing Pit.To review the Location of all electrodes in reference to the As-built drawings & inform any abnormality.To do survey of Lightning system and Condition Monitoring of all related Equipments.
|
|
Gas Yanbu |
Yanbu |
18/07/16 |
01/01/17 |
Petrochemical |
CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
Sector |
Petrochemical |
Project Title |
CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V |
Project Owner |
SABIC / Ar-Razi |
Client |
MHI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/12/16 |
Scope of work |
CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
|
|
MHI |
Jubail |
01/06/16 |
01/12/16 |
Oil & Gas |
EXECUTION OF MULTIPLE MOCs
Sector |
Oil & Gas |
Project Title |
EXECUTION OF MULTIPLE MOCs |
Project Owner |
YASREF |
Client |
YASREF |
Department |
PSD |
Location |
Yanbu |
Start Date |
10/07/16 |
End Date |
01/12/16 |
Scope of work |
The scope includes installation of new piping spools, valves and pressure transmitter, internal coating of coolant drums, electrical and instrumentation works. . To supply of material to be used for site execution and commissioning activities. To perform Hydro testing , Flushing, Draining & Pre-commissioning activities.
|
|
YASREF |
Yanbu |
10/07/16 |
01/12/16 |
Oil & Gas |
SFC-for Bolt Torqueing activities at 474 Tr 200
Sector |
Oil & Gas |
Project Title |
SFC-for Bolt Torqueing activities at 474 Tr 200 |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
BT |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/01/17 |
Scope of work |
Bolt Torquing & Tensioning Services at BGP during the T&I
|
|
Berri Gas Plant |
Jubail |
01/06/16 |
01/01/17 |
Petrochemical |
Design of Temporary Support Project
Sector |
Petrochemical |
Project Title |
Design of Temporary Support Project |
Project Owner |
SABIC |
Client |
YANPET |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/06/16 |
End Date |
01/01/16 |
Scope of work |
The Scope Includes,
To design the temporary supports to with stand the load of pipes (live load), To remove the existing civil support &To fabricate, supply & Install the temporary support at the location.
|
|
YANPET |
Yanbu |
01/06/16 |
01/01/16 |